Public:ARHUDFM FAQ: Difference between revisions
| Line 1,289: | Line 1,289: | ||
{| | {| | ||
|- | |- | ||
| "''Current Virtual Training'' | | "''Current Virtual Training'' || ''Future Training (STE)'' | ||
* unrealistic: sterile, predictable and contrived; | I* unrealistic: sterile, predictable and contrived; ||* realistic terrain, effects and interaction; | ||
* lacks dynamism; | |* lacks dynamism; ||* dynamic, trains problem-solving and mission command; | ||
* does not simulate human interaction; | |* does not simulate human interaction; ||* simulates human interaction and population dynamics; | ||
* poor data collection; | |* poor data collection; ||* collects and analyzes vast quantities of data; | ||
* does not train cross-domain convergence; | |* does not train cross-domain convergence; ||* enables multi-domain training; | ||
* systems are outdated and not interoperable; | |* systems are outdated and not interoperable; ||* all systems are interoperable; | ||
* difficult to access, facility-specific, long wait times; and | |* difficult to access, facility-specific, long wait times; and ||* available at the point of need; and | ||
* 4–6 months to set up, inconsistently compatible formats. || ''Future Training (STE)'' | |* 4–6 months to set up, inconsistently compatible formats.|| * immediate simulations of any terrain through One World Terrain."<ref>Second Lieutenant Jeremiah Rozman, U.S. Army, PhD, [https://www.ausa.org/publications/synthetic-training-environment "The synthetic training environment"], "AUSA", (Arlington, VA: Association of the United States Army - AUSA, December 10, 2020)</ref><ref>Joe Lacdan, [https://www.army.mil/article/222722/army_testing_synthetic_training_environment_platforms "Army testing synthetic training environment platforms"], "army.mil", (6000 Defense Pentagon | ||
Washington, D.C. 20301-6000: Office of the Department of Defense, Chief Information Officer - U.S. DoD, October 8, 2019)</ref> | |||
|} | |||
''Future Training (STE)'' | |||
* realistic terrain, effects and interaction; | * realistic terrain, effects and interaction; | ||
* dynamic, trains problem-solving and mission command; | * dynamic, trains problem-solving and mission command; | ||
| Line 1,307: | Line 1,311: | ||
* immediate simulations of any terrain through One World Terrain."<ref>Second Lieutenant Jeremiah Rozman, U.S. Army, PhD, [https://www.ausa.org/publications/synthetic-training-environment "The synthetic training environment"], "AUSA", (Arlington, VA: Association of the United States Army - AUSA, December 10, 2020)</ref><ref>Joe Lacdan, [https://www.army.mil/article/222722/army_testing_synthetic_training_environment_platforms "Army testing synthetic training environment platforms"], "army.mil", (6000 Defense Pentagon | * immediate simulations of any terrain through One World Terrain."<ref>Second Lieutenant Jeremiah Rozman, U.S. Army, PhD, [https://www.ausa.org/publications/synthetic-training-environment "The synthetic training environment"], "AUSA", (Arlington, VA: Association of the United States Army - AUSA, December 10, 2020)</ref><ref>Joe Lacdan, [https://www.army.mil/article/222722/army_testing_synthetic_training_environment_platforms "Army testing synthetic training environment platforms"], "army.mil", (6000 Defense Pentagon | ||
Washington, D.C. 20301-6000: Office of the Department of Defense, Chief Information Officer - U.S. DoD, October 8, 2019)</ref> | Washington, D.C. 20301-6000: Office of the Department of Defense, Chief Information Officer - U.S. DoD, October 8, 2019)</ref> | ||
"''Current Virtual Training'' | "''Current Virtual Training'' | ||
| Line 1,319: | Line 1,322: | ||
* 4–6 months to set up, inconsistently compatible formats. | * 4–6 months to set up, inconsistently compatible formats. | ||
<br> | <br> | ||
<gallery mode="packed-hover" heights=260px> | <gallery mode="packed-hover" heights=260px> | ||