Public:ARHUDFM Traction
Traction
TRL | NASA usage | DoD usage[1] | European Union |
---|---|---|---|
1 | Basic principles observed and reported | Scientific research begins to be translated into applied R&D | Basic principles observed |
2 | Technology concept and/or application formulated | Invention begins. Once basic principles are observed, practical applications can be invented | Technology concept formulated |
3 | Analytical and experimental critical function and/or characteristic proof-of concept | Active R&D is initiated. This includes analytical studies to produce code and laboratory studies to physically validate analytical predictions of separate technology HW/SW elements | Experimental proof of concept |
4 | Component and/or breadboard validation in laboratory environment | Basic technological components are integrated to establish that they will work together. System SW architecture development initiated to include interoperability, reliability, maintainability, extensibility, scalability and security issues | Technology validated in lab |
5 | Component and/or breadboard validation in relevant environment | The basic technological HW/SW components are integrated with reasonably realistic supporting elements so that they can be tested in a simulated environment | Technology validated in relevant environment (industrially relevant environment in the case of key enabling technologies) |
6 | System/subsystem model or prototype demonstration in a relevant environment (ground or space) | Examples include testing a prototype in a high-fidelity lab environment or a live/virtual experiment or in a simulated operational environment | Technology demonstrated in relevant environment (industrially relevant environment in the case of key enabling technologies) |
7 | System prototype demonstration in a space environment | Prototype near, or at, planned operational system. Algorithms run on processor of the operational environment integrated with actual external entities. SW support structure in place. SW releases are in distinct versions. Frequency and severity of SW deficiency reports do not significantly degrade functionality or performance. Verification, Validation and Accreditation (VV&A) completed | System prototype demonstration in operational environment |
8 | Actual system completed and "flight qualified" through test and demonstration (ground or space) | Technology and SW has been proven and demonstrated to work in its final form and under expected conditions. In almost all cases, TRL represents the end of true system development. Examples include developmental test and evaluation (T&E) of the system in its intended weapon system to determine if it meets design specifications | System complete and qualified |
9 | Actual system "flight proven" through successful mission operations | In almost all cases, this is the end of the last “bugfixing” aspects of system development. Examples include using the system under operational mission conditions. SW releases are production versions and configuration controlled. Frequency and severity of SW deficiencies are at a minimum | Actual system proven in operational environment (competitive manufacturing in the case of key enabling technologies; or in space) |
Roadmap
→redirect Main Article: Public:Business_Tables
Version 3
DateFormat = dd/mm/yyyy Define $width = 960 Define $warning = 300 Define $height = 2000 Define $dy = -5 # shift text to bottom side of bar Define $start = 2024 Define $end = 2029 Define $now = 01/11/2024
ImageSize = width:$width height:$height PlotArea = right:10 left:10 bottom:120 top:10 Period = from:$start till:$end TimeAxis = orientation:horizontal format:yyyy Legend = orientation:vertical position:bottom columns:4
Colors =
id:bg value:white id:lightline value:gray(0.9) id:lighttext value:gray(0.5) id:section value:gray(0.9) id:TRL1 value:yellow2 Legend: TRL-1 id:TRL2 value:orange Legend: TRL-2 id:TRL3 value:oceanblue Legend: TRL-3 id:TRL4 value:powderblue Legend: TRL-4 id:TRL5 value:red Legend: TRL-5 id:TRL6 value:lightpurple Legend: TRL-6 id:TRL7 value:lavender Legend: TRL-7 id:TRL8 value:claret Legend: TRL-8 id:TRL9 value:brightblue Legend: TRL-9 id:PILOT value:green Legend: Pilot id:PROCESS value:skyblue Legend: Process id:EVENT value:drabgreen Legend: Event id:INVENTION value:redorange Legend: Invention id:NAME value:darkblue id:TODAY value:yellowgreen
BackgroundColors = canvas:bg ScaleMinor = gridcolor:lightline unit:month increment:1 start:$start ScaleMajor = gridcolor:lighttext unit:year increment:1 start:2024
BarData=
bar:title
- main milestones
bar:section1 bar:milestone0101
- Design Development & Algorithm Architecture: Ada Lovelace Team
bar:section2 bar:milestone0201 bar:milestone0202 bar:milestone0203 bar:milestone0204 bar:milestone0205
- Mechanical Engineering: Stephanie Kwolek Team
bar:section3 bar:milestone0301 bar:milestone0302 bar:milestone0303 bar:milestone0304 bar:milestone0305 bar:milestone0306
- Optical Engineering: Katharine Blodgett Team
bar:section4 bar:milestone0401 bar:milestone0402 bar:milestone0403
- Electronics Engineering: Ida Hyde Team
bar:section5 bar:milestone0501 bar:milestone0502 bar:milestone0503 bar:milestone0504 bar:milestone0505
- Software Development: Hedy Lamarr Team
bar:section6 bar:milestone0601 bar:milestone0602 bar:milestone0603 bar:milestone0604 bar:milestone0605 bar:milestone0606 bar:milestone0607 bar:milestone0608 bar:milestone0609 bar:milestone0610 bar:milestone0611 bar:milestone0612 bar:milestone0613 bar:milestone0614 bar:milestone0615 bar:milestone0616
- Software Development: Grace Hopper Team
bar:section7 bar:milestone0701 bar:milestone0702 bar:milestone0703 bar:milestone0704 bar:milestone0705 bar:milestone0706 bar:milestone0707 bar:milestone0708 bar:milestone0709 bar:milestone0710 bar:milestone0711 bar:milestone0712 bar:milestone0713 bar:milestone0714 bar:milestone0715 bar:milestone0716 bar:milestone0717 bar:milestone0718 bar:milestone0719 bar:milestone0720 bar:milestone0721 bar:milestone0722 bar:milestone0723 bar:milestone0724 bar:milestone0725 bar:milestone0726
- Software Development: Evelyn Berezin Team
bar:section8 bar:milestone0801 bar:milestone0802 bar:milestone0803 bar:milestone0804 bar:milestone0805 bar:milestone0806 bar:milestone0807 bar:milestone0808 bar:milestone0809 bar:milestone0810 bar:milestone0811
- Software Development: Barbara Askins Team
bar:section9 bar:milestone0901 bar:milestone0902 bar:milestone0903 bar:milestone0904 bar:milestone0905
- Networking: Margaret Hamilton Team
bar:section10 bar:milestone1001 bar:milestone1002 bar:milestone1003
- Customer & Business Development: Barbara Liskov Team
bar:section11 bar:milestone1101 bar:milestone1102 bar:milestone1103 bar:milestone1104
bar:0 bar:99
- explanation: attribute 'barset' instead of 'bar' means consecutive data lines are automatically placed on new bar
- data lines are lines containing at: or from: & till: attributes
- 'barset:break' means 'reset barcounter' = next line will be placed at first bar in barset
- 'barset:skip' means 'increment barcounter' = skip one bar for next data line (to allow extra space
- for text containing line break = ~)
PlotData=
align:left anchor:from fontsize:M width:15 shift:(4,-6) textcolor:black color:section
bar:title from:start till:end text:"Project Development Roadmap" fontsize:XL anchor:middle align:center width:35 color:bg mark:(line,bg)
bar:section1 from:start till:end text:"Milestones" bar:section2 from:start till:end text:"Design Development & Algorithm Architecture: Ada Lovelace Team" bar:section3 from:start till:end text:"Mechanical Engineering: Stephanie Kwolek Team" bar:section4 from:start till:end text:"Optical Engineering: Katharine Blodgett Team" bar:section5 from:start till:end text:"Electronics Engineering: Ida Hyde Team" bar:section6 from:start till:end text:"Software Development: Hedy Lamarr Team" bar:section7 from:start till:end text:"Software Development: Grace Hopper Team" bar:section8 from:start till:end text:"Software Development: Evelyn Berezin Team" bar:section9 from:start till:end text:"Software Development: Barbara Askins Team" bar:section10 from:start till:end text:"Networking: Margaret Hamilton Team" bar:section11 from:start till:end text:"Customer & Business Development: Barbara Liskov Team"
- main milestones
bar:milestone0101 width:10 textcolor:NAME at:01/01/2024 shift:(10,$dy) text:ARHUDFM Project color:TRL5 from:20/08/2024 till:01/01/2025 color:TRL6 from:01/01/2025 till:01/04/2025 color:TRL7 from:01/04/2025 till:01/10/2025 color:TRL8 from:01/10/2025 till:01/07/2026 color:TRL9 from:01/07/2026 till:01/10/2026 color:PILOT from:01/10/2026 till:31/12/2028
- Design Development & Algorithm Architecture: Ada Lovelace Team
- CAD model update, GUI, VUI, Apps algorithms, Demos, Videos, Animations
- Prio #1: [TRL 1-2] Research and description of the principle of operation, description of the technology application, computer-added design
- Prio #2: [TRL 3-4] Technology functionality demo, specific functionality description, GUI demo, lab experimental setup
- Prio #3:
- Prio #4:
bar:milestone0201 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Engineering design color:TRL6 from:01/01/2025 till:01/04/2025 color:TRL7 from:01/04/2025 till:01/10/2025 color:TRL8 from:01/10/2025 till:01/07/2026 color:TRL9 from:01/07/2026 till:01/10/2026
bar:milestone0202 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:GUI color:TRL5 from:20/08/2024 till:01/01/2025 color:TRL6 from:01/01/2025 till:01/04/2025 color:TRL7 from:01/04/2025 till:01/10/2025 color:TRL8 from:01/10/2025 till:01/07/2026 color:TRL9 from:01/07/2026 till:01/10/2026
bar:milestone0203 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:VUI color:TRL5 from:20/10/2024 till:01/01/2025 color:TRL6 from:01/01/2025 till:01/04/2025 color:TRL7 from:01/04/2025 till:01/10/2025 color:TRL8 from:01/10/2025 till:01/07/2026 color:TRL9 from:01/07/2026 till:01/10/2026
bar:milestone0204 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:SW architecture color:TRL4 from:01/01/2025 till:20/01/2025 color:TRL5 from:20/01/2025 till:20/02/2025 color:TRL6 from:20/02/2025 till:20/03/2025 color:TRL7 from:20/03/2025 till:20/05/2025 color:TRL8 from:20/05/2025 till:20/08/2025 color:TRL9 from:01/07/2026 till:30/09/2026
bar:milestone0205 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Content creation color:PROCESS from:01/10/2024 till:31/12/2028
- Mechanical Engineering: Stephanie Kwolek Team
- Prio #1: [TRL 5-6] Prototype: based on 3D print, vacuum casting, vacuum unfusion
- Prio #2: [TRL 7] MVPα: vacuum casting, vacuum unfusion, injection moulding, manual assembly
- Prio #3: [TRL 8] MVPβ: vacuum casting, vacuum unfusion, injection moulding, manual assembly
- Prio #4: [TRL 9] MMPδ: manufacturing process automation, robotic assembly, add-ons (auto tourniquets, Care Under Fire set)
- Prio #5: MMPγ: manufacturing & assembly & logistic process upgrade
bar:milestone0301 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:3D print color:TRL5 from:20/08/2024 till:01/01/2025 color:TRL6 from:01/01/2025 till:01/04/2025 color:TRL7 from:01/04/2025 till:01/10/2025
bar:milestone0302 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Vacuum casting color:TRL7 from:01/04/2025 till:01/10/2025 color:TRL8 from:01/10/2025 till:01/07/2026 color:TRL9 from:01/07/2026 till:01/10/2026
bar:milestone0303 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Injection moulding color:TRL7 from:01/04/2025 till:01/10/2025 color:TRL8 from:01/10/2025 till:01/07/2026 color:TRL9 from:01/07/2026 till:01/10/2026
bar:milestone0304 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Surface finishing color:TRL7 from:01/04/2025 till:01/10/2025 color:TRL8 from:01/10/2025 till:01/07/2026 color:TRL9 from:01/07/2026 till:01/10/2026
bar:milestone0305 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Manual assembly color:TRL7 from:01/04/2025 till:01/10/2025 color:TRL8 from:01/10/2025 till:01/07/2026 color:TRL9 from:01/07/2026 till:01/10/2026
bar:milestone0306 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Test tooling color:TRL7 from:01/04/2025 till:01/10/2025 color:TRL8 from:01/10/2025 till:01/07/2026 color:TRL9 from:01/07/2026 till:01/10/2026
- Optical Engineering: Katharine Blodgett Team
- Light guide, Beam splitting prisms, Dichroic mirror, Optical coatings, Fading pads
- Prio #1: [TRL 5-6] Prototype: optical scheme, light guide, dichroic mirror, fading pads
- Prio #2: [TRL 7] MVPα: beam splitting prisms for 3 cam sensors, optical coatings
- Prio #3: [TRL 8] MVPβ:
- Prio #4: [TRL 9] MMPδ:
- Prio #5: MMPγ:
bar:milestone0401 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Lens system color:TRL5 from:20/08/2024 till:01/01/2025 color:TRL6 from:01/01/2025 till:01/04/2025 color:TRL7 from:01/04/2025 till:01/10/2025 color:TRL8 from:01/10/2025 till:01/07/2026 color:TRL9 from:01/07/2026 till:01/10/2026
bar:milestone0402 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Optical coatings color:TRL5 from:10/11/2024 till:01/01/2025 color:TRL6 from:01/01/2025 till:01/04/2025 color:TRL7 from:01/04/2025 till:01/10/2025 color:TRL8 from:01/10/2025 till:01/07/2026 color:TRL9 from:01/07/2026 till:01/10/2026
bar:milestone0403 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Fading pads color:TRL5 from:10/12/2024 till:01/01/2025 color:TRL6 from:01/01/2025 till:01/04/2025 color:TRL7 from:01/04/2025 till:01/10/2025 color:TRL8 from:01/10/2025 till:01/07/2026 color:TRL9 from:01/07/2026 till:01/10/2026
- Electronics Engineering: Ida Hyde Team
- Schematics and PCBs for motherboard, projector, IFF Transponder, SDR, SDRS, PCSR, Digital sight
- Prio #1: [TRL 5-6] Prototype: based on Raspberry Pi 4B, Texas Instruments DLPDLCR2000EVM
- Prio #2: [TRL 7] MVPα: motherboard chipset Intel Z790, CPU Intel Core i7-13850HX, DLP PCB, SDRS PCB, IFF PCB
- Prio #3: [TRL 8] MVPβ: SDR2 PCB, add-on (software defined antenna, optional battery, continuous wind capture impellers)
- Prio #4: [TRL 9] MMPδ: add-on (auto tourniquets, Care Under Fire set, handheld metal re-radiation radar)
- Prio #5: MMPγ: add-on (digital sight)
bar:milestone0501 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Prototype color:TRL5 from:20/08/2024 till:01/01/2025 color:TRL6 from:01/01/2025 till:01/04/2025
bar:milestone0502 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:MVP color:TRL6 from:01/01/2025 till:01/04/2025 color:TRL7 from:01/04/2025 till:01/10/2025
bar:milestone0503 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:MMP color:TRL8 from:01/10/2025 till:01/07/2026 color:TRL9 from:01/07/2026 till:01/10/2026
bar:milestone0504 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Add-on set 1 color:TRL5 from:09/03/2026 till:22/03/2026 color:TRL6 from:23/03/2026 till:05/04/2026 color:TRL7 from:06/04/2026 till:19/04/2026 color:TRL8 from:20/04/2026 till:03/05/2026 color:TRL9 from:29/06/2026 till:05/07/2026
bar:milestone0505 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Add-on set 2 color:TRL5 from:04/05/2026 till:17/05/2026 color:TRL6 from:18/05/2026 till:31/05/2026 color:TRL7 from:01/06/2026 till:14/06/2026 color:TRL8 from:15/06/2026 till:28/06/2026 color:TRL9 from:06/07/2026 till:12/07/2026
- Software Development: Hedy Lamarr Team
- SDR, SDR Scan, RDF, Radar Detection, IFF, Networks, Remote control
- Prio #1: IFF, NET, RDF, RFDD, RWRC, SDRS
- Prio #2: P2P, RPAC, SDR2
- Prio #3: ANTC, EODD, PCSR
- Prio #4: APAR, FTRC, RBRC, UVRC
- Prio #5:
bar:milestone0601 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:IFF color:TRL5 from:11/02/2025 till:24/02/2025 color:TRL6 from:25/02/2025 till:09/03/2025 color:TRL7 from:02/06/2025 till:15/06/2025 color:TRL8 from:09/03/2026 till:22/03/2026 color:TRL9 from:20/07/2026 till:26/07/2026
bar:milestone0602 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:NET color:TRL5 from:10/03/2025 till:23/03/2025 color:TRL6 from:24/03/2025 till:06/04/2025 color:TRL7 from:16/06/2025 till:29/06/2025 color:TRL8 from:23/03/2026 till:05/04/2026 color:TRL9 from:27/07/2026 till:02/08/2026
bar:milestone0603 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:RDF color:TRL5 from:07/04/2025 till:20/04/2025 color:TRL6 from:21/04/2025 till:04/05/2025 color:TRL7 from:30/06/2025 till:13/07/2025 color:TRL8 from:06/04/2026 till:19/04/2026 color:TRL9 from:03/08/2026 till:09/08/2026
bar:milestone0604 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:RFDD color:TRL5 from:05/05/2025 till:18/05/2025 color:TRL6 from:19/05/2025 till:01/06/2025 color:TRL7 from:14/07/2025 till:27/07/2025 color:TRL8 from:20/04/2026 till:03/05/2026 color:TRL9 from:10/08/2026 till:16/08/2026
bar:milestone0605 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:RWRC color:TRL5 from:28/07/2025 till:10/08/2025 color:TRL6 from:11/08/2025 till:24/08/2025 color:TRL7 from:01/12/2025 till:14/12/2025 color:TRL8 from:04/05/2026 till:17/05/2026 color:TRL9 from:17/08/2026 till:23/08/2026
bar:milestone0606 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:SDRS color:TRL5 from:25/08/2025 till:07/09/2025 color:TRL6 from:08/09/2025 till:21/09/2025 color:TRL7 from:15/12/2025 till:28/12/2025 color:TRL8 from:18/05/2026 till:31/05/2026 color:TRL9 from:24/08/2026 till:30/08/2026
bar:milestone0607 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:P2P color:TRL5 from:22/09/2025 till:05/10/2025 color:TRL6 from:06/10/2025 till:19/10/2025 color:TRL7 from:12/01/2026 till:25/01/2026 color:TRL8 from:01/06/2026 till:14/06/2026 color:TRL9 from:31/08/2026 till:06/09/2026
bar:milestone0608 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:RPAC color:TRL5 from:20/10/2025 till:02/11/2025 color:TRL6 from:03/11/2025 till:16/11/2025 color:TRL7 from:17/11/2025 till:30/11/2025 color:TRL8 from:15/06/2026 till:28/06/2026 color:TRL9 from:07/09/2026 till:13/09/2026
bar:milestone0609 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:SDR2 color:TRL5 from:26/01/2026 till:08/02/2026 color:TRL6 from:09/02/2026 till:22/02/2026 color:TRL7 from:23/02/2026 till:08/03/2026 color:TRL8 from:29/06/2026 till:12/07/2026 color:TRL9 from:14/09/2026 till:20/09/2026
bar:milestone0610 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:ANTC color:TRL5 from:21/09/2026 till:04/10/2026 color:TRL6 from:05/10/2026 till:18/10/2026 color:TRL7 from:19/10/2026 till:01/11/2026 color:TRL8 from:02/11/2026 till:15/11/2026 color:TRL9 from:25/01/2027 till:31/01/2027
bar:milestone0611 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:EODD color:TRL5 from:16/11/2026 till:29/11/2026 color:TRL6 from:30/11/2026 till:13/12/2026 color:TRL7 from:14/12/2026 till:27/12/2026 color:TRL8 from:11/01/2027 till:24/01/2027 color:TRL9 from:01/02/2027 till:07/02/2027
bar:milestone0612 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:PCSR color:TRL5 from:08/02/2027 till:21/02/2027 color:TRL6 from:22/02/2027 till:07/03/2027 color:TRL7 from:08/03/2027 till:21/03/2027 color:TRL8 from:22/03/2027 till:04/04/2027 color:TRL9 from:31/05/2027 till:06/06/2027
bar:milestone0613 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:APAR color:TRL5 from:05/04/2027 till:18/04/2027 color:TRL6 from:19/04/2027 till:02/05/2027 color:TRL7 from:03/05/2027 till:16/05/2027 color:TRL8 from:17/05/2027 till:30/05/2027 color:TRL9 from:07/06/2027 till:13/06/2027
bar:milestone0614 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:FTRC color:TRL5 from:14/06/2027 till:27/06/2027 color:TRL6 from:18/06/2027 till:11/07/2027 color:TRL7 from:12/07/2027 till:25/07/2027 color:TRL8 from:26/07/2027 till:08/08/2027 color:TRL9 from:04/10/2027 till:10/10/2027
bar:milestone0615 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:RBRC color:TRL5 from:09/08/2027 till:22/08/2027 color:TRL6 from:23/08/2027 till:05/09/2027 color:TRL7 from:06/09/2027 till:19/09/2027 color:TRL8 from:20/09/2027 till:03/10/2027 color:TRL9 from:11/10/2027 till:17/10/2027
bar:milestone0616 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:UVRC color:TRL5 from:18/10/2027 till:31/10/2027 color:TRL6 from:01/11/2027 till:14/11/2027 color:TRL7 from:15/11/2027 till:28/11/2027 color:TRL8 from:29/11/2027 till:12/12/2027 color:TRL9 from:13/12/2027 till:19/12/2027
- Software Development: Grace Hopper Team
- System Integration, DevOps, Maps, VBS, Sensors
- Prio #1: CAM, DISP, FPAD, GNSS, HT, INP, MMC, PTTH, SPOT, SRV, STT, SYS, VOVR
- Prio #2: ACC, ADM, FILE, DVC, MAP, NAV, PATH, REC, PLAY, SEC, STM
- Prio #3: TRSL
- Prio #4: VBS
- Prio #5:
bar:milestone0701 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:CAM color:TRL5 from:11/02/2025 till:24/02/2025 color:TRL6 from:25/02/2025 till:09/03/2025 color:TRL7 from:02/06/2025 till:15/06/2025 color:TRL8 from:09/03/2026 till:22/03/2026 color:TRL9 from:20/07/2026 till:26/07/2026
bar:milestone0702 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:DISP color:TRL5 from:11/02/2025 till:24/02/2025 color:TRL6 from:25/02/2025 till:09/03/2025 color:TRL7 from:02/06/2025 till:15/06/2025 color:TRL8 from:09/03/2026 till:22/03/2026 color:TRL9 from:20/07/2026 till:26/07/2026
bar:milestone0703 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:FPAD color:TRL5 from:10/03/2025 till:23/03/2025 color:TRL6 from:24/03/2025 till:06/04/2025 color:TRL7 from:16/06/2025 till:29/06/2025 color:TRL8 from:23/03/2026 till:05/04/2026 color:TRL9 from:27/07/2026 till:02/08/2026
bar:milestone0704 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:GNSS color:TRL5 from:10/03/2025 till:23/03/2025 color:TRL6 from:24/03/2025 till:06/04/2025 color:TRL7 from:16/06/2025 till:29/06/2025 color:TRL8 from:23/03/2026 till:05/04/2026 color:TRL9 from:27/07/2026 till:02/08/2026
bar:milestone0705 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:HT color:TRL5 from:07/04/2025 till:20/04/2025 color:TRL6 from:21/04/2025 till:04/05/2025 color:TRL7 from:30/06/2025 till:13/07/2025 color:TRL8 from:06/04/2026 till:19/04/2026 color:TRL9 from:03/08/2026 till:09/08/2026
bar:milestone0706 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:INP color:TRL5 from:07/04/2025 till:20/04/2025 color:TRL6 from:21/04/2025 till:04/05/2025 color:TRL7 from:30/06/2025 till:13/07/2025 color:TRL8 from:06/04/2026 till:19/04/2026 color:TRL9 from:03/08/2026 till:09/08/2026
bar:milestone0707 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:MMC color:TRL5 from:05/05/2025 till:18/05/2025 color:TRL6 from:19/05/2025 till:01/06/2025 color:TRL7 from:14/07/2025 till:27/07/2025 color:TRL8 from:20/04/2026 till:03/05/2026 color:TRL9 from:10/08/2026 till:16/08/2026
bar:milestone0708 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:PTTH color:TRL5 from:05/05/2025 till:18/05/2025 color:TRL6 from:19/05/2025 till:01/06/2025 color:TRL7 from:14/07/2025 till:27/07/2025 color:TRL8 from:20/04/2026 till:03/05/2026 color:TRL9 from:10/08/2026 till:16/08/2026
bar:milestone0709 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:SPOT color:TRL5 from:28/07/2025 till:10/08/2025 color:TRL6 from:11/08/2025 till:24/08/2025 color:TRL7 from:01/12/2025 till:14/12/2025 color:TRL8 from:04/05/2026 till:17/05/2026 color:TRL9 from:17/08/2026 till:23/08/2026
bar:milestone0710 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:SRV color:TRL5 from:28/07/2025 till:10/08/2025 color:TRL6 from:11/08/2025 till:24/08/2025 color:TRL7 from:01/12/2025 till:14/12/2025 color:TRL8 from:04/05/2026 till:17/05/2026 color:TRL9 from:17/08/2026 till:23/08/2026
bar:milestone0711 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:STT color:TRL5 from:25/08/2025 till:07/09/2025 color:TRL6 from:08/09/2025 till:21/09/2025 color:TRL7 from:15/12/2025 till:28/12/2025 color:TRL8 from:18/05/2026 till:31/05/2026 color:TRL9 from:24/08/2026 till:30/08/2026
bar:milestone0712 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:SYS color:TRL5 from:25/08/2025 till:07/09/2025 color:TRL6 from:08/09/2025 till:21/09/2025 color:TRL7 from:15/12/2025 till:28/12/2025 color:TRL8 from:18/05/2026 till:31/05/2026 color:TRL9 from:24/08/2026 till:30/08/2026
bar:milestone0713 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:VOVR color:TRL5 from:22/09/2025 till:05/10/2025 color:TRL6 from:06/10/2025 till:19/10/2025 color:TRL7 from:12/01/2026 till:25/01/2026 color:TRL8 from:01/06/2026 till:14/06/2026 color:TRL9 from:31/08/2026 till:06/09/2026
bar:milestone0714 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:ACC color:TRL5 from:22/09/2025 till:05/10/2025 color:TRL6 from:06/10/2025 till:19/10/2025 color:TRL7 from:12/01/2026 till:25/01/2026 color:TRL8 from:01/06/2026 till:14/06/2026 color:TRL9 from:31/08/2026 till:06/09/2026
bar:milestone0715 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:ADM color:TRL5 from:20/10/2025 till:02/11/2025 color:TRL6 from:03/11/2025 till:16/11/2025 color:TRL7 from:17/11/2025 till:30/11/2025 color:TRL8 from:15/06/2026 till:28/06/2026 color:TRL9 from:07/09/2026 till:13/09/2026
bar:milestone0716 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:FILE color:TRL5 from:20/10/2025 till:02/11/2025 color:TRL6 from:03/11/2025 till:16/11/2025 color:TRL7 from:17/11/2025 till:30/11/2025 color:TRL8 from:15/06/2026 till:28/06/2026 color:TRL9 from:07/09/2026 till:13/09/2026
bar:milestone0717 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:DVC color:TRL5 from:26/01/2026 till:08/02/2026 color:TRL6 from:09/02/2026 till:22/02/2026 color:TRL7 from:23/02/2026 till:08/03/2026 color:TRL8 from:29/06/2026 till:12/07/2026 color:TRL9 from:14/09/2026 till:20/09/2026
bar:milestone0718 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:MAP color:TRL5 from:26/01/2026 till:08/02/2026 color:TRL6 from:09/02/2026 till:22/02/2026 color:TRL7 from:23/02/2026 till:08/03/2026 color:TRL8 from:29/06/2026 till:12/07/2026 color:TRL9 from:14/09/2026 till:20/09/2026
bar:milestone0719 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:NAV color:TRL5 from:21/09/2026 till:04/10/2026 color:TRL6 from:05/10/2026 till:18/10/2026 color:TRL7 from:19/10/2026 till:01/11/2026 color:TRL8 from:02/11/2026 till:15/11/2026 color:TRL9 from:25/01/2027 till:31/01/2027
bar:milestone0720 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:PATH color:TRL5 from:21/09/2026 till:04/10/2026 color:TRL6 from:05/10/2026 till:18/10/2026 color:TRL7 from:19/10/2026 till:01/11/2026 color:TRL8 from:02/11/2026 till:15/11/2026 color:TRL9 from:25/01/2027 till:31/01/2027
bar:milestone0721 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:REC color:TRL5 from:16/11/2026 till:29/11/2026 color:TRL6 from:30/11/2026 till:13/12/2026 color:TRL7 from:14/12/2026 till:27/12/2026 color:TRL8 from:11/01/2027 till:24/01/2027 color:TRL9 from:01/02/2027 till:07/02/2027
bar:milestone0722 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:PLAY color:TRL5 from:16/11/2026 till:29/11/2026 color:TRL6 from:30/11/2026 till:13/12/2026 color:TRL7 from:14/12/2026 till:27/12/2026 color:TRL8 from:11/01/2027 till:24/01/2027 color:TRL9 from:01/02/2027 till:07/02/2027
bar:milestone0723 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:SEC color:TRL5 from:08/02/2027 till:21/02/2027 color:TRL6 from:22/02/2027 till:07/03/2027 color:TRL7 from:08/03/2027 till:21/03/2027 color:TRL8 from:22/03/2027 till:04/04/2027 color:TRL9 from:31/05/2027 till:06/06/2027
bar:milestone0724 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:STM color:TRL5 from:08/02/2027 till:21/02/2027 color:TRL6 from:22/02/2027 till:07/03/2027 color:TRL7 from:08/03/2027 till:21/03/2027 color:TRL8 from:22/03/2027 till:04/04/2027 color:TRL9 from:31/05/2027 till:06/06/2027
bar:milestone0725 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:TRSL color:TRL5 from:05/04/2027 till:18/04/2027 color:TRL6 from:19/04/2027 till:02/05/2027 color:TRL7 from:03/05/2027 till:16/05/2027 color:TRL8 from:17/05/2027 till:30/05/2027 color:TRL9 from:07/06/2027 till:13/06/2027
bar:milestone0726 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:VBS color:TRL5 from:05/04/2027 till:18/04/2027 color:TRL6 from:19/04/2027 till:02/05/2027 color:TRL7 from:03/05/2027 till:16/05/2027 color:TRL8 from:17/05/2027 till:30/05/2027 color:TRL9 from:07/06/2027 till:13/06/2027
- Software Development: Evelyn Berezin Team
- IMS, Chat, Workgroups, Tasks, Mission planning
- Prio #1: CHAT, IMSG,
- Prio #2: CRPT, MSG, TSK, WGR
- Prio #3: ANLS, CAL, MAIL, PLAN
- Prio #4: WIKI
- Prio #5:
bar:milestone0801 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:CHAT color:TRL5 from:11/02/2025 till:24/02/2025 color:TRL6 from:25/02/2025 till:09/03/2025 color:TRL7 from:02/06/2025 till:15/06/2025 color:TRL8 from:09/03/2026 till:22/03/2026 color:TRL9 from:20/07/2026 till:26/07/2026
bar:milestone0802 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:IMSG color:TRL5 from:10/03/2025 till:23/03/2025 color:TRL6 from:24/03/2025 till:06/04/2025 color:TRL7 from:16/06/2025 till:29/06/2025 color:TRL8 from:23/03/2026 till:05/04/2026 color:TRL9 from:27/07/2026 till:02/08/2026
bar:milestone0803 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:CRPT color:TRL5 from:07/04/2025 till:20/04/2025 color:TRL6 from:21/04/2025 till:04/05/2025 color:TRL7 from:30/06/2025 till:13/07/2025 color:TRL8 from:06/04/2026 till:19/04/2026 color:TRL9 from:03/08/2026 till:09/08/2026
bar:milestone0804 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:MSG color:TRL5 from:05/05/2025 till:18/05/2025 color:TRL6 from:19/05/2025 till:01/06/2025 color:TRL7 from:14/07/2025 till:27/07/2025 color:TRL8 from:20/04/2026 till:03/05/2026 color:TRL9 from:10/08/2026 till:16/08/2026
bar:milestone0805 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:TSK color:TRL5 from:28/07/2025 till:10/08/2025 color:TRL6 from:11/08/2025 till:24/08/2025 color:TRL7 from:01/12/2025 till:14/12/2025 color:TRL8 from:04/05/2026 till:17/05/2026 color:TRL9 from:17/08/2026 till:23/08/2026
bar:milestone0806 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:WGR color:TRL5 from:25/08/2025 till:07/09/2025 color:TRL6 from:08/09/2025 till:21/09/2025 color:TRL7 from:15/12/2025 till:28/12/2025 color:TRL8 from:18/05/2026 till:31/05/2026 color:TRL9 from:24/08/2026 till:30/08/2026
bar:milestone0807 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:ANLS color:TRL5 from:22/09/2025 till:05/10/2025 color:TRL6 from:06/10/2025 till:19/10/2025 color:TRL7 from:12/01/2026 till:25/01/2026 color:TRL8 from:01/06/2026 till:14/06/2026 color:TRL9 from:31/08/2026 till:06/09/2026
bar:milestone0808 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:CAL color:TRL5 from:20/10/2025 till:02/11/2025 color:TRL6 from:03/11/2025 till:16/11/2025 color:TRL7 from:17/11/2025 till:30/11/2025 color:TRL8 from:15/06/2026 till:28/06/2026 color:TRL9 from:07/09/2026 till:13/09/2026
bar:milestone0809 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:MAIL color:TRL5 from:26/01/2026 till:08/02/2026 color:TRL6 from:09/02/2026 till:22/02/2026 color:TRL7 from:23/02/2026 till:08/03/2026 color:TRL8 from:29/06/2026 till:12/07/2026 color:TRL9 from:14/09/2026 till:20/09/2026
bar:milestone0810 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:PLAN color:TRL5 from:21/09/2026 till:04/10/2026 color:TRL6 from:05/10/2026 till:18/10/2026 color:TRL7 from:19/10/2026 till:01/11/2026 color:TRL8 from:02/11/2026 till:15/11/2026 color:TRL9 from:25/01/2027 till:31/01/2027
bar:milestone0811 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:WIKI color:TRL5 from:16/11/2026 till:29/11/2026 color:TRL6 from:30/11/2026 till:13/12/2026 color:TRL7 from:14/12/2026 till:27/12/2026 color:TRL8 from:11/01/2027 till:24/01/2027 color:TRL9 from:01/02/2027 till:07/02/2027
- Software Development: Barbara Askins Team
- Computer Vision, Computer Audition, AI/ML, AI/DL, AI/NLP, AI/ANN
- Prio #1: TESS
- Prio #2: CVC, FA
- Prio #3: CAC
- Prio #4: VM
- Prio #5:
bar:milestone0901 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:TESS color:TRL5 from:11/02/2025 till:24/02/2025 color:TRL6 from:25/02/2025 till:09/03/2025 color:TRL7 from:02/06/2025 till:15/06/2025 color:TRL8 from:09/03/2026 till:22/03/2026 color:TRL9 from:20/07/2026 till:26/07/2026
bar:milestone0902 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:CVC color:TRL5 from:10/03/2025 till:23/03/2025 color:TRL6 from:24/03/2025 till:06/04/2025 color:TRL7 from:16/06/2025 till:29/06/2025 color:TRL8 from:23/03/2026 till:05/04/2026 color:TRL9 from:27/07/2026 till:02/08/2026
bar:milestone0903 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:FA color:TRL5 from:07/04/2025 till:20/04/2025 color:TRL6 from:21/04/2025 till:04/05/2025 color:TRL7 from:30/06/2025 till:13/07/2025 color:TRL8 from:06/04/2026 till:19/04/2026 color:TRL9 from:03/08/2026 till:09/08/2026
bar:milestone0904 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:CAC color:TRL5 from:05/05/2025 till:18/05/2025 color:TRL6 from:19/05/2025 till:01/06/2025 color:TRL7 from:14/07/2025 till:27/07/2025 color:TRL8 from:20/04/2026 till:03/05/2026 color:TRL9 from:10/08/2026 till:16/08/2026
bar:milestone0905 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:VM color:TRL5 from:28/07/2025 till:10/08/2025 color:TRL6 from:11/08/2025 till:24/08/2025 color:TRL7 from:01/12/2025 till:14/12/2025 color:TRL8 from:04/05/2026 till:17/05/2026 color:TRL9 from:17/08/2026 till:23/08/2026
- Networking: Margaret Hamilton Team
- Mentor Relations, Pitches, Updates
- Prio #1: Mentor Relations, Updates
- Prio #2: Business angels (pre-seed round)
- Prio #3: Business angels & Venture capital (seed round)
- Prio #4: Venture capital (round A)
- Prio #5:
bar:milestone1001 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Mentorship color:PROCESS from:20/07/2024 till:01/07/2026
bar:milestone1002 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Updates, PR color:PROCESS from:01/10/2024 till:01/07/2026
bar:milestone1003 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Investors color:PROCESS from:01/10/2024 till:01/01/2025 color:PROCESS from:01/10/2025 till:01/01/2026 color:PROCESS from:01/10/2026 till:01/01/2026 color:PROCESS from:01/10/2028 till:01/01/2028
- Customer & Business Development: Barbara Liskov Team
- Requests, eMails, PR, Meetings
- Prio #1: Innovation programs research, requests, eMails, meetings
- Prio #2: Collaboration research, PR
- Prio #3: Proving ground testing
- Prio #4: Pilot programms
bar:milestone1101 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:DoD programs research color:PROCESS from:01/01/2025 till:31/12/2028
bar:milestone1102 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Collaboration research color:PROCESS from:01/01/2025 till:31/12/2028
bar:milestone1103 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Proving ground testing color:PROCESS from:01/01/2026 till:01/01/2028
bar:milestone1104 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Pilot programms color:PROCESS from:01/07/2026 till:31/12/2028
bar:0 width:1 textcolor:red at:15/11/2024 shift:(-35,-4) text:Pre-Seed textcolor:red at:15/11/2025 shift:(-15,-4) text:Seed textcolor:red at:15/11/2026 shift:(-30,-4) text:round A textcolor:red at:15/11/2028 shift:(-30,-4) text:round B
bar:99 width:1 textcolor:oceanblue at:01/04/2025 shift:(-25,-4) text:MVP Alpha > textcolor:oceanblue at:01/10/2025 shift:(-25,-4) text:MVP Beta > textcolor:oceanblue at:01/07/2026 shift:(-25,-4) text:MMP Gamma > textcolor:oceanblue at:01/10/2026 shift:(15,-4) text:Delta >
LineData=
at:$now color:TODAY width:0.2
at:01/04/2025 color:powderblue width:0.2 layer:back #deadline of end TRL-6 (MVPα) at:01/10/2025 color:powderblue width:0.2 layer:back #deadline of end TRL-7 (MVPβ) at:01/07/2026 color:powderblue width:0.2 layer:back #deadline of end TRL-8 (MMPδ) at:01/10/2026 color:powderblue width:0.2 layer:back #deadline of end TRL-9 (MMPγ)
at:10/11/2024 color:pink width:10 layer:back at:10/11/2025 color:pink width:10 layer:back at:10/11/2026 color:pink width:10 layer:back at:10/11/2028 color:pink width:10 layer:back
}}
Version 2
DateFormat = dd/mm/yyyy Define $width = 960 Define $warning = 300 Define $height = 2000 Define $dy = -5 # shift text to bottom side of bar Define $start = 2024 Define $end = 2028 Define $now = 01/11/2024
ImageSize = width:$width height:$height PlotArea = right:10 left:10 bottom:120 top:10 Period = from:$start till:$end TimeAxis = orientation:horizontal format:yyyy Legend = orientation:vertical position:bottom columns:4
Colors =
id:bg value:white id:lightline value:gray(0.9) id:lighttext value:gray(0.5) id:section value:gray(0.9) id:TRL1 value:yellow2 Legend: TRL-1 id:TRL2 value:orange Legend: TRL-2 id:TRL3 value:oceanblue Legend: TRL-3 id:TRL4 value:powderblue Legend: TRL-4 id:TRL5 value:red Legend: TRL-5 id:TRL6 value:lightpurple Legend: TRL-6 id:TRL7 value:lavender Legend: TRL-7 id:TRL8 value:claret Legend: TRL-8 id:TRL9 value:brightblue Legend: TRL-9 id:PILOT value:green Legend: Pilot id:PROCESS value:skyblue Legend: Process id:EVENT value:drabgreen Legend: Event id:INVENTION value:redorange Legend: Invention id:NAME value:darkblue id:TODAY value:yellowgreen
BackgroundColors = canvas:bg ScaleMinor = gridcolor:lightline unit:month increment:1 start:$start ScaleMajor = gridcolor:lighttext unit:year increment:1 start:2024
BarData=
bar:title
- main milestones
bar:section1 bar:milestone0101
- Design Development & Algorithm Architecture: Ada Lovelace Team
bar:section2 bar:milestone0201 bar:milestone0202 bar:milestone0203 bar:milestone0204 bar:milestone0205
- Mechanical Engineering: Stephanie Kwolek Team
bar:section3 bar:milestone0301 bar:milestone0302 bar:milestone0303 bar:milestone0304 bar:milestone0305 bar:milestone0306
- Optical Engineering: Katharine Blodgett Team
bar:section4 bar:milestone0401 bar:milestone0402 bar:milestone0403
- Electronics Engineering: Ida Hyde Team
bar:section5 bar:milestone0501 bar:milestone0502 bar:milestone0503 bar:milestone0504 bar:milestone0505
- Software Development: Hedy Lamarr Team
bar:section6 bar:milestone0601 bar:milestone0602 bar:milestone0603 bar:milestone0604 bar:milestone0605 bar:milestone0606 bar:milestone0607 bar:milestone0608 bar:milestone0609 bar:milestone0610 bar:milestone0611 bar:milestone0612 bar:milestone0613 bar:milestone0614 bar:milestone0615 bar:milestone0616
- Software Development: Grace Hopper Team
bar:section7 bar:milestone0701 bar:milestone0702 bar:milestone0703 bar:milestone0704 bar:milestone0705 bar:milestone0706 bar:milestone0707 bar:milestone0708 bar:milestone0709 bar:milestone0710 bar:milestone0711 bar:milestone0712 bar:milestone0713 bar:milestone0714 bar:milestone0715 bar:milestone0716 bar:milestone0717 bar:milestone0718 bar:milestone0719 bar:milestone0720 bar:milestone0721 bar:milestone0722 bar:milestone0723 bar:milestone0724 bar:milestone0725 bar:milestone0726
- Software Development: Evelyn Berezin Team
bar:section8 bar:milestone0801 bar:milestone0802 bar:milestone0803 bar:milestone0804 bar:milestone0805 bar:milestone0806 bar:milestone0807 bar:milestone0808 bar:milestone0809 bar:milestone0810 bar:milestone0811
- Software Development: Barbara Askins Team
bar:section9 bar:milestone0901 bar:milestone0902 bar:milestone0903 bar:milestone0904 bar:milestone0905
- Networking: Margaret Hamilton Team
bar:section10 bar:milestone1001 bar:milestone1002 bar:milestone1003
- Customer & Business Development: Barbara Liskov Team
bar:section11 bar:milestone1101 bar:milestone1102 bar:milestone1103 bar:milestone1104
bar:0 bar:99
- explanation: attribute 'barset' instead of 'bar' means consecutive data lines are automatically placed on new bar
- data lines are lines containing at: or from: & till: attributes
- 'barset:break' means 'reset barcounter' = next line will be placed at first bar in barset
- 'barset:skip' means 'increment barcounter' = skip one bar for next data line (to allow extra space
- for text containing line break = ~)
PlotData=
align:left anchor:from fontsize:M width:15 shift:(4,-6) textcolor:black color:section
bar:title from:start till:end text:"Project Development Roadmap" fontsize:XL anchor:middle align:center width:35 color:bg mark:(line,bg)
bar:section1 from:start till:end text:"Milestones" bar:section2 from:start till:end text:"Design Development & Algorithm Architecture: Ada Lovelace Team" bar:section3 from:start till:end text:"Mechanical Engineering: Stephanie Kwolek Team" bar:section4 from:start till:end text:"Optical Engineering: Katharine Blodgett Team" bar:section5 from:start till:end text:"Electronics Engineering: Ida Hyde Team" bar:section6 from:start till:end text:"Software Development: Hedy Lamarr Team" bar:section7 from:start till:end text:"Software Development: Grace Hopper Team" bar:section8 from:start till:end text:"Software Development: Evelyn Berezin Team" bar:section9 from:start till:end text:"Software Development: Barbara Askins Team" bar:section10 from:start till:end text:"Networking: Margaret Hamilton Team" bar:section11 from:start till:end text:"Customer & Business Development: Barbara Liskov Team"
- main milestones
bar:milestone0101 width:10 textcolor:NAME at:01/01/2024 shift:(10,$dy) text:ARHUDFM Project color:TRL5 from:20/08/2024 till:01/01/2025 color:TRL6 from:01/01/2025 till:01/04/2025 color:TRL7 from:01/04/2025 till:01/10/2025 color:TRL8 from:01/10/2025 till:01/07/2026 color:TRL9 from:01/07/2026 till:01/10/2026 color:PILOT from:01/10/2026 till:31/12/2028
- Design Development & Algorithm Architecture: Ada Lovelace Team
- CAD model update, GUI, VUI, Apps algorithms, Demos, Videos, Animations
- Prio #1: [TRL 1-2] Research and description of the principle of operation, description of the technology application, computer-added design
- Prio #2: [TRL 3-4] Technology functionality demo, specific functionality description, GUI demo, lab experimental setup
- Prio #3:
- Prio #4:
bar:milestone0201 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Engineering design color:TRL6 from:01/01/2025 till:01/04/2025 color:TRL7 from:01/04/2025 till:01/10/2025 color:TRL8 from:01/10/2025 till:01/07/2026 color:TRL9 from:01/07/2026 till:01/10/2026
bar:milestone0202 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:GUI color:TRL5 from:20/08/2024 till:01/01/2025 color:TRL6 from:01/01/2025 till:01/04/2025 color:TRL7 from:01/04/2025 till:01/10/2025 color:TRL8 from:01/10/2025 till:01/07/2026 color:TRL9 from:01/07/2026 till:01/10/2026
bar:milestone0203 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:VUI color:TRL5 from:20/10/2024 till:01/01/2025 color:TRL6 from:01/01/2025 till:01/04/2025 color:TRL7 from:01/04/2025 till:01/10/2025 color:TRL8 from:01/10/2025 till:01/07/2026 color:TRL9 from:01/07/2026 till:01/10/2026
bar:milestone0204 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:SW architecture color:TRL4 from:01/01/2025 till:20/01/2025 color:TRL5 from:20/01/2025 till:20/02/2025 color:TRL6 from:20/02/2025 till:20/03/2025 color:TRL7 from:20/03/2025 till:20/05/2025 color:TRL8 from:20/05/2025 till:20/08/2025 color:TRL9 from:01/07/2026 till:30/09/2026
bar:milestone0205 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Content creation color:PROCESS from:01/10/2024 till:31/12/2028
- Mechanical Engineering: Stephanie Kwolek Team
- Prio #1: [TRL 5-6] Prototype: based on 3D print, vacuum casting, vacuum unfusion
- Prio #2: [TRL 7] MVPα: vacuum casting, vacuum unfusion, injection moulding, manual assembly
- Prio #3: [TRL 8] MVPβ: vacuum casting, vacuum unfusion, injection moulding, manual assembly
- Prio #4: [TRL 9] MMPδ: manufacturing process automation, robotic assembly, add-ons (auto tourniquets, Care Under Fire set)
- Prio #5: MMPγ: manufacturing & assembly & logistic process upgrade
bar:milestone0301 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:3D print color:TRL5 from:20/08/2024 till:01/01/2025 color:TRL6 from:01/01/2025 till:01/04/2025 color:TRL7 from:01/04/2025 till:01/10/2025
bar:milestone0302 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Vacuum casting color:TRL7 from:01/04/2025 till:01/10/2025 color:TRL8 from:01/10/2025 till:01/07/2026 color:TRL9 from:01/07/2026 till:01/10/2026
bar:milestone0303 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Injection moulding color:TRL7 from:01/04/2025 till:01/10/2025 color:TRL8 from:01/10/2025 till:01/07/2026 color:TRL9 from:01/07/2026 till:01/10/2026
bar:milestone0304 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Surface finishing color:TRL7 from:01/04/2025 till:01/10/2025 color:TRL8 from:01/10/2025 till:01/07/2026 color:TRL9 from:01/07/2025 till:01/10/2026
bar:milestone0305 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Manual assembly color:TRL7 from:01/04/2025 till:01/10/2025 color:TRL8 from:01/10/2025 till:01/07/2026 color:TRL9 from:01/07/2026 till:01/10/2026
bar:milestone0306 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Test tooling color:TRL7 from:01/04/2025 till:01/10/2025 color:TRL8 from:01/10/2025 till:01/07/2026 color:TRL9 from:01/07/2026 till:01/10/2026
- Optical Engineering: Katharine Blodgett Team
- Light guide, Beam splitting prisms, Dichroic mirror, Optical coatings, Fading pads
- Prio #1: [TRL 5-6] Prototype: optical scheme, light guide, dichroic mirror, fading pads
- Prio #2: [TRL 7] MVPα: beam splitting prisms for 3 cam sensors, optical coatings
- Prio #3: [TRL 8] MVPβ:
- Prio #4: [TRL 9] MMPδ:
- Prio #5: MMPγ:
bar:milestone0401 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Lens system color:TRL5 from:20/08/2024 till:01/01/2025 color:TRL6 from:01/01/2025 till:01/04/2025 color:TRL7 from:01/04/2025 till:01/10/2025 color:TRL8 from:01/10/2025 till:01/07/2026 color:TRL9 from:01/07/2026 till:01/10/2026
bar:milestone0402 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Optical coatings color:TRL5 from:10/11/2024 till:01/01/2025 color:TRL6 from:01/01/2025 till:01/04/2025 color:TRL7 from:01/04/2025 till:01/10/2025 color:TRL8 from:01/10/2025 till:01/07/2026 color:TRL9 from:01/07/2025 till:01/10/2026
bar:milestone0403 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:Fading pads color:TRL5 from:10/12/2023 till:01/01/2024 color:TRL6 from:01/01/2024 till:01/04/2024 color:TRL7 from:01/04/2024 till:01/10/2024 color:TRL8 from:01/10/2024 till:01/07/2025 color:TRL9 from:01/07/2025 till:01/10/2025
- Electronics Engineering: Ida Hyde Team
- Schematics and PCBs for motherboard, projector, IFF Transponder, SDR, SDRS, PCSR, Digital sight
- Prio #1: [TRL 5-6] Prototype: based on Raspberry Pi 4B, Texas Instruments DLPDLCR2000EVM
- Prio #2: [TRL 7] MVPα: motherboard chipset Intel Z790, CPU Intel Core i7-13850HX, DLP PCB, SDRS PCB, IFF PCB
- Prio #3: [TRL 8] MVPβ: SDR2 PCB, add-on (software defined antenna, optional battery, continuous wind capture impellers)
- Prio #4: [TRL 9] MMPδ: add-on (auto tourniquets, Care Under Fire set, handheld metal re-radiation radar)
- Prio #5: MMPγ: add-on (digital sight)
bar:milestone0501 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:Prototype color:TRL5 from:20/08/2023 till:01/01/2024 color:TRL6 from:01/01/2024 till:01/04/2024
bar:milestone0502 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:MVP color:TRL6 from:01/01/2024 till:01/04/2024 color:TRL7 from:01/04/2024 till:01/10/2024
bar:milestone0503 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:MMP color:TRL8 from:01/10/2024 till:01/07/2025 color:TRL9 from:01/07/2025 till:01/10/2025
bar:milestone0504 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:Add-on set 1 color:TRL5 from:09/03/2025 till:22/03/2025 color:TRL6 from:23/03/2025 till:05/04/2025 color:TRL7 from:06/04/2025 till:19/04/2025 color:TRL8 from:20/04/2025 till:03/05/2025 color:TRL9 from:29/06/2025 till:05/07/2025
bar:milestone0505 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:Add-on set 2 color:TRL5 from:04/05/2025 till:17/05/2025 color:TRL6 from:18/05/2025 till:31/05/2025 color:TRL7 from:01/06/2025 till:14/06/2025 color:TRL8 from:15/06/2025 till:28/06/2025 color:TRL9 from:06/07/2025 till:12/07/2025
- Software Development: Hedy Lamarr Team
- SDR, SDR Scan, RDF, Radar Detection, IFF, Networks, Remote control
- Prio #1: IFF, NET, RDF, RFDD, RWRC, SDRS
- Prio #2: P2P, RPAC, SDR2
- Prio #3: ANTC, EODD, PCSR
- Prio #4: APAR, FTRC, RBRC, UVRC
- Prio #5:
bar:milestone0601 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:IFF color:TRL5 from:11/02/2024 till:24/02/2024 color:TRL6 from:25/02/2024 till:09/03/2024 color:TRL7 from:02/06/2024 till:15/06/2024 color:TRL8 from:09/03/2025 till:22/03/2025 color:TRL9 from:20/07/2025 till:26/07/2025
bar:milestone0602 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:NET color:TRL5 from:10/03/2024 till:23/03/2024 color:TRL6 from:24/03/2024 till:06/04/2024 color:TRL7 from:16/06/2024 till:29/06/2024 color:TRL8 from:23/03/2025 till:05/04/2025 color:TRL9 from:27/07/2025 till:02/08/2025
bar:milestone0603 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:RDF color:TRL5 from:07/04/2024 till:20/04/2024 color:TRL6 from:21/04/2024 till:04/05/2024 color:TRL7 from:30/06/2024 till:13/07/2024 color:TRL8 from:06/04/2025 till:19/04/2025 color:TRL9 from:03/08/2025 till:09/08/2025
bar:milestone0604 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:RFDD color:TRL5 from:05/05/2024 till:18/05/2024 color:TRL6 from:19/05/2024 till:01/06/2024 color:TRL7 from:14/07/2024 till:27/07/2024 color:TRL8 from:20/04/2025 till:03/05/2025 color:TRL9 from:10/08/2025 till:16/08/2025
bar:milestone0605 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:RWRC color:TRL5 from:28/07/2024 till:10/08/2024 color:TRL6 from:11/08/2024 till:24/08/2024 color:TRL7 from:01/12/2024 till:14/12/2024 color:TRL8 from:04/05/2025 till:17/05/2025 color:TRL9 from:17/08/2025 till:23/08/2025
bar:milestone0606 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:SDRS color:TRL5 from:25/08/2024 till:07/09/2024 color:TRL6 from:08/09/2024 till:21/09/2024 color:TRL7 from:15/12/2024 till:28/12/2024 color:TRL8 from:18/05/2025 till:31/05/2025 color:TRL9 from:24/08/2025 till:30/08/2025
bar:milestone0607 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:P2P color:TRL5 from:22/09/2024 till:05/10/2024 color:TRL6 from:06/10/2024 till:19/10/2024 color:TRL7 from:12/01/2025 till:25/01/2025 color:TRL8 from:01/06/2025 till:14/06/2025 color:TRL9 from:31/08/2025 till:06/09/2025
bar:milestone0608 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:RPAC color:TRL5 from:20/10/2024 till:02/11/2024 color:TRL6 from:03/11/2024 till:16/11/2024 color:TRL7 from:17/11/2024 till:30/11/2024 color:TRL8 from:15/06/2025 till:28/06/2025 color:TRL9 from:07/09/2025 till:13/09/2025
bar:milestone0609 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:SDR2 color:TRL5 from:26/01/2025 till:08/02/2025 color:TRL6 from:09/02/2025 till:22/02/2025 color:TRL7 from:23/02/2025 till:08/03/2025 color:TRL8 from:29/06/2025 till:12/07/2025 color:TRL9 from:14/09/2025 till:20/09/2025
bar:milestone0610 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:ANTC color:TRL5 from:21/09/2025 till:04/10/2025 color:TRL6 from:05/10/2025 till:18/10/2025 color:TRL7 from:19/10/2025 till:01/11/2025 color:TRL8 from:02/11/2025 till:15/11/2025 color:TRL9 from:25/01/2026 till:31/01/2026
bar:milestone0611 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:EODD color:TRL5 from:16/11/2025 till:29/11/2025 color:TRL6 from:30/11/2025 till:13/12/2025 color:TRL7 from:14/12/2025 till:27/12/2025 color:TRL8 from:11/01/2026 till:24/01/2026 color:TRL9 from:01/02/2026 till:07/02/2026
bar:milestone0612 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:PCSR color:TRL5 from:08/02/2026 till:21/02/2026 color:TRL6 from:22/02/2026 till:07/03/2026 color:TRL7 from:08/03/2026 till:21/03/2026 color:TRL8 from:22/03/2026 till:04/04/2026 color:TRL9 from:31/05/2026 till:06/06/2026
bar:milestone0613 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:APAR color:TRL5 from:05/04/2026 till:18/04/2026 color:TRL6 from:19/04/2026 till:02/05/2026 color:TRL7 from:03/05/2026 till:16/05/2026 color:TRL8 from:17/05/2026 till:30/05/2026 color:TRL9 from:07/06/2026 till:13/06/2026
bar:milestone0614 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:FTRC color:TRL5 from:14/06/2026 till:27/06/2026 color:TRL6 from:18/06/2026 till:11/07/2026 color:TRL7 from:12/07/2026 till:25/07/2026 color:TRL8 from:26/07/2026 till:08/08/2026 color:TRL9 from:04/10/2026 till:10/10/2026
bar:milestone0615 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:RBRC color:TRL5 from:09/08/2026 till:22/08/2026 color:TRL6 from:23/08/2026 till:05/09/2026 color:TRL7 from:06/09/2026 till:19/09/2026 color:TRL8 from:20/09/2026 till:03/10/2026 color:TRL9 from:11/10/2026 till:17/10/2026
bar:milestone0616 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:UVRC color:TRL5 from:18/10/2026 till:31/10/2026 color:TRL6 from:01/11/2026 till:14/11/2026 color:TRL7 from:15/11/2026 till:28/11/2026 color:TRL8 from:29/11/2026 till:12/12/2026 color:TRL9 from:13/12/2026 till:19/12/2026
- Software Development: Grace Hopper Team
- System Integration, DevOps, Maps, VBS, Sensors
- Prio #1: CAM, DISP, FPAD, GNSS, HT, INP, MMC, PTTH, SPOT, SRV, STT, SYS, VOVR
- Prio #2: ACC, ADM, FILE, DVC, MAP, NAV, PATH, REC, PLAY, SEC, STM
- Prio #3: TRSL
- Prio #4: VBS
- Prio #5:
bar:milestone0701 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:CAM color:TRL5 from:11/02/2024 till:24/02/2024 color:TRL6 from:25/02/2024 till:09/03/2024 color:TRL7 from:02/06/2024 till:15/06/2024 color:TRL8 from:09/03/2025 till:22/03/2025 color:TRL9 from:20/07/2025 till:26/07/2025
bar:milestone0702 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:DISP color:TRL5 from:11/02/2024 till:24/02/2024 color:TRL6 from:25/02/2024 till:09/03/2024 color:TRL7 from:02/06/2024 till:15/06/2024 color:TRL8 from:09/03/2025 till:22/03/2025 color:TRL9 from:20/07/2025 till:26/07/2025
bar:milestone0703 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:FPAD color:TRL5 from:10/03/2024 till:23/03/2024 color:TRL6 from:24/03/2024 till:06/04/2024 color:TRL7 from:16/06/2024 till:29/06/2024 color:TRL8 from:23/03/2025 till:05/04/2025 color:TRL9 from:27/07/2025 till:02/08/2025
bar:milestone0704 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:GNSS color:TRL5 from:10/03/2024 till:23/03/2024 color:TRL6 from:24/03/2024 till:06/04/2024 color:TRL7 from:16/06/2024 till:29/06/2024 color:TRL8 from:23/03/2025 till:05/04/2025 color:TRL9 from:27/07/2025 till:02/08/2025
bar:milestone0705 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:HT color:TRL5 from:07/04/2024 till:20/04/2024 color:TRL6 from:21/04/2024 till:04/05/2024 color:TRL7 from:30/06/2024 till:13/07/2024 color:TRL8 from:06/04/2025 till:19/04/2025 color:TRL9 from:03/08/2025 till:09/08/2025
bar:milestone0706 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:INP color:TRL5 from:07/04/2024 till:20/04/2024 color:TRL6 from:21/04/2024 till:04/05/2024 color:TRL7 from:30/06/2024 till:13/07/2024 color:TRL8 from:06/04/2025 till:19/04/2025 color:TRL9 from:03/08/2025 till:09/08/2025
bar:milestone0707 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:MMC color:TRL5 from:05/05/2024 till:18/05/2024 color:TRL6 from:19/05/2024 till:01/06/2024 color:TRL7 from:14/07/2024 till:27/07/2024 color:TRL8 from:20/04/2025 till:03/05/2025 color:TRL9 from:10/08/2025 till:16/08/2025
bar:milestone0708 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:PTTH color:TRL5 from:05/05/2024 till:18/05/2024 color:TRL6 from:19/05/2024 till:01/06/2024 color:TRL7 from:14/07/2024 till:27/07/2024 color:TRL8 from:20/04/2025 till:03/05/2025 color:TRL9 from:10/08/2025 till:16/08/2025
bar:milestone0709 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:SPOT color:TRL5 from:28/07/2024 till:10/08/2024 color:TRL6 from:11/08/2024 till:24/08/2024 color:TRL7 from:01/12/2024 till:14/12/2024 color:TRL8 from:04/05/2025 till:17/05/2025 color:TRL9 from:17/08/2025 till:23/08/2025
bar:milestone0710 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:SRV color:TRL5 from:28/07/2024 till:10/08/2024 color:TRL6 from:11/08/2024 till:24/08/2024 color:TRL7 from:01/12/2024 till:14/12/2024 color:TRL8 from:04/05/2025 till:17/05/2025 color:TRL9 from:17/08/2025 till:23/08/2025
bar:milestone0711 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:STT color:TRL5 from:25/08/2024 till:07/09/2024 color:TRL6 from:08/09/2024 till:21/09/2024 color:TRL7 from:15/12/2024 till:28/12/2024 color:TRL8 from:18/05/2025 till:31/05/2025 color:TRL9 from:24/08/2025 till:30/08/2025
bar:milestone0712 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:SYS color:TRL5 from:25/08/2024 till:07/09/2024 color:TRL6 from:08/09/2024 till:21/09/2024 color:TRL7 from:15/12/2024 till:28/12/2024 color:TRL8 from:18/05/2025 till:31/05/2025 color:TRL9 from:24/08/2025 till:30/08/2025
bar:milestone0713 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:VOVR color:TRL5 from:22/09/2024 till:05/10/2024 color:TRL6 from:06/10/2024 till:19/10/2024 color:TRL7 from:12/01/2025 till:25/01/2025 color:TRL8 from:01/06/2025 till:14/06/2025 color:TRL9 from:31/08/2025 till:06/09/2025
bar:milestone0714 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:ACC color:TRL5 from:22/09/2024 till:05/10/2024 color:TRL6 from:06/10/2024 till:19/10/2024 color:TRL7 from:12/01/2025 till:25/01/2025 color:TRL8 from:01/06/2025 till:14/06/2025 color:TRL9 from:31/08/2025 till:06/09/2025
bar:milestone0715 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:ADM color:TRL5 from:20/10/2024 till:02/11/2024 color:TRL6 from:03/11/2024 till:16/11/2024 color:TRL7 from:17/11/2024 till:30/11/2024 color:TRL8 from:15/06/2025 till:28/06/2025 color:TRL9 from:07/09/2025 till:13/09/2025
bar:milestone0716 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:FILE color:TRL5 from:20/10/2024 till:02/11/2024 color:TRL6 from:03/11/2024 till:16/11/2024 color:TRL7 from:17/11/2024 till:30/11/2024 color:TRL8 from:15/06/2025 till:28/06/2025 color:TRL9 from:07/09/2025 till:13/09/2025
bar:milestone0717 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:DVC color:TRL5 from:26/01/2025 till:08/02/2025 color:TRL6 from:09/02/2025 till:22/02/2025 color:TRL7 from:23/02/2025 till:08/03/2025 color:TRL8 from:29/06/2025 till:12/07/2025 color:TRL9 from:14/09/2025 till:20/09/2025
bar:milestone0718 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:MAP color:TRL5 from:26/01/2025 till:08/02/2025 color:TRL6 from:09/02/2025 till:22/02/2025 color:TRL7 from:23/02/2025 till:08/03/2025 color:TRL8 from:29/06/2025 till:12/07/2025 color:TRL9 from:14/09/2025 till:20/09/2025
bar:milestone0719 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:NAV color:TRL5 from:21/09/2025 till:04/10/2025 color:TRL6 from:05/10/2025 till:18/10/2025 color:TRL7 from:19/10/2025 till:01/11/2025 color:TRL8 from:02/11/2025 till:15/11/2025 color:TRL9 from:25/01/2026 till:31/01/2026
bar:milestone0720 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:PATH color:TRL5 from:21/09/2025 till:04/10/2025 color:TRL6 from:05/10/2025 till:18/10/2025 color:TRL7 from:19/10/2025 till:01/11/2025 color:TRL8 from:02/11/2025 till:15/11/2025 color:TRL9 from:25/01/2026 till:31/01/2026
bar:milestone0721 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:REC color:TRL5 from:16/11/2025 till:29/11/2025 color:TRL6 from:30/11/2025 till:13/12/2025 color:TRL7 from:14/12/2025 till:27/12/2025 color:TRL8 from:11/01/2026 till:24/01/2026 color:TRL9 from:01/02/2026 till:07/02/2026
bar:milestone0722 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:PLAY color:TRL5 from:16/11/2025 till:29/11/2025 color:TRL6 from:30/11/2025 till:13/12/2025 color:TRL7 from:14/12/2025 till:27/12/2025 color:TRL8 from:11/01/2026 till:24/01/2026 color:TRL9 from:01/02/2026 till:07/02/2026
bar:milestone0723 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:SEC color:TRL5 from:08/02/2026 till:21/02/2026 color:TRL6 from:22/02/2026 till:07/03/2026 color:TRL7 from:08/03/2026 till:21/03/2026 color:TRL8 from:22/03/2026 till:04/04/2026 color:TRL9 from:31/05/2026 till:06/06/2026
bar:milestone0724 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:STM color:TRL5 from:08/02/2026 till:21/02/2026 color:TRL6 from:22/02/2026 till:07/03/2026 color:TRL7 from:08/03/2026 till:21/03/2026 color:TRL8 from:22/03/2026 till:04/04/2026 color:TRL9 from:31/05/2026 till:06/06/2026
bar:milestone0725 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:TRSL color:TRL5 from:05/04/2026 till:18/04/2026 color:TRL6 from:19/04/2026 till:02/05/2026 color:TRL7 from:03/05/2026 till:16/05/2026 color:TRL8 from:17/05/2026 till:30/05/2026 color:TRL9 from:07/06/2026 till:13/06/2026
bar:milestone0726 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:VBS color:TRL5 from:05/04/2026 till:18/04/2026 color:TRL6 from:19/04/2026 till:02/05/2026 color:TRL7 from:03/05/2026 till:16/05/2026 color:TRL8 from:17/05/2026 till:30/05/2026 color:TRL9 from:07/06/2026 till:13/06/2026
- Software Development: Evelyn Berezin Team
- IMS, Chat, Workgroups, Tasks, Mission planning
- Prio #1: CHAT, IMSG,
- Prio #2: CRPT, MSG, TSK, WGR
- Prio #3: ANLS, CAL, MAIL, PLAN
- Prio #4: WIKI
- Prio #5:
bar:milestone0801 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:CHAT color:TRL5 from:11/02/2024 till:24/02/2024 color:TRL6 from:25/02/2024 till:09/03/2024 color:TRL7 from:02/06/2024 till:15/06/2024 color:TRL8 from:09/03/2025 till:22/03/2025 color:TRL9 from:20/07/2025 till:26/07/2025
bar:milestone0802 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:IMSG color:TRL5 from:10/03/2024 till:23/03/2024 color:TRL6 from:24/03/2024 till:06/04/2024 color:TRL7 from:16/06/2024 till:29/06/2024 color:TRL8 from:23/03/2025 till:05/04/2025 color:TRL9 from:27/07/2025 till:02/08/2025
bar:milestone0803 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:CRPT color:TRL5 from:07/04/2024 till:20/04/2024 color:TRL6 from:21/04/2024 till:04/05/2024 color:TRL7 from:30/06/2024 till:13/07/2024 color:TRL8 from:06/04/2025 till:19/04/2025 color:TRL9 from:03/08/2025 till:09/08/2025
bar:milestone0804 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:MSG color:TRL5 from:05/05/2024 till:18/05/2024 color:TRL6 from:19/05/2024 till:01/06/2024 color:TRL7 from:14/07/2024 till:27/07/2024 color:TRL8 from:20/04/2025 till:03/05/2025 color:TRL9 from:10/08/2025 till:16/08/2025
bar:milestone0805 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:TSK color:TRL5 from:28/07/2024 till:10/08/2024 color:TRL6 from:11/08/2024 till:24/08/2024 color:TRL7 from:01/12/2024 till:14/12/2024 color:TRL8 from:04/05/2025 till:17/05/2025 color:TRL9 from:17/08/2025 till:23/08/2025
bar:milestone0806 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:WGR color:TRL5 from:25/08/2024 till:07/09/2024 color:TRL6 from:08/09/2024 till:21/09/2024 color:TRL7 from:15/12/2024 till:28/12/2024 color:TRL8 from:18/05/2025 till:31/05/2025 color:TRL9 from:24/08/2025 till:30/08/2025
bar:milestone0807 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:ANLS color:TRL5 from:22/09/2024 till:05/10/2024 color:TRL6 from:06/10/2024 till:19/10/2024 color:TRL7 from:12/01/2025 till:25/01/2025 color:TRL8 from:01/06/2025 till:14/06/2025 color:TRL9 from:31/08/2025 till:06/09/2025
bar:milestone0808 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:CAL color:TRL5 from:20/10/2024 till:02/11/2024 color:TRL6 from:03/11/2024 till:16/11/2024 color:TRL7 from:17/11/2024 till:30/11/2024 color:TRL8 from:15/06/2025 till:28/06/2025 color:TRL9 from:07/09/2025 till:13/09/2025
bar:milestone0809 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:MAIL color:TRL5 from:26/01/2025 till:08/02/2025 color:TRL6 from:09/02/2025 till:22/02/2025 color:TRL7 from:23/02/2025 till:08/03/2025 color:TRL8 from:29/06/2025 till:12/07/2025 color:TRL9 from:14/09/2025 till:20/09/2025
bar:milestone0810 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:PLAN color:TRL5 from:21/09/2025 till:04/10/2025 color:TRL6 from:05/10/2025 till:18/10/2025 color:TRL7 from:19/10/2025 till:01/11/2025 color:TRL8 from:02/11/2025 till:15/11/2025 color:TRL9 from:25/01/2026 till:31/01/2026
bar:milestone0811 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:WIKI color:TRL5 from:16/11/2025 till:29/11/2025 color:TRL6 from:30/11/2025 till:13/12/2025 color:TRL7 from:14/12/2025 till:27/12/2025 color:TRL8 from:11/01/2026 till:24/01/2026 color:TRL9 from:01/02/2026 till:07/02/2026
- Software Development: Barbara Askins Team
- Computer Vision, Computer Audition, AI/ML, AI/DL, AI/NLP, AI/ANN
- Prio #1: TESS
- Prio #2: CVC, FA
- Prio #3: CAC
- Prio #4: VM
- Prio #5:
bar:milestone0901 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:TESS color:TRL5 from:11/02/2024 till:24/02/2024 color:TRL6 from:25/02/2024 till:09/03/2024 color:TRL7 from:02/06/2024 till:15/06/2024 color:TRL8 from:09/03/2025 till:22/03/2025 color:TRL9 from:20/07/2025 till:26/07/2025
bar:milestone0902 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:CVC color:TRL5 from:10/03/2024 till:23/03/2024 color:TRL6 from:24/03/2024 till:06/04/2024 color:TRL7 from:16/06/2024 till:29/06/2024 color:TRL8 from:23/03/2025 till:05/04/2025 color:TRL9 from:27/07/2025 till:02/08/2025
bar:milestone0903 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:FA color:TRL5 from:07/04/2024 till:20/04/2024 color:TRL6 from:21/04/2024 till:04/05/2024 color:TRL7 from:30/06/2024 till:13/07/2024 color:TRL8 from:06/04/2025 till:19/04/2025 color:TRL9 from:03/08/2025 till:09/08/2025
bar:milestone0904 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:CAC color:TRL5 from:05/05/2024 till:18/05/2024 color:TRL6 from:19/05/2024 till:01/06/2024 color:TRL7 from:14/07/2024 till:27/07/2024 color:TRL8 from:20/04/2025 till:03/05/2025 color:TRL9 from:10/08/2025 till:16/08/2025
bar:milestone0905 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:VM color:TRL5 from:28/07/2024 till:10/08/2024 color:TRL6 from:11/08/2024 till:24/08/2024 color:TRL7 from:01/12/2024 till:14/12/2024 color:TRL8 from:04/05/2025 till:17/05/2025 color:TRL9 from:17/08/2025 till:23/08/2025
- Networking: Margaret Hamilton Team
- Mentor Relations, Pitches, Updates
- Prio #1: Mentor Relations, Updates
- Prio #2: Business angels (pre-seed round)
- Prio #3: Business angels & Venture capital (seed round)
- Prio #4: Venture capital (round A)
- Prio #5:
bar:milestone1001 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:Mentorship color:PROCESS from:20/07/2023 till:01/07/2025
bar:milestone1002 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:Updates, PR color:PROCESS from:01/10/2023 till:01/07/2025
bar:milestone1003 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:Investors color:PROCESS from:01/10/2023 till:01/01/2024 color:PROCESS from:01/10/2024 till:01/01/2025 color:PROCESS from:01/10/2025 till:01/01/2025 color:PROCESS from:01/10/2027 till:01/01/2027
- Customer & Business Development: Barbara Liskov Team
- Requests, eMails, PR, Meetings
- Prio #1: Innovation programs research, requests, eMails, meetings
- Prio #2: Collaboration research, PR
- Prio #3: Proving ground testing
- Prio #4: Pilot programms
bar:milestone1101 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:DoD programs research color:PROCESS from:01/01/2024 till:31/12/2027
bar:milestone1102 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:Collaboration research color:PROCESS from:01/01/2024 till:31/12/2027
bar:milestone1103 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:Proving ground testing color:PROCESS from:01/01/2025 till:01/01/2027
bar:milestone1104 width:10 textcolor:NAME at:01/01/2023 shift:(25,$dy) text:Pilot programms color:PROCESS from:01/07/2025 till:31/12/2027
bar:0 width:1 textcolor:red at:15/11/2023 shift:(-35,-4) text:Pre-Seed textcolor:red at:15/11/2024 shift:(-15,-4) text:Seed textcolor:red at:15/11/2025 shift:(-30,-4) text:round A textcolor:red at:15/11/2027 shift:(-30,-4) text:round B
bar:99 width:1 textcolor:oceanblue at:01/04/2024 shift:(-25,-4) text:MVP Alpha > textcolor:oceanblue at:01/10/2024 shift:(-25,-4) text:MVP Beta > textcolor:oceanblue at:01/07/2025 shift:(-25,-4) text:MMP Gamma > textcolor:oceanblue at:01/10/2025 shift:(15,-4) text:Delta >
LineData=
at:$now color:TODAY width:0.2
at:01/04/2024 color:powderblue width:0.2 layer:back #deadline of end TRL-6 (MVPα) at:01/10/2024 color:powderblue width:0.2 layer:back #deadline of end TRL-7 (MVPβ) at:01/07/2025 color:powderblue width:0.2 layer:back #deadline of end TRL-8 (MMPδ) at:01/10/2025 color:powderblue width:0.2 layer:back #deadline of end TRL-9 (MMPγ)
at:10/11/2023 color:pink width:10 layer:back at:10/11/2024 color:pink width:10 layer:back at:10/11/2025 color:pink width:10 layer:back at:10/11/2027 color:pink width:10 layer:back
}}
Design Development & Algorithm Architecture: Ada Lovelace[2] Team
Device design, GUI, VUI, Apps algorithms, Demos, Videos, Animations
- Prio #1: Research and description of the principle of operation, description of the technology application, computer-added design
- Prio #2: Technology functionality demo, specific functionality description, GUI demo, lab experimental setup
Mechanical Engineering: Stephanie Kwolek[3] Team
- Prio #1: [TRL 5-6] Prototype: based on 3D print, vacuum casting, vacuum unfusion
- Prio #2: [TRL 7] MVPα: vacuum casting, vacuum unfusion, injection moulding, manual assembly
- Prio #3: [TRL 8] MVPβ: vacuum casting, vacuum unfusion, injection moulding, manual assembly
- Prio #4: [TRL 9] MMPδ: manufacturing process automation, robotic assembly, add-ons (auto tourniquets, Care Under Fire set, SCBA integration, external aramid cover, continuous wind сapture impellers, software defined antenna, handheld metal re-radiation radar, optional battery, digital sight)
- Prio #5: MMPγ: manufacturing & assembly & logistic process upgrade
Optical Engineering: Katharine Blodgett[4] Team
Light guide, Beam splitting prisms, Dichroic mirror, Optical coatings, Fading pads
- Prio #1: [TRL 5-6] Prototype: optical scheme, light guide, dichroic mirror, fading pads
- Prio #2: [TRL 7] MVPα: beam splitting prisms for 3 cam sensors, optical coatings
- Prio #3: [TRL 8] MVPβ:
- Prio #4: [TRL 9] MMPδ:
- Prio #5: MMPγ:
Electronics Engineering: Ida Hyde[5] Team
Schematics and PCBs for motherboard, projector, IFF Transponder, SDR, SDRS, PCSR, Digital sight
- Prio #1: [TRL 5-6] Prototype: based on Raspberry Pi 5B, Texas Instruments DLPDLCR2000EVM
- Prio #2: [TRL 7] MVPα: motherboard chipset Intel Z790[6] or HM770[7], CPU Intel Core i7-14700K[8][9], DLP PCB, SDRS PCB, IFF PCB
- Prio #3: [TRL 8] MVPβ: SDR2 PCB, add-on (software defined antenna, optional battery, continuous wind capture impellers)
- Prio #4: [TRL 9] MMPδ: add-on (auto tourniquets, Care Under Fire set, handheld metal re-radiation radar)
- Prio #5: MMPγ: add-on (digital sight)
Software Development: Hedy Lamarr[10] Team
SDR, SDR Scan, RDF, Radar Detection, IFF, Networks, Remote control
- Prio #1: IFF, NET, RDF, RFDD, RWRC, SDRS
- Prio #2: P2P, RPAC, SDR2
- Prio #3: ANTC, EODD, PCSR
- Prio #4: APAR, FTRC, RBRC, UVRC
- Prio #5:
Software Development: Grace Hopper[11] Team
System Integration, DevOps, Maps, VBS, Sensors
- Prio #1: CAM, DISP, FPAD, GNSS, HT, INP, MMC, PTTH, SPOT, SRV, STT, SYS, VOVR
- Prio #2: ACC, ADM, FILE, DVC, MAP, NAV, PATH, REC, PLAY, SEC, STM
- Prio #3: TRSL
- Prio #4: VBS
- Prio #5:
Software Development: Evelyn Berezin[12] Team
IMS, Chat, Workgroups, Tasks, Mission planning
- Prio #1: CHAT, IMSG,
- Prio #2: CRPT, MSG, TSK, WGR
- Prio #3: ANLS, CAL, MAIL, PLAN
- Prio #4: WIKI
- Prio #5:
Software Development: Barbara Askins[13] Team
Computer Vision, Computer Audition, AI/ML, AI/DL, AI/NLP, AI/ANN
Networking: Margaret Hamilton[14] Team
Mentor Relations, Pitches, Updates
- Prio #1: Mentor Relations, Updates
- Prio #2: Business angels (pre-seed round)
- Prio #3: Business angels & Venture capital (seed round)
- Prio #4: Venture capital (round A)
- Prio #5:
Customer & Business Development: Barbara Liskov[15] Team
Requests, eMails, PR, Meetings
- Prio #1: Innovation programs research, requests, eMails, meetings
- Prio #2: Collaboration research, PR
- Prio #3: Proving ground testing
- Prio #4: Pilot programms
Future ideas
Further reading
FAQ
- Problems and strategic capabilities
- Target audience
- Market
- Product characteristics and features
- Major product milestones
- Stages of product evolution
- Lifetime value
- Comparison with nearest competitors
- Competitive advantages
- Hardware unit economy
- Estimated budget for the first year after R&D
- Team
- Road Map
- Financial Ask and Use of Funds
- Experience investing in defense startups
See also
Public External Sections: | Public Wiki Sections: | Public Wiki Sections: | Not-Public Wiki Sections: |
---|---|---|---|
Note: Unless otherwise stated, whenever the masculine gender is used, both men and women are included.
See also product details
Hardware Details: | Functional Apps Details: | Executive Apps Details: | Service Apps Details: |
---|---|---|---|
References
- ↑ Dr. John Niemela and Dr. Matthew Fisher, The Use of Technology Readiness Levels for Software Development
- ↑ Wikipedia, Ada Lovelace
- ↑ Wikipedia, Stephanie Kwolek
- ↑ Wikipedia, Katharine Burr Blodgett
- ↑ Wikipedia, Ida Henrietta Hyde
- ↑ Intel Z790 Chipset
- ↑ Intel HM770 Chipset
- ↑ Intel, 14th Gen Core i7
- ↑ Intel Core i7 13th Gen HX (for mobile devices) Series, i7-13850HX Processor
- ↑ Wikipedia, Hedy Lamarr
- ↑ Wikipedia, Grace Hopper
- ↑ Wikipedia, Evelyn Berezin
- ↑ Wikipedia, Barbara Askins
- ↑ Wikipedia, Margaret Hamilton
- ↑ Wikipedia, Barbara Liskov