<itimeline end="2025-03-01" min="2023-01-01" max="2025-12-31">
<!-- Mechanical<br> Engineering -->
<!-- Sprint 1-6: 2023-06-30 -->
2023-06-30|Mechanical<br> Engineering|Structural improvement
2023-06-30|Mechanical<br> Engineering|External and internal visors
<!-- Sprint 7-12: 2023-09-30 -->
2023-09-30|Mechanical<br> Engineering|Injection molds
<!-- Sprint 13-18: 2023-12-31 -->
2023-12-31|Mechanical<br> Engineering|SCBA integration
2023-12-31|Mechanical<br> Engineering|External aramid cover
2023-12-31|Mechanical<br> Engineering|Test stand
<!-- Sprint 19-24: 2024-03-31 -->
2024-03-31|Mechanical<br> Engineering|Technological cards and specs
<!-- Sprint 25-30: 2024-06-30 -->
2024-06-30|Mechanical<br> Engineering|{{#inline-tooltip: Production area | Production area for vacuum casting, injection molding, machining areas}}
<!-- Sprint 31-36: 2024-09-30 -->
2024-09-30|Mechanical<br> Engineering|Robotic assembly area
<!-- Sprint 37-42: 2024-12-31 -->
<!-- Sprint 43-48: 2025-03-31 -->
<!-- Optical<br> Engineering -->
<!-- Sprint 1-6: 2023-06-30 -->
<!-- Sprint 7-12: 2023-09-30 -->
2023-09-30|Optical<br> Engineering|Optical fiber scheme
2023-09-30|Optical<br> Engineering|Fine-tuning of imaginary focus
2023-09-30|Optical<br> Engineering|Variable dimming of visor areas
<!-- Sprint 13-18: 2023-12-31 -->
2023-12-31|Optical<br> Engineering|Test stand
<!-- Sprint 19-24: 2024-03-31 -->
2024-03-31|Optical<br> Engineering|Optical nanocoatings specs
<!-- Sprint 25-30: 2024-06-30 -->
<!-- Sprint 31-36: 2024-09-30 -->
<!-- Sprint 37-42: 2024-12-31 -->
<!-- Sprint 43-48: 2025-03-31 -->
<!-- Electronics<br> Engineering -->
<!-- Sprint 1-6: 2023-06-30 -->
2023-06-30|Electronics<br> Engineering|Power, charging, LED, cooling circuits
2023-06-30|Electronics<br> Engineering|Audio circuit
2023-06-30|Electronics<br> Engineering|Bluetooth integration with ext. devices
<!-- Sprint 7-12: 2023-09-30 -->
2023-09-30|Electronics<br> Engineering|Joystick and button control circuit
2023-09-30|Electronics<br> Engineering|Camera settings, stereo mode, measurements
<!-- Sprint 13-18: 2023-12-31 -->
2023-12-31|Electronics<br> Engineering|Testing with an plug-in handheld radio headset
2023-12-31|Electronics<br> Engineering|SDR receiver, scanner and spectrum analyser circuits
<!-- Sprint 19-24: 2024-03-31 -->
2024-03-31|Electronics<br> Engineering|RDF circuit
2024-03-31|Electronics<br> Engineering|Sensor data transfer to screen
2024-03-31|Electronics<br> Engineering|SDR receiver-transmitter cirsuit
2024-03-31|Electronics<br> Engineering|
2024-03-31|Electronics<br> Engineering|Test stand
<!-- Sprint 25-30: 2024-06-30 -->
2024-06-30|Electronics<br> Engineering|Technological cards and specs
<!-- Sprint 31-36: 2024-09-30 -->
2024-12-31|Electronics<br> Engineering|Vitals body sensors
<!-- Sprint 37-42: 2024-12-31 -->
<!-- Sprint 43-48: 2025-03-31 -->
<!-- Software<br> Development -->
<!-- Sprint 1-6: 2023-06-30 -->
2023-06-30|Software<br> Development|GUI
<!-- Sprint 7-12: 2023-09-30 -->
2023-09-30|Software<br> Development|Software control of cameras, audio, joystick, projector
2023-09-30|Software<br> Development|Digital zoom up to 8x
<!-- Sprint 13-18: 2023-12-31 -->
2023-12-31|Software<br> Development|Speech-to-text
2023-12-31|Software<br> Development|Virtual keyboard
2023-12-31|Software<br> Development|Hands Tracking
2023-12-31|Software<br> Development|Rear view camera, external cameras view
2023-12-31|Software<br> Development|Thermal imaging camera, HD cam noIR night mode
<!-- Sprint 19-24: 2024-03-31 -->
2024-03-31|Software<br> Development|Maps and mapping
2024-03-31|Software<br> Development|GNSS positioning, incl. GPS, Galileo, Glonass
2024-03-31|Software<br> Development|Navigation system, ATAK-MIL integration
2024-03-31|Software<br> Development|Route planning and path tracking (AI)
2024-03-31|Software<br> Development|Compass, navigation grid
2024-03-31|Software<br> Development|SDR receiver, scanner and spectrum analyser
<!-- Sprint 25-30: 2024-06-30 -->
2024-06-30|Software<br> Development|SDR UHF/VHF receiver-transmitter
2024-06-30|Software<br> Development|SDR AES based COMSEC/TRANSEC encryption-descryption
2024-06-30|Software<br> Development|Icon messaging system and text messaging system
2024-06-30|Software<br> Development|Image and data exchange, videoconference system
2024-06-30|Software<br> Development|1:N and N:N multichannel communication system
2024-06-30|Software<br> Development|p2p network, distributed computing
2024-06-30|Software<br> Development|RDF system, Friend-or-Foe Id System, passive radar detection
2024-06-30|Software<br> Development|Geo positions capture and exchange, auto-tracking (AI)
2024-06-30|Software<br> Development|Mixed video, silhouette highlighting (CV)
2024-06-30|Software<br> Development|Stereo camera, digital zoom (24x) and measurements (CV)
2024-06-30|Software<br> Development|Face and object recognition (CV)
<!-- Sprint 31-36: 2024-09-30 -->
2024-09-30|Software<br> Development|Ballistic calculation, correction mode, shot history
2024-09-30|Software<br> Development|Target lock & track, target detection and hit tracking (CV, AI)
2024-09-30|Software<br> Development|Speed measurement, preemptive calculation (CV, AI)
2024-09-30|Software<br> Development|Digital aiming assistance and aiming device integration
2024-09-30|Software<br> Development|Task management system, checklist tracking, auto-log
2024-09-30|Software<br> Development|Connectivity with C4I, EW systems and Battle Management Systems
<!-- Sprint 37-42: 2024-12-31 -->
2024-12-31|Software<br> Development|Ambient sound filter (CH)
2024-12-31|Software<br> Development|Vitals body (SpO₂, ETCO₂, PR, HR, NIBP, TEMP, HYDRL) data-driven monitoring
2024-12-31|Software<br> Development|Connectivity with remote active phased radar
2024-12-31|Software<br> Development|Motion and flashes detection (CV)
2024-12-31|Software<br> Development|Missile engines heat & smoke traces (CV)
2024-12-31|Software<br> Development|Detection of booby traps (CV)
2024-12-31|Software<br> Development|Connectivity with external ground-penetrating radar
<!-- Sprint 43-48: 2025-03-31 -->
2025-03-31|Software<br> Development|Connectivity with Live-Synthetic Training Environment systems
<!-- Networking -->
<!-- Sprint 1-6: 2023-06-30 -->
2023-04-01/2025-03-31|Networking|[[Media Development|PR, Influencers]]
<!-- Sprint 7-12: 2023-09-30 -->
2023-09-30|Networking|Defense/Hw Acceleration program
<!-- Sprint 13-18: 2023-12-31 -->
2023-04-01/2025-03-31|Networking|Collaboration networking
<!-- Sprint 19-24: 2024-03-31 -->
<!-- Sprint 25-30: 2024-06-30 -->
<!-- Sprint 31-36: 2024-09-30 -->
<!-- Sprint 37-42: 2024-12-31 -->
<!-- Sprint 43-48: 2025-03-31 -->
2023-04-01/2025-03-31|Networking|Mentorship
<!-- Sprint 37-42: 2024-12-31 -->
<!-- Sprint 43-48: 2025-03-31 -->
<!-- Customer &<br> Business<br> Development -->
<!-- Sprint 1-6: 2023-06-30 -->
<!-- Sprint 7-12: 2023-09-30 -->
2023-09-30|Customer &<br> Business<br> Development|Prototype Demo
2023-09-30|Customer &<br> Business<br> Development|Pre-seed round
<!-- Sprint 13-18: 2023-12-31 -->
<!-- Sprint 19-24: 2024-03-31 -->
2024-03-31|Customer &<br> Business<br> Development|MVP Alpha Demo
2024-03-31|Customer &<br> Business<br> Development|Seed round
<!-- Sprint 25-30: 2024-06-30 -->
2024-06-30/2025-03-31|Customer &<br> Business<br> Development|Field tests, expert opinions (Customer validation)
2024-06-30|Customer &<br> Business<br> Development|MVP Beta Demo
<!-- Sprint 31-36: 2024-09-30 -->
2024-09-30|Customer &<br> Business<br> Development|Sales Funnel
2024-09-30|Customer &<br> Business<br> Development|Product-Market Fit
2024-09-30|Customer &<br> Business<br> Development|Sales & Marketing Roadmap
2024-09-30|Customer &<br> Business<br> Development|Business Model
2024-09-30|Customer &<br> Business<br> Development|Round A
<!-- Sprint 37-42: 2024-12-31 -->
<!-- Sprint 43-48: 2025-03-31 -->
2025-03-31|Customer &<br> Business<br> Development|MMP Demo
</itimeline><section end="Roadmap1" />


===Design Development & Algorithm Architecture: Ada Lovelace<ref>Wikipedia, [[wikipedia:Ada_Lovelace|Ada Lovelace]]</ref> Team===
===Design Development & Algorithm Architecture: Ada Lovelace<ref>Wikipedia, [[wikipedia:Ada_Lovelace|Ada Lovelace]]</ref> Team===

Revision as of 21:26, 22 September 2023

Traction

Unable to compile EasyTimeline input:

EasyTimeline 1.90


Timeline generation failed: More than 10 errors found
Line 117: color:TRL5 from:20/08/2023 till:01/11/2024

- Plotdata attribute 'till' invalid.

 Date '01/11/2024' not within range as specified by command Period.



Line 143: color:PROCESS from:21/09/2023 till:01/11/2024

- Plotdata attribute 'till' invalid.

 Date '01/11/2024' not within range as specified by command Period.



Line 148: color:PROCESS from:01/04/2020 till:01/11/2024

- Plotdata attribute 'till' invalid.

 Date '01/11/2024' not within range as specified by command Period.



Line 151: color:PROCESS from:14/06/2020 till:01/11/2024

- Plotdata attribute 'till' invalid.

 Date '01/11/2024' not within range as specified by command Period.



Line 154: color:PROCESS from:08/07/2020 till:01/11/2024

- Plotdata attribute 'till' invalid.

 Date '01/11/2024' not within range as specified by command Period.



Line 178: color:PROCESS from:01/07/2023 till:01/11/2024

- Plotdata attribute 'till' invalid.

 Date '01/11/2024' not within range as specified by command Period.



Line 191: color:TRL3 from:07/04/2023 till:01/11/2024

- Plotdata attribute 'till' invalid.

 Date '01/11/2024' not within range as specified by command Period.



Line 195: color:TRL2 from:10/08/2023 till:01/11/2024

- Plotdata attribute 'till' invalid.

 Date '01/11/2024' not within range as specified by command Period.



Line 199: color:TRL2 from:19/08/2023 till:01/11/2024

- Plotdata attribute 'till' invalid.

 Date '01/11/2024' not within range as specified by command Period.



Line 202: color:TRL5 from:14/04/2023 till:01/11/2024

- Plotdata attribute 'till' invalid.

 Date '01/11/2024' not within range as specified by command Period.



Line 205: color:PROCESS from:26/05/2021 till:01/11/2024

- Plotdata attribute 'till' invalid.

 Date '01/11/2024' not within range as specified by command Period.



TRL NASA usage DoD usage[1] European Union
1 Basic principles observed and reported Scientific research begins to be translated into applied R&D Basic principles observed
2 Technology concept and/or application formulated Invention begins. Once basic principles are observed, practical applications can be invented Technology concept formulated
3 Analytical and experimental critical function and/or characteristic proof-of concept Active R&D is initiated. This includes analytical studies to produce code and laboratory studies to physically validate analytical predictions of separate technology HW/SW elements Experimental proof of concept
4 Component and/or breadboard validation in laboratory environment Basic technological components are integrated to establish that they will work together. System SW architecture development initiated to include interoperability, reliability, maintainability, extensibility, scalability and security issues Technology validated in lab
5 Component and/or breadboard validation in relevant environment The basic technological HW/SW components are integrated with reasonably realistic supporting elements so that they can be tested in a simulated environment Technology validated in relevant environment (industrially relevant environment in the case of key enabling technologies)
6 System/subsystem model or prototype demonstration in a relevant environment (ground or space) Examples include testing a prototype in a high-fidelity lab environment or a live/virtual experiment or in a simulated operational environment Technology demonstrated in relevant environment (industrially relevant environment in the case of key enabling technologies)
7 System prototype demonstration in a space environment Prototype near, or at, planned operational system. Algorithms run on processor of the operational environment integrated with actual external entities. SW support structure in place. SW releases are in distinct versions. Frequency and severity of SW deficiency reports do not significantly degrade functionality or performance. Verification, Validation and Accreditation (VV&A) completed System prototype demonstration in operational environment
8 Actual system completed and "flight qualified" through test and demonstration (ground or space) Technology and SW has been proven and demonstrated to work in its final form and under expected conditions. In almost all cases, TRL represents the end of true system development. Examples include developmental test and evaluation (T&E) of the system in its intended weapon system to determine if it meets design specifications System complete and qualified
9 Actual system "flight proven" through successful mission operations In almost all cases, this is the end of the last “bugfixing” aspects of system development. Examples include using the system under operational mission conditions. SW releases are production versions and configuration controlled. Frequency and severity of SW deficiencies are at a minimum Actual system proven in operational environment (competitive manufacturing in the case of key enabling technologies; or in space)

Roadmap

New

Public:ARHUDFM Features Summary

Design Development & Algorithm Architecture: Ada Lovelace[2] Team

Device design, GUI, VUI, Apps algorithms, Demos, Videos, Animations

  • Prio #1: [TRL 1-2] Research and description of the principle of operation, description of the technology application, computer-added design
  • Prio #2: [TRL 3-4] Technology functionality demo, specific functionality description, GUI demo, lab experimental setup
  • Prio #3:
  • Prio #4:

Mechanical Engineering: Stephanie Kwolek[3] Team

  • Prio #1: [TRL 5-6] Prototype: based on 3D print, vacuum casting, vacuum unfusion
  • Prio #2: [TRL 7] MVPα: vacuum casting, vacuum unfusion, injection moulding, manual assembly
  • Prio #3: [TRL 8] MVPβ: vacuum casting, vacuum unfusion, injection moulding, manual assembly
  • Prio #4: [TRL 9] MMPδ: manufacturing process automation, robotic assembly, add-ons (auto tourniquets, Care Under Fire set)
  • Prio #5: MMPγ: manufacturing & assembly & logistic process upgrade

Optical Engineering: Katharine Blodgett[4] Team

Light guide, Beam splitting prisms, Dichroic mirror, Optical coatings, Fading pads

  • Prio #1: [TRL 5-6] Prototype: optical scheme, light guide, dichroic mirror, fading pads
  • Prio #2: [TRL 7] MVPα: beam splitting prisms for 3 cam sensors, optical coatings
  • Prio #3: [TRL 8] MVPβ:
  • Prio #4: [TRL 9] MMPδ:
  • Prio #5: MMPγ:

Electronics Engineering: Ida Hyde[5] Team

Schematics and PCBs for motherboard, projector, IFF Transponder, SDR, SDRS, PCSR, Digital sight

  • Prio #1: [TRL 5-6] Prototype: based on Raspberry Pi 4B, Texas Instruments DLPDLCR2000EVM
  • Prio #2: [TRL 7] MVPα: motherboard chipset Intel Z790, CPU Intel Core i7-13850HX, DLP PCB, SDRS PCB, IFF PCB
  • Prio #3: [TRL 8] MVPβ: SDR2 PCB, add-on (software defined antenna, optional battery, continuous wind capture impellers)
  • Prio #4: [TRL 9] MMPδ: add-on (auto tourniquets, Care Under Fire set, handheld metal re-radiation radar)
  • Prio #5: MMPγ: add-on (digital sight)

Software Development: Hedy Lamarr[6] Team

SDR, SDR Scan, RDF, Radar Detection, IFF, Networks, Remote control

Software Development: Grace Hopper[7] Team

System Integration, DevOps, Maps, VBS, Sensors

Software Development: Evelyn Berezin[8] Team

IMS, Chat, Workgroups, Tasks, Mission planning

Software Development: Barbara Askins[9] Team

Computer Vision, Computer Audition, AI/ML, AI/DL, AI/NLP, AI/ANN

Networking: Margaret Hamilton[10] Team

Mentor Relations, Pitches, Updates

  • Prio #1: Mentor Relations, Updates
  • Prio #2: Business angels (pre-seed round)
  • Prio #3: Business angels & Venture capital (seed round)
  • Prio #4: Venture capital (round A)
  • Prio #5:

Customer & Business Development: Barbara Liskov[11] Team

Requests, eMails, PR, Meetings

  • Prio #1: Innovation programs research, requests, eMails, meetings
  • Prio #2: Collaboration research, PR
  • Prio #3: Proving ground testing
  • Prio #4: Pilot programms

Future ideas

Further reading

FAQ

See also

Public External Sections: Public Wiki Sections: Public Wiki Sections: Not-Public Wiki Sections:

Note: Unless otherwise stated, whenever the masculine gender is used, both men and women are included.

See also product details

Hardware Details: Functional Apps Details: Executive Apps Details: Service Apps Details:


References

  1. Dr. John Niemela and Dr. Matthew Fisher, The Use of Technology Readiness Levels for Software Development
  2. Wikipedia, Ada Lovelace
  3. Wikipedia, Stephanie Kwolek
  4. Wikipedia, Katharine Burr Blodgett
  5. Wikipedia, Ida Henrietta Hyde
  6. Wikipedia, Hedy Lamarr
  7. Wikipedia, Grace Hopper
  8. Wikipedia, Evelyn Berezin
  9. Wikipedia, Barbara Askins
  10. Wikipedia, Margaret Hamilton
  11. Wikipedia, Barbara Liskov

External links