Jump to content

Public:Traction: Difference between revisions

From Wiki Furtherium
No edit summary
 
(47 intermediate revisions by the same user not shown)
Line 1: Line 1:
{{further|1=[[Public:ARHUDFM Manifesto]],|2=[[Public:Graphical User Interface]],|3=[[Public:Applications]],|4=[[Public:DoD Pains]],|5=[[Public:ARHUDFM Features Summary]],|6=[[Public:Business Tables]],|7=[https://www.furtherium.com/p1 Deck "Tactical Situational Awareness Mobility Platform (Headset)"],|8=[https://www.furtherium.com/p2 Deck "Unmanned Airship Drone Platform" (aerospace & wildfire expert edition)],|9=[https://www.furtherium.com/p3 Deck "24/7 Airborne C-UAS Long-Range AI-driven Defense Platform" (military edition)]|10=}}
{{further|1=[[Public:ARHUDFM Manifesto]],|2=[[Public:Graphical User Interface]],|3=[[Public:Applications]],|4=[[Public:DoD Pains]],|5=[[Public:ARHUDFM Features Summary]],|6=[[Public:Dataroom]],|7=[https://www.furtherium.com/p1 Deck "Tactical Situational Awareness Mobility Platform (Headset)"],|8=[https://www.furtherium.com/p2 Deck "Unmanned Airship Drone Platform" (aerospace & wildfire expert edition)],|9=[https://www.furtherium.com/p3 Deck "24/7 Airborne C-UAS Long-Range AI-driven Defense Platform" (military edition)]|10=}}


==Traction==
==Traction==
===Milestones===
===Milestones===
<html><iframe title="Traction. Project A" aria-label="Range Plot" id="datawrapper-chart-BMP1l" src="https://datawrapper.dwcdn.net/BMP1l/1/" scrolling="no" frameborder="0" style="width: 0; min-width: 100% !important; border: none;" height="900" data-external="1"></iframe><script type="text/javascript">window.addEventListener("message",function(a){if(void 0!==a.data["datawrapper-height"]){var e=document.querySelectorAll("iframe");for(var t in a.data["datawrapper-height"])for(var r,i=0;r=e[i];i++)if(r.contentWindow===a.source){var d=a.data["datawrapper-height"][t]+"px";r.style.height=d}}});</script></html>
<html><iframe title="Traction. Project A" aria-label="Range Plot" id="datawrapper-chart-BMP1l" src="https://datawrapper.dwcdn.net/BMP1l/1/" loading="lazy" scrolling="no" frameborder="0" style="width: 0; min-width: 100% !important; border: none;" height="900" data-external="1"></iframe><script type="text/javascript">window.addEventListener("message",function(a){if(void 0!==a.data["datawrapper-height"]){var e=document.querySelectorAll("iframe");for(var t in a.data["datawrapper-height"])for(var r,i=0;r=e[i];i++)if(r.contentWindow===a.source){var d=a.data["datawrapper-height"][t]+"px";r.style.height=d}}});</script></html>


<html><iframe title="Traction. Project B" aria-label="Range Plot" id="datawrapper-chart-JllRv" src="https://datawrapper.dwcdn.net/JllRv/1/" scrolling="no" frameborder="0" style="width: 0; min-width: 100% !important; border: none;" height="900" data-external="1"></iframe><script type="text/javascript">window.addEventListener("message",function(a){if(void 0!==a.data["datawrapper-height"]){var e=document.querySelectorAll("iframe");for(var t in a.data["datawrapper-height"])for(var r,i=0;r=e[i];i++)if(r.contentWindow===a.source){var d=a.data["datawrapper-height"][t]+"px";r.style.height=d}}});</script></html>
<html><iframe title="Traction. Project B" aria-label="Range Plot" id="datawrapper-chart-JllRv" src="https://datawrapper.dwcdn.net/JllRv/5/" loading="lazy" scrolling="no" frameborder="0" style="width: 0; min-width: 100% !important; border: none;" height="919" data-external="1"></iframe><script type="text/javascript">window.addEventListener("message",function(a){if(void 0!==a.data["datawrapper-height"]){var e=document.querySelectorAll("iframe");for(var t in a.data["datawrapper-height"])for(var r,i=0;r=e[i];i++)if(r.contentWindow===a.source){var d=a.data["datawrapper-height"][t]+"px";r.style.height=d}}});</script></html>


====Annotation====
====Annotation====
Line 73: Line 73:
|<small>Actual application of the technology in its final form & under mission conditions, such as those encountered in operational test & evaluation (OT&E). Examples include using the system under operational mission conditions.</small><small>Operational evaluation report.</small><small>System level test results.</small><small>OT&E report.</small>
|<small>Actual application of the technology in its final form & under mission conditions, such as those encountered in operational test & evaluation (OT&E). Examples include using the system under operational mission conditions.</small><small>Operational evaluation report.</small><small>System level test results.</small><small>OT&E report.</small>
|}
|}
© 2025 U.S. DoD. AFRL TRL Calculator v2.2; James W. Bilbro, NASA, Marshall SFC.
</div></div>
</div></div>


Line 82: Line 83:
! style="width: 20%" |<small>Definition</small>
! style="width: 20%" |<small>Definition</small>
! style="width: 25%" |<small>Description</small>
! style="width: 25%" |<small>Description</small>
! style="width: 20%" |<small>Questions to Consider</small>
! style="width: 25%" |<small>Questions to Consider</small>
! style="width: 35%" |<small>Suggested Evidence / Activities</small>
! style="width: 30%" |<small>Suggested Evidence / Activities</small>
|-
|-
| style="text-align:center;" |<small>1</small>
| style="text-align:center;" |<small>1</small>
Line 105: Line 106:
|<small>Have interface constraints (functional, physical, environmental, regulations, etc.) been defined?</small>
|<small>Have interface constraints (functional, physical, environmental, regulations, etc.) been defined?</small>
|<small>Defined constraints referencing ESOH, regulatory documentation, etc.</small>
|<small>Defined constraints referencing ESOH, regulatory documentation, etc.</small>
|-
| rowspan="3" style="text-align:center;" |<small>3</small>
| rowspan="3" |<small>Interface details modeled.</small>
| rowspan="3" |<small>Interface design details modeled (using 2D/3D CAD, CAE, simulation, FEA, etc.) and documented as part of a quantitative analysis to verify compatibility. Interface diagrams completed.</small> <small>Typical TRL Mapping: Subsystem and interfacing subsystems have matured to at least TRL 3.</small>
|<small>Have interface design details been modeled and documented?</small>
|<small>2D/3D CAD, CAE, simulation, FEA, etc. models and interface diagrams.</small>
|-
|<small>Have interface requirements been updated based on modeling details?</small>
|<small>Updated interface requirements document.</small>
|-
|<small>Has interface compatibility been verified through analysis?</small>
|<small>Modeling results to verify compatibility</small>
|-
| rowspan="6" style="text-align:center;" |<small>4</small>
| rowspan="6" |<small>Interfaces demonstrated to prove functionality in a low-fidelity environment.</small>
| rowspan="6" |<small>Functionality of integration items successfully demonstrated in a low-fidelity lab or synthetic environment.  Form, fit, and function constraints identified. Initial interface/integration performance evaluated.</small> <small>Typical TRL Mapping: Subsystem and interfacing subsystems have matured to at least TRL4.</small>
|<small>Has integration functionality (modules/functions/assemblies) been successfully demonstrated in a low-fidelity lab or synthetic environment?</small>
|<small>Lab report of demonstrated functionality</small>
|-
|<small>Have data transport method(s) and specifications been defined?</small>
|<small>Interface Control Document (ICD)</small>
|-
|<small>Have interface requirements been updated based on the functionality demonstration?</small>
|<small>Updated interface requirements document</small>
|-
|<small>Are overall system requirements for interaction with end users known/baselined?</small>
|<small>System requirements document</small>
|-
|<small>Have interface requirement evaluation/test methods and acceptance criteria been established?</small>
|<small>Listing of performance metrics and evaluation method, compliance matrix template, etc.</small>
|-
|<small>Have assembly instructions been developed?</small>
|<small>Have assembly instructions been developed?</small>
|-
| rowspan="4" style="text-align:center;" |<small>5</small>
| rowspan="4" |<small>Interfaces demonstrated to prove functionality in a high-fidelity environment.</small>
| rowspan="4" |<small>Functionality of integration items successfully demonstrated in a high-fidelity environment. Interface models validated.</small> <small>Typical TRL Mapping: Subsystem and interfacing subsystems have matured to at least TRL 5.</small>
|<small>Has integration functionality (modules/functions/assemblies) been successfully demonstrated in a high fidelity environment?</small>
|<small>Lab report of demonstrated functionality</small>
|-
|<small>Have interface models been validated through testing/analysis in a high fidelity environment?</small>
|<small>Model correlation based on test results</small>
|-
|<small>Have interface requirements/specifications been updated based on the functionality demonstration?</small>
|<small>Updated interface requirements document</small>
|-
|<small>Has an Interface Control Document (ICD) been developed?</small>
|<small>Interface Control Document (ICD)</small>
|-
| rowspan="3" style="text-align:center;" |<small>6</small>
| rowspan="3" |<small>Interfaces demonstrated to prove functionality in a relevant environment.</small>
| rowspan="3" |<small>Functionality and compatibility of integration items successfully demonstrated under the most stressing aspects of the operational environment.</small> <small>Typical TRL Mapping: Subsystem has matured to at least TRL 6.</small>
<small>Typical Milestone Alignment: Successful completion of system-level vendor testing.</small>
|<small>Has integration functionality and compatibility (modules/functions/assemblies) been successfully demonstrated in a relevant environment (to at least threshold requirements)?</small>
|<small>Interface test plan with test acceptance criteria, Integrated system demonstration test results</small>
|-
|<small>Have all interface requirements been verified through testing and/or analysis in a relevant environment?</small>
|<small>Interface requirements compliance matrix</small>
|-
|<small>Have corrective actions for non-compliant test results been developed?</small>
|<small>Non-compliant interface requirements and corrective actions, Failure Mode & Effects Analysis (FMEA)</small>
|-
| rowspan="3" style="text-align:center;" |<small>7</small>
| rowspan="3" |<small>Interfaces demonstrated to prove functionality in an actual or simulated operational environment.</small>
| rowspan="3" |<small>Fully integrated prototype subsystem successfully demonstrated in an actual or simulated operational environment (full spectrum of operational conditions) in a representative system or the actual system.  </small><small>Typical TRL Mapping: Subsystem has matured to at least TRL 7.</small>
<small>Typical Milestone Alignment: Successful completion of developmental test & evaluation (DT&E).</small>
|<small>Has the fully integrated prototype subsystem been successfully demonstrated in a representative system or the actual system in an actual or simulated operational environment?</small>
|<small>Interface test plan with test acceptance criteria, Fully integrated system demonstration/ developmental test results</small>
|-
|<small>Have all interface requirements been verified through testing and/or analysis in an actual or simulated operational environment?</small>
|<small>Interface requirements compliance matrix</small>
|-
|<small>Have corrective actions for non-compliant test results been developed?</small>
|<small>Non-compliant interface requirements and corrective actions</small>
|-
| rowspan="2" style="text-align:center;" |<small>8</small>
| rowspan="2" |<small>Subsystem integration qualified in an actual operational environment.</small>
| rowspan="2" |<small>Early production level system (to include all subsystems and interfaces) successfully demonstrated and qualified in an actual operational environment.</small> <small>Typical TRL Mapping: Subsystem has matured to at least TRL 8.</small>
<small>Typical Milestone Alignment: Successful completion of at least DT&E or operational test & evaluation (OT&E). Low Rate Initial Production (LRIP) systems available.</small>
|<small>Has the early production level system (to include all subsystems and interfaces) been successfully demonstrated and qualified in an actual operational environment?</small>
|<small>Interface test plan with test acceptance criteria, Early production level system demonstration test results</small>
|-
|<small>Have test results, anomalies, deficiencies, and corrective actions been documented?</small>
|<small>Interface requirements compliance matrix, Non-compliant interface requirements and corrective actions</small>
|-
| rowspan="3" style="text-align:center;" |<small>9</small>
| rowspan="3" |<small>Subsystem integration with the actual system completed and ready for Full Rate Production (FRP).</small>
| rowspan="3" |<small>Fully integrated system fielded with all interfaces demonstrating operational effectiveness, suitability, and safety in the operational environment. System proven to be operational in actual or simulated mission conditions (during OT&E event). Written concurrence of system integration performance provided by the user.</small> <small>Typical TRL Mapping: Subsystem has matured to TRL 9.</small>
<small>Typical Milestone Alignment: Initial Operating Capability (IOC) or Post FRP decision.</small>
|<small>Has a fully integrated LRIP system demonstrated operational effectiveness and suitability in the operational environment?</small>
|<small>Operational effectiveness and suitability test results</small>
|-
|<small>Do interface failure rates meet system reliability requirements?</small>
|<small>Reliability testing results</small>
|-
|<small>Has the user provided written concurrence/acceptance of system performance?</small>
|<small>Concurrence memo (informal), Materiel Release (formal), etc.</small>
|}
© 2024 U.S. DoD. DAC/GVSC IRL Working Group; supersedes 2011 DAC/GVSC IRLs.
</div></div>
<div class="mw-collapsible mw-collapsed" overflow:auto;">
<div style="font-weight:bold;line-height:1.6;">Commercial Customer Readiness Level (CCRL)</div>
<div class="mw-collapsible-content">
{| class="wikitable"
! style="text-align:center;" |<small>CCRL</small>
! style="width: 30%" |<small>Definition</small>
! style="width: 35%" |<small>Description</small>
! style="width: 35%" |<small>Example</small>
|-
| style="text-align:center;" |<small>1</small>
|<small>Initial assumptions about general market needs</small>
|<small>The startup is forming initial assumptions about general market needs, beginning to conceptualize where its product or service could fit within a broader market. This stage involves high-level market analysis, often leading to a preliminary business model.</small>
|<small>Imaginary Co. is assessing the demand for eco-friendly packaging materials across various industries, intending to identify market gaps and customer preferences.</small>
|-
| style="text-align: center;" |<small>2</small>
|<small>Identification of specific market requirements</small>
|<small>At this stage, the startup identifies specific requirements of the market, structuring its product development to meet these needs. Tailoring the offering to meet market demands becomes a priority.</small>
|<small>TechWidget Inc. has conducted a survey to understand specific health monitoring needs and features that consumers desire in a wearable device, and is analyzing these insights to inform its product development plans.</small>
|-
|-
| style="text-align:center;" |<small>3</small>
| style="text-align:center;" |<small>3</small>
|<small>Text</small>
|<small>Initial feedback from the market obtained</small>
|<small>Text</small>
|<small>The startup is gathering initial feedback from the market, engaging in early conversations with potential customers to refine its product offering. This feedback loop helps to adjust the product development to better suit market demands.</small>
|<small>Text</small>
|<small>BioExplore LLC is presenting its disease detection prototype at trade shows and medical conferences, collecting feedback from practitioners to enhance its relevance and usability.</small>
|<small>Text</small>
|-
|-
| style="text-align:center;" |<small>4</small>
| style="text-align:center;" |<small>4</small>
|<small>Text</small>
|<small>Validation of the market opportunity by multiple customers</small>
|<small>Text</small>
|<small>The startup secures validation from multiple potential customers, establishing that there is a market opportunity for its product. This validation is often critical for moving towards the development of a marketable product or service.</small>
|<small>Text</small>
|<small>GreenDwell Homes is showcasing its eco-home concepts at sustainable living expos and has received positive feedback from multiple real estate developers interested in green construction.</small>
|<small>Text</small>
|-
|-
| style="text-align:center;" |<small>5</small>
| style="text-align:center;" |<small>5</small>
|<small>Text</small>
|<small>Confirmed interest from a beachhead market and established connections to potential customers</small>
|<small>Text</small>
|<small>Confirmed interest from a beachhead market has been established, with the startup making significant connections with potential customers. This level signifies a more focused and deliberate approach to entering the market.</small>
|<small>Text</small>
|<small>EduTech Solutions has received endorsements from several school districts for its educational software after successful pilot programs demonstrating improved student engagement.</small>
|<small>Text</small>
|-
|-
| style="text-align:center;" |<small>6</small>
| style="text-align:center;" |<small>6</small>
|<small>Text</small>
|<small>Product's value verified through partnerships or initial customer trials</small>
|<small>Text</small>
|<small>The startup's product value has been verified through partnerships or initial customer trials, confirming that the offering has genuine traction in the market. This stage often leads to fine-tuning product-market fit and preparing for a broader roll-out.</small>
|<small>Text</small>
|<small>VirtualEvents Platform has partnered with two major conference organizers for virtual event hosting, validating its platform's capabilities and user experience.</small>
|<small>Text</small>
|-
|-
| style="text-align:center;" |<small>7</small>
| style="text-align:center;" |<small>7</small>
|<small>Text</small>
|<small>Customers engaging in comprehensive product trials or initial purchase tests</small>
|<small>Text</small>
|<small>The startup's product is being adopted by early customers through comprehensive trials or initial purchase tests. These engagements are critical for understanding product performance in real-world scenarios and can lead to iterative product enhancements.</small>
|<small>Text</small>
|<small>Cloud Secure Inc.'s cybersecurity solutions are undergoing extensive trial by a Fortune 500 company, providing crucial insights into enterprise-level security needs and product refinements.</small>
|<small>Text</small>
|-
|-
| style="text-align:center;" |<small>8</small>
| style="text-align:center;" |<small>8</small>
|<small>Text</small>
|<small>First products purchased with escalating business development and sales</small>
|<small>Text</small>
|<small>The startup has achieved initial sales and is escalating its business development efforts, which often includes ramping up production and sales teams. This level demonstrates a proof-of-revenue and a foundation for scalable growth.</small>
|<small>Text</small>
|<small>DataAI is experiencing its first wave of product purchases by healthcare providers and is now expanding its sales force to capitalize on its growing reputation in the big data analytics sector.</small>
|<small>Text</small>
|-
|-
| style="text-align:center;" |<small>9</small>
| style="text-align:center;" |<small>9</small>
|<small>Text</small>
|<small>Extensive and scalable product sales</small>
|<small>Text</small>
|<small>At this level, the startup enjoys extensive and scalable product sales, indicating a successful market penetration and the establishment of a robust customer base. This is often the phase where processes and supply chains are optimized for wide-scale distribution.</small>
|<small>Text</small>
|<small>GreenMobility has widespread adoption of its electric vehicle sharing platform, with scalable sales across major cities, and is implementing enhancements to its app to support global user demand.</small>
|<small>Text</small>
|}
|}
</div></div>
© 2024 Massachusetts Institute of Technology (MIT). All Rights Reserved.
 
Authored by: Keselman and Murray
<div class="mw-collapsible mw-collapsed" overflow:auto;">
<div style="font-weight:bold;line-height:1.6;">Commercial Customer Readiness Level (CCRL)</div>
<div class="mw-collapsible-content">
Table
</div></div>
</div></div>


Line 159: Line 272:
<div style="font-weight:bold;line-height:1.6;">Mission Customer Readiness Level (MCRL)</div>
<div style="font-weight:bold;line-height:1.6;">Mission Customer Readiness Level (MCRL)</div>
<div class="mw-collapsible-content">
<div class="mw-collapsible-content">
Table
{| class="wikitable"
! style="text-align:center;" |<small>MCRL</small>
! style="width: 30%" |<small>Definition</small>
! style="width: 35%" |<small>Description</small>
! style="width: 35%" |<small>Example</small>
|-
| style="text-align:center;" |<small>1</small>
|<small>Initial awareness of mission stakeholders; potential for dual-use identified</small>
|<small>The startup is just beginning to gain awareness among mission stakeholders, understanding the potential dual-use of its product or technology in mission applications alongside commercial use. Initiating outreach to potential mission-focused clients is key at this level.</small>
|<small>Imaginary Co. is seeking to engage with environmental agencies to see if their eco-friendly packaging solutions can be used in mission-critical applications, such as disaster relief efforts where sustainable materials are valued.</small>
|-
| style="text-align: center;" |<small>2</small>
|<small>Preliminary assessments of utility determined; business development resources applied to mission context</small>
|<small>The startup has carried out preliminary assessments of how their product or service could be beneficial in a mission context, getting ready to apply business development resources towards these opportunities.</small>
|<small>TechWidget Inc. is exploring how its wearable health devices could be adapted for military use, conducting initial assessments to understand the specific needs of soldiers in field operations.</small>
|-
| style="text-align:center;" |<small>3</small>
|<small>Formal meetings and engagements with end users and sponsors; focusing in on capability use cases</small>
|<small>Formal meetings and engagements with potential end-users and sponsors help the startup refine its understanding of mission-specific use cases, evolving their product design and features to address unique mission requirements.</small>
|<small>BioExplore LLC is engaging in formal meetings with government health agencies to refine its disease detection technology based on specific use cases and operational requirements of national health missions.</small>
|-
| style="text-align:center;" |<small>4</small>
|<small>Alignment of capability with specific mission needs; identification of potential modifications needed</small>
|<small>The startup's product or technology has been recognized for alignment with specific mission needs but may require modifications. Attention is now focusing on how to adapt their solution for the mission environment.</small>
|<small>GreenDwell Homes is working with non-governmental organizations in disaster zones to determine how their sustainable housing can meet the unique demands of rapid- deployment shelters.</small>
|-
| style="text-align:center;" |<small>5</small>
|<small>Collaboration on refining the capability; mission input on design, features, and operational integration</small>
|<small>Collaboration with mission users has intensified to refine the capability of the product, incorporating mission input into design, features, and operation. This usually entails collaborative development with input from the mission side to ensure suitability.</small>
|<small>EduTech Solutions is collaborating with international educational missions to ensure their software meets the diverse needs of global classrooms, especially in regions with limited resources.</small>
|-
| style="text-align:center;" |<small>6</small>
|<small>Commitment from mission stakeholders; letters of intent or preliminary agreements indicating serious interest</small>
|<small>Commitment from mission stakeholders has been obtained, with letters of intent or preliminary agreements indicating serious interest. The startup's product is progressing towards an integrated solution for the mission organization.</small>
|<small>VirtualEvents Platform has received letters of intent from several emergency response organizations interested in utilizing its platform for training and simulation purposes.</small>
|-
| style="text-align:center;" |<small>7</small>
|<small>Evaluations and validation of the capability fit within mission</small>
|<small>Evaluations and validations of the startup's product within various missions have been successful, showing the capability fits well within the mission aims. This level of readiness escalates the potential for formal adoption as the product or service is considered for integration into mission systems or operations.</small>
|<small>CloudSecure Inc. is in the final stages of product validation with a national security agency, proving that their cybersecurity tools meet the rigorous standards required for mission-critical systems.</small>
|-
| style="text-align:center;" |<small>8</small>
|<small>Formal adoption of the capability; integration into mission systems, training, or doctrine</small>
|<small>The startup's technology or service has formally been adopted; it's now being integrated into mission systems, training, or doctrine. This stage represents a significant milestone as the product becomes an official part of the mission's operational toolkit.</small>
|<small>DataAI's analytics platform has been integrated into a defense intelligence system, contributing to data-driven mission planning and operation after formal adoption by the defense department.</small>
|-
| style="text-align:center;" |<small>9</small>
|<small>Standard issue or widespread deployment across multiple units or platforms</small>
|<small>The product has become standard issue or is seeing widespread deployment across multiple units or platforms, becoming a common tool within the mission's operational environment. It signifies full-scale acceptance and integration of the product in the mission context.</small>
|<small>GreenMobility has achieved a major success with its electric vehicles being adopted as the standard transportation option at numerous military installations, enhancing operational efficiency and supporting the mission's sustainability objectives.</small>
|}
© 2024 Massachusetts Institute of Technology (MIT). All Rights Reserved.
Authored by: Keselman and Murray
</div></div>
</div></div>


Line 165: Line 330:
<div style="font-weight:bold;line-height:1.6;">Manufacturing Readness Level (MRL)</div>
<div style="font-weight:bold;line-height:1.6;">Manufacturing Readness Level (MRL)</div>
<div class="mw-collapsible-content">
<div class="mw-collapsible-content">
Table
{| class="wikitable"
! style="text-align:center;" |<small>MRL</small>
! style="width: 20%" |<small>A - Technology and Industrial Base</small>
! style="width: 20%" |<small>B - Design</small>
! style="width: 20%" |<small>C - Cost & Funding</small>
! style="width: 20%" |<small>D - Materials (Raw Materials, Components, Subassemblies and Subsystems)</small>
! style="width: 20%" |<small>E - Process Capability & Control</small>
|-
| rowspan="2" style="text-align:center;" |<small>1</small>
|<small>Global trends in emerging industrial base capabilities identified.</small>
|<small>Hypotheses developed for cause-effect relationships between technology variables and producibility.</small>
|<small>Hypotheses developed regarding technology impact on affordability.</small>
|<small>New material properties and characteristics surveyed and identified for research (e.g., manufacturability, quality).</small>
|<small>Modeling and simulation approaches/tools identified to support manufacturing and quality activities.</small>
|-
|<small>Global trends in manufacturing science and technology identified (i.e., concepts, capabilities).</small>
|<small>Current capability deficiencies and gaps identified.</small>
|<small>Initial manufacturing and quality costs identified.</small>
|<small>Global trends for material availability, obsolescence, and DMSMS surveyed and identified for research.</small>
|<small>Hypotheses developed regarding cause-effect relationships between process variables and process stability and repeatability.</small>
|-
| rowspan="2" style="text-align: center;" |<small>2</small>
|<small>Potential industrial base capability gaps identified.</small>
|<small>Studies performed to test hypotheses regarding cause-effect relationships between technology variables and producibility. Elements identified which have a potential impact to producibility (i.e., materials, processes, capabilities, limitations).</small>
|<small>Cost model approach defined.</small>
|<small>Potential effects of new material properties on design application manufacturability and quality predicted based on research.</small>
|<small>Modeling and simulation in development initiated.</small>
|-
|<small>Potential manufacturing science and technology gaps identified.</small>
|<small>Analyses performed to evaluate the feasibility of potential solutions to address capability gaps.</small>
|<small>Potential manufacturing and quality cost drivers and system affordability gaps identified.</small>
|<small>Material availability, obsolescence, and DMSMS gaps identified.</small>
|<small>Studies performed to test hypotheses regarding cause-effect relationships. Initial process approaches identified.</small>
|-
| rowspan="2" style="text-align:center;" |<small>3</small>
|<small>Industrial base capabilities for potential sources identified for system concepts.</small>
|<small>System concept elements evaluated for manufacturability and producibility using experiments, modeling, and simulation.</small>
|<small>Manufacturing cost estimates for system concepts developed. Initial cost models developed which include high-level process steps and materials.</small>
|<small>Effects of new material properties on design concept manufacturability and quality validated using experiments and models.</small>
|<small>Manufacturing and quality gaps for system concepts identified using modeling and simulation.</small>
|-
|<small>Manufacturing technology requirements identified to address potential capability gaps for system concepts.</small>
|<small>High level performance, lifecycle, and technical requirements defined and evaluated for system concepts. Trade-offs in design options based on experiments and initial MOEs.</small>
|<small>Analyses conducted to refine manufacturing and quality cost drivers, risks, and development strategy (e.g., lab to pilot to factory). Potential cost reduction and system affordability gap closure strategies identified.</small>
|<small>Material availability, obsolescence, and DMSMS gap closure strategy defined.</small>
|<small>Cause-effect relationships between process control variables and process stability and repeatability validated through laboratory experiments. Critical process control variables identified.</small>
|-
| rowspan="2" style="text-align:center;" |<small>4</small>
|<small>Industrial base including capacities and capabilities surveyed for preferred materiel solution, key technologies, components, and/or key processes. Industrial base considerations included in AoA with capability risks and issues documented in the AS.</small>
|<small>Initial producibility and manufacturability assessments in selection of preferred materiel solution completed. Results considered in AoA documented in AS key components/technologies.</small>
|<small>Cost estimates refined based on anticipated production volumes associated with preferred materiel solution. Cost model updated with identified cost drivers (i.e., process variables, manufacturing, materials, and special requirements). Cost driver uncertainty quantified. Cost model supports AoA and ASR.</small>
|<small>New materials and components for preferred materiel solution demonstrated in a laboratory environment.</small>
|<small>Production modeling and simulation tools utilized to define manufacturing and quality requirements for preferred materiel solution. Modeling and simulation results considered in the AoA.</small>
|-
|<small>Manufacturing technology development initiatives defined for preferred materiel solution. Manufacturing technology development requirements considered in the AoA.</small>
|<small>Form, fit, and function constraints, and manufacturing capabilities identified for preferred systems concept. SEP and T&E Strategy recognize the need for the establishment/validation of manufacturing capability and management of manufacturing risk for the product lifecycle. Initial KPPs identified for preferred systems concept. System characteristics and measures to support required capabilities identified.</small>
|<small>Producibility and lifecycle cost risks and issues assessed for preferred materiel solution. Initial cost analysis supports AoA and ASR.</small>
|<small>Projected lead times identified for all difficult to obtain, difficult to process, or hazardous materials. Quantities and lead times estimated. Material availability risks and issues including DMSMS for preferred materiel solution considered in AoA. Mitigation plans incorporated in SEP for the preferred system concept.</small>
|<small>Maturity of critical processes for preferred materiel solution assessed.</small><small>Process capability requirements and improvement plans developed and documented in the SEP.</small>
|-
| rowspan="2" style="text-align:center;" |<small>5</small>
|<small>Industrial base analysis initiated to identify potential manufacturing sources. Sole/single/FOCI sources identified and planning initiated to minimize risks.</small>
|<small>Producibility and manufacturability assessments of key technologies and components initiated. Ongoing design trades consider manufacturing processes and industrial base capability constraints. Manufacturing processes assessed for capability to be tested and verified in production. Manufacturing processes assessed for influence on O&S.</small>
|<small>Prototype components produced in a production relevant environment, or simulations drive end-to-end cost models. Cost model includes materials, labor, equipment, tooling/STE/SIE, setup, yield/scrap/rework, WIP, and capability/capacity constraints.</small>
|<small>Materials manufactured or produced in a prototype environment (may be in a similar application/program). Maturation efforts in place to address new material production risks for technology demonstration.</small>
|<small>Initial modeling & simulations (product or process) developed at the component level and used to determine constraints.</small>
|-
|<small>Required manufacturing technology development efforts initiated.</small>
|<small>Lower level performance requirements sufficient to proceed to preliminary design. All enabling/critical technologies and components identified and the product lifecycle considered. Evaluation of the design for KCs initiated. Product data required for prototype component manufacturing released.</small>
|<small>Costs analyzed using prototype component actuals to ensure target costs are achievable. Decisions regarding design choices, make/buy, capacity, process capability, sources, quality, KCs, yield/rate, and variability influenced by cost models.</small>
|<small>Availability risks and issues addressed for prototype build. Significant material risks including DMSMS identified for all materials. Planning initiated to address scale-up issues.</small>
|<small>Process Maturity assessed on similar processes in production. Process capability requirements identified for pilot line, LRIP and FRP.</small>
|-
| rowspan="2" style="text-align:center;" |<small>6</small>
|<small>Industrial base (IB) analysis including capacity and capability for MS B completed. Industrial capability in place to support manufacturing of development articles. Plans to avoid or justification of sole/single/FOCI IB sources complete.</small>
|<small>Producibility assessments and producibility trade studies (performance vs. producibility) of key technologies/components completed. Results used to shape AS, SEP, manufacturing and producibility plans, and planning for EMD or technology insertion programs. Preliminary design choices assessed against manufacturing processes and industrial base capability constraints. Producibility enhancement efforts (i.e., DFM, DFA, etc.) initiated.</small>
|<small>Cost model updated with design requirements, material specifications, tolerances, IMS, results of system/subsystem simulations and production relevant prototype demonstrations.</small>
|<small>Material maturity verified through technology demonstration articles. Preliminary material specifications in place. Material properties adequately characterized.</small>
|<small>Initial modeling & simulations developed at the sub-system or system level, and used to determine system constraints.</small>
|-
|<small>Manufacturing technology efforts continuing. Required manufacturing technology development solutions demonstrated in a production relevant environment.</small>
|<small>System allocated baseline established. Product requirements and features are well enough defined to support PDR. Product data essential for subsystem/ system prototyping has been released, and all enabling/critical components have been prototyped. Preliminary KCs for the design identified and mitigation plans initiated.</small>
|<small>Costs analyzed using prototype system/sub-system actuals to ensure target costs are achievable. Cost targets allocated to subsystems. Cost reduction and avoidance strategies developed. Manufacturing cost drivers for "Should-Cost" model provided.</small>
|<small>Availability risks and issues addressed to meet EMD build. Long-lead items identified. Components assessed for future DMSMS risk.</small>
|<small>Manufacturing processes demonstrated in production relevant environment. Collection or estimation of process capability data from prototype build and refinement of process capability requirements initiated.</small>
|-
| rowspan="2" style="text-align:center;" |<small>7</small>
|<small>Industrial base capacity and capability to support production analyzed. Justified Sole/single/FOCI industrial base sources assessed and monitored.</small>
|<small>Detailed producibility trade studies using knowledge of key design characteristics and related manufacturing process capability completed. Producibility enhancement efforts (i.e., DFM, DFA, etc.) ongoing. Manufacturing processes re-assessed as needed for capability to be tested and verified. Manufacturing processes re-assessed as needed for potential influence on O&S.</small>
|<small>Cost model updated with the results of systems/sub-systems produced in a production representative environment, production plant layout and design, and obsolescence solutions.</small>
|<small>Material maturity sufficient for pilot line build. Material specifications approved.</small>
|<small>Modeling & simulations used to determine system constraints and to identify improvement opportunities.</small>
|-
|<small>Manufacturing technology efforts continuing. Required manufacturing technology development solutions demonstrated in a production representative environment.</small>
|<small>Product design and features are well enough defined to support CDR, even though design change traffic may be significant. All product data essential for component manufacturing released. Potential KC risks and issues identified with mitigation plans in place.</small>
|<small>Manufacturing costs rolled up to system/sub-system level and tracked against targets. Detailed trade studies and engineering change requests supported by cost estimates. Cost reduction and avoidance strategies underway. Manufacturing cost drivers for "Should-Cost" model updated.</small>
|<small>Availability risks and issues addressed to meet LRIP builds. Long lead procurements identified and mitigated. DMSMS mitigation strategies for components in place.</small>
|<small>Manufacturing processes demonstrated in a production representative environment. Collection and/or estimation of process capability data and refinement of process capability requirements ongoing and used to shape process improvement plans.</small>
|-
| rowspan="2" style="text-align:center;" |<small>8</small>
|<small>Industrial base capacity and capability analysis for MS C completed. Industrial capability is in place to support LRIP.</small>
|<small>Producibility improvements implemented on system. Known producibility risks and issues managed for LRIP.</small>
|<small>Cost model updated with results of pilot line build.</small>
|<small>Materials proven and validated during EMD as adequate to support LRIP. Material specifications stable.</small>
|<small>Modeling & simulations verified by pilot line build. Results used to improve process and demonstrate that LRIP requirements can be met.</small>
|-
|<small>Primary manufacturing technology efforts concluding. Improvement efforts continuing. Required manufacturing technology solutions validated on a pilot line.</small>
|<small>Detailed design of product features and interfaces completed. All product data essential for system manufacturing released. Design change traffic does not significantly impact LRIP.</small>
|<small>Costs analyzed using pilot line actuals to ensure target costs are achievable. Manufacturing cost analysis supports proposed changes to requirements or configuration. Cost reduction initiatives ongoing. Manufacturing cost drivers for "Should-Cost" model updated.</small>
|<small>Availability risks and issues managed for LRIP. Long lead procurement initiated for LRIP. Availability issues addressed to meet FRP builds. DMSMS mitigation ongoing.</small>
|<small>Manufacturing processes for LRIP verified on a pilot line. Process Capability data from pilot line meets target. Process capability requirements for LRIP and FRP refined based upon pilot line data.</small>
|-
| rowspan="2" style="text-align:center;" |<small>9</small>
|<small>Industrial base capacity and capability analysis for FRP has been completed and capability is in place to support start of FRP.</small>
|<small>Prior producibility improvements analyzed for effectiveness during LRIP. Producibility risks and issues discovered in LRIP managed for FRP.</small>
|<small>FRP cost model updated with result of LRIP build.</small>
|<small>Materials controlled to specifications in LRIP. Materials proven and validated as adequate to support FRP.</small>
|<small>Modeling & simulations verified by LRIP build, assist in management of LRIP, and demonstrate that FRP requirements can be met.</small>
|-
|<small>Manufacturing technology process improvements efforts initiated for FRP.</small>
|<small>Major product design features and configuration are stable. System design has been validated through operational testing of LRIP items. PCA or equivalent complete as necessary. Design change traffic is limited.</small>
|<small>LRIP cost goals met and learning curves analyzed with actual data. Cost reduction initiatives ongoing. Touch labor efficiency analyzed to meet production rates and elements of inefficiency are identified with plans in place for reduction.</small>
|<small>Long lead procurement initiated for FRP. Availability risks and issues managed for FRP. DMSMS mitigation ongoing.</small>
|<small>Manufacturing processes are stable, adequately controlled, capable, and have achieved program LRIP objectives. Variability experiments conducted to show FRP impact and potential for continuous improvement.</small>
|-
| rowspan="2" |10
|<small>Industrial base analysis capacity and capability supports FRP and includes support for modifications, upgrades, surge and other potential manufacturing requirements.</small>
|<small>Design producibility improvements demonstrated in FRP. Process producibility improvements ongoing. All modifications, upgrades, DMSMS and other changes assessed for producibility.</small>
|<small>Cost model validated against actual FRP cost.</small>
|<small>Materials controlled to specifications in FRP.</small>
|<small>Modeling & simulations verified by FRP build. Production simulation models used as tools to assist in management of FRP.</small>
|-
|<small>Manufacturing technology continuous process improvements ongoing.</small>
|<small>Product design is stable. Design changes are few and generally limited to those required for continuous improvement or in reaction to obsolescence.</small>
|<small>FRP cost goals met. Cost reduction initiatives ongoing.</small>
|<small>All material availability risks and issues managed. DMSMS mitigation ongoing.</small>
|<small>Manufacturing processes are stable, adequately controlled, capable, and have achieved program FRP objectives.</small>
|}
<small>MRL1, MRL2, MRL3 - Pre-Materiel Development Decision (Pre-MDD).</small>
 
<small>MRL4 - Materiel Solution Analysis (MSA). Alternative System Review (ASR).</small>
 
<small>MRL5, MRL6 - Technology Maturation and Risk Reduction (TMRR). System Requirements Review / System Functional Review (SRR/SFR). Production Readiness Review (PDR).</small>
 
<small>MRL7, MRL8 - Engineering & Manufacturing Development (EMD). Critical Design Review (CDR). Production Readiness Review / System Verification Review (PRR/SVR).</small>
 
<small>MRL9 - Low-Rate Initial Production (LRIP). Production Configuration Audit (PCA).</small>
 
<small>MRL10 - Full-Rate Production (FRP).</small>
 
 
© 2025 U.S. DoD. DoD Manufacturing Readiness Levels (MRLs). MRL Criteria Matrix v2025 R1. Effective as of 8 July 2025.
</div></div>
</div></div>


Line 171: Line 487:
<div style="font-weight:bold;line-height:1.6;">Commercial Funding Readiness Level (CFRL)</div>
<div style="font-weight:bold;line-height:1.6;">Commercial Funding Readiness Level (CFRL)</div>
<div class="mw-collapsible-content">
<div class="mw-collapsible-content">
Table
{| class="wikitable"
! style="text-align:center;" |<small>CFRL</small>
! style="width: 30%" |<small>Definition</small>
! style="width: 35%" |<small>Description</small>
! style="width: 35%" |<small>Example</small>
|-
| style="text-align:center;" |<small>1</small>
|<small>Exploring potential funding avenues, including bootstrapping and pre-seed funding.</small>
|<small>The startup is identifying potential avenues for funding, exploring whether to bootstrap or pursue pre-seed investment to take the initial steps in its business journey.</small> <small>At this level, the focus is on market research and developing the business concept.</small>
|<small>Imaginary Co. is developing a concept for an eco-</small><small>friendly packaging solution and is researching local angel investors and making a list of “family and friends” for initial funding while refining its business plan.</small>
|-
| style="text-align: center;" |<small>2</small>
|<small>Actively seeking pre-seed or angel investors for initial milestones</small>
|<small>The startup is actively seeking early financial backers such as pre-seed or angel investors to support achieving key early milestones such as minimal viable prototype (MVP) development.</small> <small>This level shows a move from concept to initial action and actual fundraising.</small>
|<small>TechWidget Inc. has a prototype for a wearable health monitor and is pitching to angel investor networks to fund its market validation study.</small>
|-
| style="text-align:center;" |<small>3</small>
|<small>Pre-seed or angel funding secured to continue market exploration</small>
|<small>With pre-seed or angel funding secured, the startup is actively engaged in market exploration and beginning product development.</small> <small>This early injection of funds is used to validate assumptions and prepare for further financial rounds.</small>
|<small>BioExplore LLC has secured angel funding to develop its first laboratory-based prototype for rapid disease detection and is conducting initial market assessments.</small>
|-
| style="text-align:center;" |<small>4</small>
|<small>Seed funding being pursued for initial product development and market validation</small>
|<small>The startup is in the process of pursuing seed funding, which is essential for product development and initial market validation efforts.</small> <small>At this point, the company aims to demonstrate the viability of its product to attract further investment.</small>
|<small>GreenDwell Homes is seeking seed investment to build sustainable tiny home models and validate the market through a pilot project in three cities.</small>
|-
| style="text-align:center;" |<small>5</small>
|<small>Seed funding round completed; positioning for future funding with defined milestones and growth objectives</small>
|<small>Having completed a seed funding round, the startup is working on achieving predefined milestones and growth objectives to pave the way for larger investments.</small> <small>There is an operational product and initial market traction at this level.</small>
|<small>EduTech Solutions has completed its seed funding round and is focused on increasing its user base and proving its educational software’s efficacy to attract Series A funding.</small>
|-
| style="text-align:center;" |<small>6</small>
|<small>Series A funding being actively targeted to scale operations and market presence</small>
|<small>The startup targets Series A funding to scale its operations and expand its market presence.</small> <small>Successful reaching of Series A would reflect market validation and investor confidence in the business model.</small>
|<small>VirtualEvents Platform is targeting Series A funding to expand its online event hosting capabilities and grow its customer base internationally.</small>
|-
| style="text-align:center;" |<small>7</small>
|<small>Series A funding secured; planning for Series B to further scale and possibly enter new markets</small>
|<small>The startup plans for Series B funding after securing Series A, which means it's preparing to scale up further, improve existing products, and possibly explore new markets.</small> <small>This reflects a level of success and stability where the business has proven its model and is ready for aggressive growth.</small>
|<small>CloudSecure Inc. has leveraged its Series A to gain a foothold in the cybersecurity market and is preparing a Series B round to finance expansion into new regions and develop additional security services.</small>
|-
| style="text-align:center;" |<small>8</small>
|<small>Series B (or later stages) funding secured; continuous assessment of future funding needs</small>
|<small>With Series B funding secured, the startup enters a phase of accelerated growth, focusing on scaling its business operations and assessing ongoing funding requirements.</small> <small>It represents a mature startup with a significant customer base, driving towards becoming a market leader.</small>
|<small>DataAI, a machine learning analytics firm, after closing its Series B, is scaling its operations and enhancing its technology stack to meet the growing demand for big data solutions in the healthcare sector.</small>
|-
| style="text-align:center;" |<small>9</small>
|<small>Scaling, market expansion and strategic investment with a focus on exit</small>
|<small>The startup is in an advanced growth phase with potential market leadership, possibly exploring strategic investments, mergers, and acquisitions, or even preparing for public listing.</small> <small>At this stage, the startup is a well-established player with a sustainable, scalable business.</small>
|<small>GreenMobility, an electric vehicle sharing service, is expanding globally and exploring strategic partnerships or an IPO as it becomes a dominant player in the urban mobility sector.</small>
|}
© 2024 Massachusetts Institute of Technology (MIT). All Rights Reserved.
Authored by: Keselman and Murray
</div></div>
</div></div>


Line 177: Line 545:
<div style="font-weight:bold;line-height:1.6;">Mission Funding Readiness Level (MFRL)</div>
<div style="font-weight:bold;line-height:1.6;">Mission Funding Readiness Level (MFRL)</div>
<div class="mw-collapsible-content">
<div class="mw-collapsible-content">
Table
</div></div>
===Product-Market Fit===
====Positive Feedback====
====Challenges====
===Research & Development===
====???====
====???====
===Timeline Test===
<timeline>
DateFormat = dd/mm/yyyy
Define $width = 960
Define $warning = 300
Define $height = 1250
Define $dy = -5 # shift text to bottom side of bar
Define $start = 2020
Define $end = 2027
Define $now = 10/04/2026
ImageSize  = width:$width height:$height
PlotArea  = right:10 left:10 bottom:120 top:10
Period    = from:$start till:$end
TimeAxis  = orientation:horizontal format:yyyy
Legend = orientation:vertical position:bottom columns:4
Colors =
    id:bg              value:white
    id:lightline      value:gray(0.9)
    id:lighttext      value:gray(0.5)
    id:section        value:gray(0.9)
    id:TRL1            value:yellow2 Legend: TRL-1
    id:TRL2            value:orange Legend: TRL-2
    id:TRL3            value:oceanblue Legend: TRL-3
    id:TRL4            value:powderblue Legend: TRL-4
    id:TRL5            value:red Legend: TRL-5
    id:TRL6            value:lightpurple Legend: TRL-6
    id:TRL7            value:lavender Legend: TRL-7
    id:TRL8            value:claret Legend: TRL-8
    id:TRL9            value:brightblue Legend: TRL-9
    id:PILOT          value:green Legend: Pilot
    id:PROCESS        value:skyblue Legend: Process
    id:EVENT          value:drabgreen Legend: Event
    id:INVENTION      value:redorange Legend: Invention
    id:NAME            value:darkblue
    id:TODAY          value:yellowgreen
BackgroundColors = canvas:bg
ScaleMinor = gridcolor:lightline unit:month increment:1 start:$start
ScaleMajor = gridcolor:lighttext unit:year increment:1 start:2021
BarData=
  bar:title
# main milestones
  bar:section1
  bar:milestone0101
# startup & networking
  bar:section2
  bar:event0201
  bar:process0202
  bar:process0203
  bar:process0204
  bar:process0205
  bar:process0206
  bar:process0207
  bar:process0208
# problem-solution_fit
  bar:section3
  bar:process0301
  bar:process0302
  bar:process0303
  bar:event0304
  bar:event0305
  bar:event0306
  bar:event0307
  bar:event0308
  bar:event0309
  bar:event0310
  bar:process0311
# research & development
  bar:section4
  bar:milestone0401
  bar:milestone0402
  bar:milestone0403
  bar:milestone0404
  bar:milestone0405
  bar:process0406
  bar:process0407
  bar:process0408
  bar:process0409
  bar:process0410
  bar:process0411
  bar:process0412
  bar:process0413
  bar:process0414
  bar:process0415
  bar:process0416
  bar:process0417
# resources
  bar:section5
  bar:process0501
  bar:process0502
  bar:process0503
# explanation: attribute 'barset' instead of 'bar' means consecutive data lines are automatically placed on new bar
#              data lines are lines containing at: or from: & till: attributes
#              'barset:break' means 'reset barcounter' = next line will be placed at first bar in barset
#              'barset:skip'  means 'increment barcounter' = skip one bar for next data line (to allow extra space
#                                                                            for text containing line break = ~)
PlotData=
  align:left
  anchor:from
  fontsize:M
  width:15
  shift:(4,-6)
  textcolor:black
  color:section
  bar:title    from:start till:end text:"General Project Traction" fontsize:XL anchor:middle align:center width:35 color:bg mark:(line,bg)
  bar:section1 from:start till:end text:"Milestones"
  bar:section2 from:start till:end text:"Startup & Networking"
  bar:section3 from:start till:end text:"Problem-Solution Fit"
  bar:section4 from:start till:end text:"Research & Development"
  bar:section5 from:start till:end text:"Resources"
# main milestones
  bar:milestone0101 width:10
    textcolor:NAME at:01/01/2021 shift:(-110,$dy) text:[[Public:ARHUDFM_Features_Summary|ARHUDFM Project]]
    color:TRL1 from:18/02/2021 till:29/08/2021
    color:TRL2 from:29/08/2021 till:07/03/2022
    color:TRL3 from:07/03/2022 till:27/11/2022
    color:TRL4 from:27/11/2022 till:20/08/2023
    color:TRL5 from:20/08/2023 till:$now
# startup & networking
  bar:event0201 width:10
    textcolor:NAME at:01/01/2021 shift:(-40,$dy) text:[[Furtherium, Inc.|Incorporation]]
    color:EVENT from:26/06/2021 till:26/07/2021
  bar:process0202 width:10
    textcolor:NAME at:01/01/2021 shift:(-60,$dy) text:[[Public:ARHUDFM FAQ|Business Model and Roadmap]]
    color:PROCESS from:26/12/2021 till:14/10/2022
  bar:process0203 width:10
    textcolor:NAME at:01/01/2021 shift:(-30,$dy) text:German Accelerator, Kickstart program
    color:PROCESS from:07/11/2022 till:17/01/2023
  bar:process0204 width:10
    textcolor:NAME at:01/01/2021 shift:(180,$dy) text:Financial model
    color:PROCESS from:11/04/2023 till:$now
  bar:process0205 width:10
    textcolor:NAME at:01/01/2021 shift:(180,$dy) text:Production scheme
    color:PROCESS from:04/05/2023 till:$now
  bar:process0206 width:10
    textcolor:NAME at:01/01/2021 shift:(140,$dy) text:Business processes flow
    color:PROCESS from:24/05/2023 till:08/10/2023
  bar:process0207 width:10
    textcolor:NAME at:01/01/2021 shift:(200,$dy) text:Pitch Deck & Demo
    color:PROCESS from:16/07/2023 till:28/06/2024
  bar:process0208 width:10
    textcolor:NAME at:01/01/2021 shift:(260,$dy) text:Fundraisong, Pre-Seed Round
    color:PROCESS from:08/07/2024 till:$now
# problem-solution_fit
  bar:process0301 width:10
    textcolor:NAME at:01/01/2021 shift:(-90,$dy) text:Problem and solution research
    color:PROCESS from:01/04/2020 till:$now
  bar:process0302 width:10
    textcolor:NAME at:01/01/2021 shift:(-70,$dy) text:Competitive environment research
    color:PROCESS from:14/06/2020 till:$now
  bar:process0303 width:10
    textcolor:NAME at:01/01/2021 shift:(-60,$dy) text:DoD requirements research
    color:PROCESS from:08/07/2020 till:$now
  bar:event0304 width:10
    textcolor:NAME at:01/01/2021 shift:(-60,$dy) text:[[U.S._Defense_Programs|US DoD xTechSearch 6]]
    color:EVENT from:26/08/2021 till:07/10/2021
  bar:event0305 width:10
    textcolor:NAME at:01/01/2021 shift:(-70,$dy) text:US DoD Defense Innovation Unit
    color:EVENT from:12/02/2022 till:23/03/2022
  bar:event0306 width:10
    textcolor:NAME at:01/01/2021 shift:(90,$dy) text:DARPA DSO
    color:EVENT from:14/03/2022 till:21/04/2022
  bar:event0307 width:10
    textcolor:NAME at:01/01/2021 shift:(-50,$dy) text:Lockheed Martin Co., VTC Systems
    color:EVENT from:17/05/2022 till:01/06/2022
  bar:event0308 width:10
    textcolor:NAME at:01/01/2021 shift:(-60,$dy) text:Planungsamt der Bundeswehr, Abt. I
    color:EVENT from:22/05/2022 till:06/07/2022
  bar:event0309 width:10
    textcolor:NAME at:01/01/2021 shift:(100,$dy) text:[[U.S._Defense_Programs|US DoD xTechSearch 7]]
    color:EVENT from:20/11/2022 till:17/01/2023
  bar:event0310 width:10
    textcolor:NAME at:01/01/2021 shift:(70,$dy) text:Cyber Innovation Hub der Bw
    color:EVENT from:11/01/2023 till:16/02/2023
  bar:process0311 width:10
    textcolor:NAME at:01/01/2021 shift:(200,$dy) text:Mentorship program
    color:PROCESS from:01/07/2023 till:$now
# research & development
  bar:milestone0401 width:10
    textcolor:NAME at:01/01/2021 shift:(-110,$dy) text:Engineering Design
    color:TRL1 from:10/04/2021 till:29/08/2021
    color:TRL2 from:29/08/2021 till:07/12/2021
    color:TRL3 from:07/12/2021 till:27/01/2022
    color:TRL4 from:27/01/2022 till:$now
  bar:milestone0402 width:10
    textcolor:NAME at:01/01/2021 shift:(-20,$dy) text:Software Architecture
    color:TRL1 from:04/02/2022 till:10/05/2022
    color:TRL2 from:10/05/2022 till:07/04/2023
    color:TRL3 from:07/04/2023 till:$now
  bar:milestone0403 width:10
    textcolor:NAME at:01/01/2021 shift:(180,$dy) text:Project Backlog
    color:TRL1 from:18/03/2023 till:10/08/2023
    color:TRL2 from:10/08/2023 till:$now
  bar:milestone0404 width:10
    textcolor:NAME at:01/01/2021 shift:(240,$dy) text:User Interface
    color:TRL1 from:21/07/2023 till:19/08/2023
    color:TRL2 from:19/08/2023 till:21/01/2024
    color:TRL3 from:21/01/2024 till:14/06/2024
    color:TRL4 from:14/06/2024 till:$now
  bar:milestone0405 width:10
    textcolor:NAME at:01/01/2021 shift:(220,$dy) text:Prototyping
    color:TRL5 from:14/04/2023 till:$now
  bar:process0406 width:10
    textcolor:NAME at:01/01/2021 shift:(-80,$dy) text:Human Augmentation
    color:PROCESS from:26/05/2021 till:$now
  bar:process0407 width:10
    textcolor:NAME at:01/01/2021 shift:(-130,$dy) text:Artificial Intelligence, Computer Vision
    color:PROCESS from:17/02/2022 till:$now
  bar:process0408 width:10
    textcolor:NAME at:01/01/2021 shift:(100,$dy) text:Detection
    color:PROCESS from:06/04/2022 till:$now
  bar:process0409 width:10
    textcolor:NAME at:01/01/2021 shift:(-95,$dy) text:Communication
    color:PROCESS from:09/01/2021 till:$now
  bar:process0410 width:10
    textcolor:NAME at:01/01/2021 shift:(-110,$dy) text:Navigation & Task Management
    color:PROCESS from:30/09/2021 till:$now
  bar:process0411 width:10
    textcolor:NAME at:01/01/2021 shift:(-10,$dy) text:Fire assistance and ballistic
    color:PROCESS from:02/07/2022 till:$now
  bar:process0412 width:10
    textcolor:NAME at:01/01/2021 shift:(110,$dy) text:Protection
    color:PROCESS from:27/06/2022 till:$now
  bar:process0413 width:10
    textcolor:NAME at:01/01/2021 shift:(10,$dy) text:Vitals Body Sensors and Care Under Fire
    color:PROCESS from:18/03/2023 till:$now
  bar:process0414 width:10
    textcolor:NAME at:01/01/2021 shift:(-20,$dy) text:Defense & Tactical
    color:PROCESS from:31/10/2020 till:$now
  bar:process0415 width:10
    textcolor:NAME at:01/01/2021 shift:(425,$dy) text:OptEng & EEE inventions
    color:INVENTION from:14/03/2021 till:12/05/2021 #optical scheme of the light guide and light flux division with a constant focal length concept
    color:INVENTION from:19/09/2021 till:30/09/2021 #power supply and battery management concept
    color:INVENTION from:24/10/2021 till:16/10/2021 #active cooling system inside the sealed enclosure concept
    color:INVENTION from:04/03/2023 till:16/04/2023 #three-sensor video camera (UHD, HDR, SWIR) concept
    color:INVENTION from:08/05/2023 till:29/05/2023 #fading pads of the screen based on a polymer composition of electrochromic material with transparent electrically conductive layer tracks
    color:INVENTION from:11/11/2023 till:16/12/2023 #DLP implementation concept
  bar:process0416 width:10
    textcolor:NAME at:01/01/2021 shift:(510,$dy) text:EEE & SWE inventions
    color:INVENTION from:26/08/2021 till:12/09/2021 #Instant Messaging System
    color:INVENTION from:11/11/2021 till:23/12/2021 #embedded Software Defined Radio concept
    color:INVENTION from:04/02/2022 till:19/02/2022 #maps, navigation, path tracking app algorithms
    color:INVENTION from:09/05/2022 till:28/05/2022 #Task Management app algorithms
    color:INVENTION from:10/07/2022 till:30/07/2022 #Identification Friend-or-Foe methods, appearance, transponder
    color:INVENTION from:12/08/2022 till:04/10/2022 #embedded SDR scanner concept
    color:INVENTION from:03/12/2022 till:09/01/2023 #Software Defined Antenna Rx / Tx, 2 MHz - 8 GHz, 64 patch antennas (highly‐directional RF digital beams, fixed & hopping frequencies) for Comms, RF scanner, Radio Direction Finding, Radar Detection, Passive Radar, Drone Detection, Remote Control
    color:INVENTION from:06/03/2023 till:20/03/2023 #Handheld metal re-radiation radar concept
    color:INVENTION from:17/04/2023 till:29/04/2023 #Radar warning receiver concept
    color:INVENTION from:10/07/2023 till:31/07/2023 #built-in drone & robot & unmanned vehicle remote control
    color:INVENTION from:03/08/2023 till:19/08/2023 #AI-based chat, mental clusterization, auto-reply algorithms
    color:INVENTION from:24/08/2023 till:16/09/2023 #Gunfire Locator concept
    color:INVENTION from:18/12/2023 till:21/01/2024 #Hardware Architecture concept
    color:INVENTION from:12/02/2024 till:05/05/2024 #CPU Intel Core i7 14-Gen, Chipset Intel 700 implementation concept
    color:INVENTION from:04/06/2024 till:25/06/2024 #Intel Gaudi 3 AI Accelerator, NPU Loihi 2 implementation concept
  bar:process0417 width:10
    textcolor:NAME at:01/01/2021 shift:(410,$dy) text:MechEng & EEE inventions
    color:INVENTION from:12/02/2021 till:28/02/2021 #built-in hands-free drinking system design
    color:INVENTION from:18/03/2021 till:03/05/2021 #HEPA-14/ULPA-15 membrane design of replaceable air filters with a low resistance to airflow
    color:INVENTION from:09/06/2021 till:20/06/2021 #headphones ear cups design (Audial Augmentation, ventilation, shock wave and sound overpressure protection)
    color:INVENTION from:10/02/2023 till:22/02/2023 #Continuous Wind Capture impellers
    color:INVENTION from:03/06/2023 till:25/06/2023 #four-sensor digital sight 24x (UHD, HDR, SWIR, LWIR)
    color:INVENTION from:04/07/2023 till:19/07/2023 #built-in 2 pneumatic pumps and NO micro solenoid check valve for pulmonary resuscitation
    color:INVENTION from:25/07/2023 till:16/08/2023 #wearable automatic tourniquets for emergency stoppage of acute bleeding in the limbs with built-in sensors for monitoring vital signs
    color:INVENTION from:26/08/2023 till:04/09/2023 #elastic belt with pockets, automatic infusion therapy (fluid resuscitation) system (NC micro solenoid check valve, pre-pressured container for plasma substitute and anticoagulant) with integrated ECG sensors and defibrillator electrodes, automatic defibrillator
    color:INVENTION from:09/09/2023 till:16/09/2023 #microphone array concept
# resources
  bar:process0501 width:10
    textcolor:NAME at:01/01/2021 shift:(170,$dy) text:Basic materials and suppliers identified
    color:PROCESS from:26/05/2021 till:28/01/2022
  bar:process0502 width:10
    textcolor:NAME at:01/01/2021 shift:(-40,$dy) text:Lab equipped
    color:PROCESS from:11/05/2021 till:24/03/2022
  bar:process0503 width:10
    textcolor:NAME at:01/01/2021 shift:(290,$dy) text:Materials and SMT components for prototyping
    color:PROCESS from:02/07/2021 till:14/12/2022
#  bar:0 width:1
#    textcolor:red at:06/04/2021 shift:(3,-4) text:WW-I
#    textcolor:red at:08/12/2022 shift:(3,-4) text:WW-II 
LineData=
  at:$now color:TODAY width:0.2
#  at:06/04/2021 color:red width:0.2 layer:back
#  at:28/06/2021 color:blue width:0.2 layer:back
#  at:06/09/2021 color:pink width:10 layer:back
#  at:06/05/2022 color:pink width:10 layer:back
#  at:06/12/2022 color:pink width:10 layer:back
#  at:06/03/2023 color:pink width:10 layer:back
</timeline>
===Timeline Old===
{{#tag:timeline|
DateFormat = dd/mm/yyyy
Define $width = 960
Define $warning = 300
Define $height = 1250
Define $dy = -5 # shift text to bottom side of bar
Define $start = 2020
Define $end = 2026
Define $now = {{CURRENTDAY2}}/{{CURRENTMONTH}}/{{CURRENTYEAR}}
ImageSize  = width:$width height:$height
PlotArea  = right:10 left:10 bottom:120 top:10
Period    = from:$start till:$end
TimeAxis  = orientation:horizontal format:yyyy
Legend = orientation:vertical position:bottom columns:4
Colors =
    id:bg              value:white
    id:lightline      value:gray(0.9)
    id:lighttext      value:gray(0.5)
    id:section        value:gray(0.9)
    id:TRL1            value:yellow2 Legend: TRL-1
    id:TRL2            value:orange Legend: TRL-2
    id:TRL3            value:oceanblue Legend: TRL-3
    id:TRL4            value:powderblue Legend: TRL-4
    id:TRL5            value:red Legend: TRL-5
    id:TRL6            value:lightpurple Legend: TRL-6
    id:TRL7            value:lavender Legend: TRL-7
    id:TRL8            value:claret Legend: TRL-8
    id:TRL9            value:brightblue Legend: TRL-9
    id:PILOT          value:green Legend: Pilot
    id:PROCESS        value:skyblue Legend: Process
    id:EVENT          value:drabgreen Legend: Event
    id:INVENTION      value:redorange Legend: Invention
    id:NAME            value:darkblue
    id:TODAY          value:yellowgreen
BackgroundColors = canvas:bg
ScaleMinor = gridcolor:lightline unit:month increment:1 start:$start
ScaleMajor = gridcolor:lighttext unit:year increment:1 start:2021
BarData=
  bar:title
# main milestones
  bar:section1
  bar:milestone0101
# startup & networking
  bar:section2
  bar:event0201
  bar:process0202
  bar:process0203
  bar:process0204
  bar:process0205
  bar:process0206
  bar:process0207
  bar:process0208
# problem-solution_fit
  bar:section3
  bar:process0301
  bar:process0302
  bar:process0303
  bar:event0304
  bar:event0305
  bar:event0306
  bar:event0307
  bar:event0308
  bar:event0309
  bar:event0310
  bar:process0311
# research & development
  bar:section4
  bar:milestone0401
  bar:milestone0402
  bar:milestone0403
  bar:milestone0404
  bar:milestone0405
  bar:process0406
  bar:process0407
  bar:process0408
  bar:process0409
  bar:process0410
  bar:process0411
  bar:process0412
  bar:process0413
  bar:process0414
  bar:process0415
  bar:process0416
  bar:process0417
# resources
  bar:section5
  bar:process0501
  bar:process0502
  bar:process0503
# explanation: attribute 'barset' instead of 'bar' means consecutive data lines are automatically placed on new bar
#              data lines are lines containing at: or from: & till: attributes
#              'barset:break' means 'reset barcounter' = next line will be placed at first bar in barset
#              'barset:skip'  means 'increment barcounter' = skip one bar for next data line (to allow extra space
#                                                                            for text containing line break = ~)
PlotData=
  align:left
  anchor:from
  fontsize:M
  width:15
  shift:(4,-6)
  textcolor:black
  color:section
  bar:title    from:start till:end text:"General Project Traction" fontsize:XL anchor:middle align:center width:35 color:bg mark:(line,bg)
  bar:section1 from:start till:end text:"Milestones"
  bar:section2 from:start till:end text:"Startup & Networking"
  bar:section3 from:start till:end text:"Problem-Solution Fit"
  bar:section4 from:start till:end text:"Research & Development"
  bar:section5 from:start till:end text:"Resources"
# main milestones
  bar:milestone0101 width:10
    textcolor:NAME at:01/01/2021 shift:(-110,$dy) text:[[Public:ARHUDFM_Features_Summary|ARHUDFM Project]]
    color:TRL1 from:18/02/2021 till:29/08/2021
    color:TRL2 from:29/08/2021 till:07/03/2022
    color:TRL3 from:07/03/2022 till:27/11/2022
    color:TRL4 from:27/11/2022 till:20/08/2023
    color:TRL5 from:20/08/2023 till:$now
# startup & networking
  bar:event0201 width:10
    textcolor:NAME at:01/01/2021 shift:(-40,$dy) text:[[Furtherium, Inc.|Incorporation]]
    color:EVENT from:26/06/2021 till:26/07/2021
  bar:process0202 width:10
    textcolor:NAME at:01/01/2021 shift:(-60,$dy) text:[[Public:ARHUDFM FAQ|Business Model and Roadmap]]
    color:PROCESS from:26/12/2021 till:14/10/2022
  bar:process0203 width:10
    textcolor:NAME at:01/01/2021 shift:(-30,$dy) text:German Accelerator, Kickstart program
    color:PROCESS from:07/11/2022 till:17/01/2023
  bar:process0204 width:10
    textcolor:NAME at:01/01/2021 shift:(180,$dy) text:Financial model
    color:PROCESS from:11/04/2023 till:$now
  bar:process0205 width:10
    textcolor:NAME at:01/01/2021 shift:(180,$dy) text:Production scheme
    color:PROCESS from:04/05/2023 till:$now
  bar:process0206 width:10
    textcolor:NAME at:01/01/2021 shift:(140,$dy) text:Business processes flow
    color:PROCESS from:24/05/2023 till:08/10/2023
  bar:process0207 width:10
    textcolor:NAME at:01/01/2021 shift:(200,$dy) text:Pitch Deck & Demo
    color:PROCESS from:16/07/2023 till:28/06/2024
  bar:process0208 width:10
    textcolor:NAME at:01/01/2021 shift:(260,$dy) text:Fundraisong, Pre-Seed Round
    color:PROCESS from:08/07/2024 till:$now
# problem-solution_fit
  bar:process0301 width:10
    textcolor:NAME at:01/01/2021 shift:(-90,$dy) text:Problem and solution research
    color:PROCESS from:01/04/2020 till:$now
  bar:process0302 width:10
    textcolor:NAME at:01/01/2021 shift:(-70,$dy) text:Competitive environment research
    color:PROCESS from:14/06/2020 till:$now
  bar:process0303 width:10
    textcolor:NAME at:01/01/2021 shift:(-60,$dy) text:DoD requirements research
    color:PROCESS from:08/07/2020 till:$now
  bar:event0304 width:10
    textcolor:NAME at:01/01/2021 shift:(-60,$dy) text:[[U.S._Defense_Programs|US DoD xTechSearch 6]]
    color:EVENT from:26/08/2021 till:07/10/2021
  bar:event0305 width:10
    textcolor:NAME at:01/01/2021 shift:(-70,$dy) text:US DoD Defense Innovation Unit
    color:EVENT from:12/02/2022 till:23/03/2022
  bar:event0306 width:10
    textcolor:NAME at:01/01/2021 shift:(90,$dy) text:DARPA DSO
    color:EVENT from:14/03/2022 till:21/04/2022
  bar:event0307 width:10
    textcolor:NAME at:01/01/2021 shift:(-50,$dy) text:Lockheed Martin Co., VTC Systems
    color:EVENT from:17/05/2022 till:01/06/2022
  bar:event0308 width:10
    textcolor:NAME at:01/01/2021 shift:(-60,$dy) text:Planungsamt der Bundeswehr, Abt. I
    color:EVENT from:22/05/2022 till:06/07/2022
  bar:event0309 width:10
    textcolor:NAME at:01/01/2021 shift:(100,$dy) text:[[U.S._Defense_Programs|US DoD xTechSearch 7]]
    color:EVENT from:20/11/2022 till:17/01/2023
  bar:event0310 width:10
    textcolor:NAME at:01/01/2021 shift:(70,$dy) text:Cyber Innovation Hub der Bw
    color:EVENT from:11/01/2023 till:16/02/2023
  bar:process0311 width:10
    textcolor:NAME at:01/01/2021 shift:(200,$dy) text:Mentorship program
    color:PROCESS from:01/07/2023 till:$now
# research & development
  bar:milestone0401 width:10
    textcolor:NAME at:01/01/2021 shift:(-110,$dy) text:Engineering Design
    color:TRL1 from:10/04/2021 till:29/08/2021
    color:TRL2 from:29/08/2021 till:07/12/2021
    color:TRL3 from:07/12/2021 till:27/01/2022
    color:TRL4 from:27/01/2022 till:$now
  bar:milestone0402 width:10
    textcolor:NAME at:01/01/2021 shift:(-20,$dy) text:Software Architecture
    color:TRL1 from:04/02/2022 till:10/05/2022
    color:TRL2 from:10/05/2022 till:07/04/2023
    color:TRL3 from:07/04/2023 till:$now
  bar:milestone0403 width:10
    textcolor:NAME at:01/01/2021 shift:(180,$dy) text:Project Backlog
    color:TRL1 from:18/03/2023 till:10/08/2023
    color:TRL2 from:10/08/2023 till:$now
  bar:milestone0404 width:10
    textcolor:NAME at:01/01/2021 shift:(240,$dy) text:User Interface
    color:TRL1 from:21/07/2023 till:19/08/2023
    color:TRL2 from:19/08/2023 till:21/01/2024
    color:TRL3 from:21/01/2024 till:14/06/2024
    color:TRL4 from:14/06/2024 till:$now
  bar:milestone0405 width:10
    textcolor:NAME at:01/01/2021 shift:(220,$dy) text:Prototyping
    color:TRL5 from:14/04/2023 till:$now
  bar:process0406 width:10
    textcolor:NAME at:01/01/2021 shift:(-80,$dy) text:Human Augmentation
    color:PROCESS from:26/05/2021 till:$now
  bar:process0407 width:10
    textcolor:NAME at:01/01/2021 shift:(-130,$dy) text:Artificial Intelligence, Computer Vision
    color:PROCESS from:17/02/2022 till:$now
  bar:process0408 width:10
    textcolor:NAME at:01/01/2021 shift:(100,$dy) text:Detection
    color:PROCESS from:06/04/2022 till:$now
  bar:process0409 width:10
    textcolor:NAME at:01/01/2021 shift:(-95,$dy) text:Communication
    color:PROCESS from:09/01/2021 till:$now
  bar:process0410 width:10
    textcolor:NAME at:01/01/2021 shift:(-110,$dy) text:Navigation & Task Management
    color:PROCESS from:30/09/2021 till:$now
  bar:process0411 width:10
    textcolor:NAME at:01/01/2021 shift:(-10,$dy) text:Fire assistance and ballistic
    color:PROCESS from:02/07/2022 till:$now
  bar:process0412 width:10
    textcolor:NAME at:01/01/2021 shift:(110,$dy) text:Protection
    color:PROCESS from:27/06/2022 till:$now
  bar:process0413 width:10
    textcolor:NAME at:01/01/2021 shift:(10,$dy) text:Vitals Body Sensors and Care Under Fire
    color:PROCESS from:18/03/2023 till:$now
  bar:process0414 width:10
    textcolor:NAME at:01/01/2021 shift:(-20,$dy) text:Defense & Tactical
    color:PROCESS from:31/10/2020 till:$now
  bar:process0415 width:10
    textcolor:NAME at:01/01/2021 shift:(425,$dy) text:OptEng & EEE inventions
    color:INVENTION from:14/03/2021 till:12/05/2021 #optical scheme of the light guide and light flux division with a constant focal length concept
    color:INVENTION from:19/09/2021 till:30/09/2021 #power supply and battery management concept
    color:INVENTION from:24/10/2021 till:16/10/2021 #active cooling system inside the sealed enclosure concept
    color:INVENTION from:04/03/2023 till:16/04/2023 #three-sensor video camera (UHD, HDR, SWIR) concept
    color:INVENTION from:08/05/2023 till:29/05/2023 #fading pads of the screen based on a polymer composition of electrochromic material with transparent electrically conductive layer tracks
    color:INVENTION from:11/11/2023 till:16/12/2023 #DLP implementation concept
  bar:process0416 width:10
    textcolor:NAME at:01/01/2021 shift:(510,$dy) text:EEE & SWE inventions
    color:INVENTION from:26/08/2021 till:12/09/2021 #Instant Messaging System
    color:INVENTION from:11/11/2021 till:23/12/2021 #embedded Software Defined Radio concept
    color:INVENTION from:04/02/2022 till:19/02/2022 #maps, navigation, path tracking app algorithms
    color:INVENTION from:09/05/2022 till:28/05/2022 #Task Management app algorithms
    color:INVENTION from:10/07/2022 till:30/07/2022 #Identification Friend-or-Foe methods, appearance, transponder
    color:INVENTION from:12/08/2022 till:04/10/2022 #embedded SDR scanner concept
    color:INVENTION from:03/12/2022 till:09/01/2023 #Software Defined Antenna Rx / Tx, 2 MHz - 8 GHz, 64 patch antennas (highly‐directional RF digital beams, fixed & hopping frequencies) for Comms, RF scanner, Radio Direction Finding, Radar Detection, Passive Radar, Drone Detection, Remote Control
    color:INVENTION from:06/03/2023 till:20/03/2023 #Handheld metal re-radiation radar concept
    color:INVENTION from:17/04/2023 till:29/04/2023 #Radar warning receiver concept
    color:INVENTION from:10/07/2023 till:31/07/2023 #built-in drone & robot & unmanned vehicle remote control
    color:INVENTION from:03/08/2023 till:19/08/2023 #AI-based chat, mental clusterization, auto-reply algorithms
    color:INVENTION from:24/08/2023 till:16/09/2023 #Gunfire Locator concept
    color:INVENTION from:18/12/2023 till:21/01/2024 #Hardware Architecture concept
    color:INVENTION from:12/02/2024 till:05/05/2024 #CPU Intel Core i7 14-Gen, Chipset Intel 700 implementation concept
    color:INVENTION from:04/06/2024 till:25/06/2024 #Intel Gaudi 3 AI Accelerator, NPU Loihi 2 implementation concept
  bar:process0417 width:10
    textcolor:NAME at:01/01/2021 shift:(410,$dy) text:MechEng & EEE inventions
    color:INVENTION from:12/02/2021 till:28/02/2021 #built-in hands-free drinking system design
    color:INVENTION from:18/03/2021 till:03/05/2021 #HEPA-14/ULPA-15 membrane design of replaceable air filters with a low resistance to airflow
    color:INVENTION from:09/06/2021 till:20/06/2021 #headphones ear cups design (Audial Augmentation, ventilation, shock wave and sound overpressure protection)
    color:INVENTION from:10/02/2023 till:22/02/2023 #Continuous Wind Capture impellers
    color:INVENTION from:03/06/2023 till:25/06/2023 #four-sensor digital sight 24x (UHD, HDR, SWIR, LWIR)
    color:INVENTION from:04/07/2023 till:19/07/2023 #built-in 2 pneumatic pumps and NO micro solenoid check valve for pulmonary resuscitation
    color:INVENTION from:25/07/2023 till:16/08/2023 #wearable automatic tourniquets for emergency stoppage of acute bleeding in the limbs with built-in sensors for monitoring vital signs
    color:INVENTION from:26/08/2023 till:04/09/2023 #elastic belt with pockets, automatic infusion therapy (fluid resuscitation) system (NC micro solenoid check valve, pre-pressured container for plasma substitute and anticoagulant) with integrated ECG sensors and defibrillator electrodes, automatic defibrillator
    color:INVENTION from:09/09/2023 till:16/09/2023 #microphone array concept
# resources
  bar:process0501 width:10
    textcolor:NAME at:01/01/2021 shift:(170,$dy) text:Basic materials and suppliers identified
    color:PROCESS from:26/05/2021 till:28/01/2022
  bar:process0502 width:10
    textcolor:NAME at:01/01/2021 shift:(-40,$dy) text:Lab equipped
    color:PROCESS from:11/05/2021 till:24/03/2022
  bar:process0503 width:10
    textcolor:NAME at:01/01/2021 shift:(290,$dy) text:Materials and SMT components for prototyping
    color:PROCESS from:02/07/2021 till:14/12/2022
#  bar:0 width:1
#    textcolor:red at:06/04/2021 shift:(3,-4) text:WW-I
#    textcolor:red at:08/12/2022 shift:(3,-4) text:WW-II 
LineData=
  at:$now color:TODAY width:0.2
#  at:06/04/2021 color:red width:0.2 layer:back
#  at:28/06/2021 color:blue width:0.2 layer:back
#  at:06/09/2021 color:pink width:10 layer:back
#  at:06/05/2022 color:pink width:10 layer:back
#  at:06/12/2022 color:pink width:10 layer:back
#  at:06/03/2023 color:pink width:10 layer:back
}}
{| class="wikitable"
{| class="wikitable"
! style="text-align:center;" |<small>TRL</small>
! style="text-align:center;" |<small>MFRL</small>
! style="width: 22%" |<small>NASA usage</small>
! style="width: 30%" |<small>Definition</small>
! style="width: 52%" |<small>DoD usage<ref>Dr. John Niemela and Dr. Matthew Fisher, [https://asc.army.mil/docs/pubs/alt/2004/3_MayJun/articles/10_Use_of_Tech_Readiness_Levels_for_Software_Dev_200403.pdf The Use of Technology Readiness Levels for Software Development]</ref><ref>[https://uploads-ssl.webflow.com/61de9faf3e98d5e793174909/623997b9292d754d358a8815_AVF-DS-TRL-MRL-SRL-Jan2022.pdf TRL-IRL-SRL Definitions]</ref><ref>OUSD(R&E), [https://www.cto.mil/wp-content/uploads/2023/07/TRA-Guide-Jun2023.pdf Technology Readiness Assessment Guidebook], 2023</ref></small>
! style="width: 35%" |<small>Description</small>
! style="width: 22%" |<small>European Union</small>
! style="width: 35%" |<small>Example</small>
|-
|-
| style="text-align:center;" |<small>1</small>
| style="text-align:center;" |<small>1</small>
|<small>Basic principles observed and reported</small>
|<small>Exploring a dual-use funding strategy</small>
|<small>Scientific research begins to be translated into applied R&D</small>
|<small>The startup is exploring a dual-use strategy, where it considers opportunities for its technology in both commercial and mission-driven applications. This phase involves researching possible mission partnerships and funding sources like government grants or contracts.</small>
|<small>Basic principles observed</small>
|<small>Imaginary Co., while focusing on eco-friendly packaging solutions for commercial use, is also investigating defense applications for lightweight, durable materials and potential government funding for R&D.</small>
|-
|-
| style="text-align:center;" |<small>2</small>
| style="text-align: center;" |<small>2</small>
|<small>Technology concept and/or application formulated</small>
|<small>Identification of first phase funding sources, such as innovation grants or R&D programs</small>
|<small>Invention begins. Once basic principles are observed, practical applications can be invented</small>
|<small>Identification of funding sources for initial phase projects is underway, such as innovation grants or R&D programs, to support the startup's mission-related product or technology development.</small>
|<small>Technology concept formulated</small>
|<small>TechWidget Inc. is identifying government and private grant programs that could finance further development of its health monitoring wearable for use in remote patient monitoring for military personnel.</small>
|-
|-
| style="text-align:center;" |<small>3</small>
| style="text-align:center;" |<small>3</small>
|<small>Analytical and experimental critical function and/or characteristic proof-of concept</small>
|<small>Application(s) submitted to secure first phase funding and mission partnership opportunities</small>
|<small>Active R&D is initiated. This includes analytical studies to produce code and laboratory studies to physically validate analytical predictions of separate technology HW/SW elements</small>
|<small>The startup has applied to secure first-phase funding and is actively seeking partnerships with mission-focused organizations to support and guide its product development for mission use.</small>
|<small>Experimental proof of concept</small>
|<small>BioExplore LLC has submitted proposals for government grants to further its rapid disease detection technology for bio-surveillance missions and is seeking partnerships with public health agencies.</small>
|-
|-
| style="text-align:center;" |<small>4</small>
| style="text-align:center;" |<small>4</small>
|<small>Component and/or breadboard validation in laboratory environment</small>
|<small>Award(s) of first phase non-dilutive funding from mission-driven organizations</small>
|<small>Basic technological components are integrated to establish that they will work together. System SW architecture development initiated to include interoperability, reliability, maintainability, extensibility, scalability and security issues</small>
|<small>The startup has been awarded its first phase of non-dilutive funding from mission-driven organizations, marking a transition from the planning to execution phase in its mission strategy.</small>
|<small>Technology validated in lab</small>
|<small>GreenDwell Homes has received an innovation grant for the development of sustainable living modules that can be used for rapid deployment in disaster relief missions.</small>
|-
|-
| style="text-align:center;" |<small>5</small>
| style="text-align:center;" |<small>5</small>
|<small>Component and/or breadboard validation in relevant environment</small>
|<small>Continued dual-use strategy while securing procurement relationships with funded mission partners</small>
|<small>The basic technological HW/SW components are integrated with reasonably realistic supporting elements so that they can be tested in a simulated environment</small>
|<small>The startup continues its dual-use strategy, securing procurement relationships with funded mission partners. This level involves more in-depth collaboration to align the product with mission requirements.</small>
|<small>Technology validated in relevant environment (industrially relevant environment in the case of key enabling technologies)</small>
|<small>EduTech Solutions is working closely with education-focused NGOs to deploy its software in underserved regions, aligning with both commercial objectives and educational missions.</small>
|-
|-
| style="text-align:center;" |<small>6</small>
| style="text-align:center;" |<small>6</small>
|<small>System/subsystem model or prototype demonstration in a relevant environment (ground or space)</small>
|<small>Application(s) submitted for follow-on grant or award phases; at least one deep partnership with mission user</small>
|<small>Examples include testing a prototype in a high-fidelity lab environment or a live/virtual experiment or in a simulated operational environment</small>
|<small>After submitting applications for follow-on grant or award phases, the startup has at least one deep partnership with a mission user. This stage confirms the potential fit of the startup's product within mission-driven programs.</small>
|<small>Technology demonstrated in relevant environment (industrially relevant environment in the case of key enabling technologies)</small>
|<small>VirtualEvents Platform is applying for additional funding to enhance its platform for training simulations for emergency response teams after establishing a key partnership with a national disaster response organization.</small>
|-
|-
| style="text-align:center;" |<small>7</small>
| style="text-align:center;" |<small>7</small>
|<small>System prototype demonstration in a space environment</small>
|<small>Award(s) of follow-on phases of funding and progress in securing enduring pathways into mission production</small>
|<small>Prototype near, or at, planned operational system. Algorithms run on processor of the operational environment integrated with actual external entities. SW support structure in place. SW releases are in distinct versions. Frequency and severity of SW deficiency reports do not significantly degrade functionality or performance. Verification, Validation and Accreditation (VV&A) completed</small>
|<small>The startup has secured follow-on phases of funding, demonstrating progress in establishing enduring pathways into mission production, which can lead to a viable long-term contract or integration into mission programs.</small>
|<small>System prototype demonstration in operational environment</small>
|<small>CloudSecure Inc. has advanced to the next phase of funding for its cybersecurity solutions after proving its value in pilot programs with a government agency, moving towards becoming a regular part of the agency's security infrastructure.</small>
|-
|-
| style="text-align:center;" |<small>8</small>
| style="text-align:center;" |<small>8</small>
|<small>Actual system completed and "flight qualified" through test and demonstration (ground or space)</small>
|<small>Substantial investment from late-phase mission procurement partner for continued development</small>
|<small>Technology and SW has been proven and demonstrated to work in its final form and under expected conditions. In almost all cases, TRL represents the end of true system development. Examples include developmental test and evaluation (T&E) of the system in its intended weapon system to determine if it meets design specifications</small>
|<small>The startup has received significant investment from late-phase mission procurement partners for continued development. This investment helps in fine-tuning the product for mission-specific needs and paves the way for formal adoption.</small>
|<small>System complete and qualified</small>
|<small>DataAI has secured a substantial contract from a defense contractor for its analytics platform, to be tailored for intelligence gathering and analysis, marking a critical step towards integration into national defense systems.</small>
|-
|-
| style="text-align:center;" |<small>9</small>
| style="text-align:center;" |<small>9</small>
|<small>Actual system "flight proven" through successful mission operations</small>
|<small>Long-term funding secured through production contracts or integration into the mission budget</small>
|<small>In almost all cases, this is the end of the last “bugfixing” aspects of system development. Examples include using the system under operational mission conditions. SW releases are production versions and configuration controlled. Frequency and severity of SW deficiencies are at a minimum</small>
|<small>With long-term funding secured through production contracts or integration into the mission budget, the startup's product becomes part of the standard issue or sees widespread deployment across multiple units or platforms within the mission context.</small>
|<small>Actual system proven in operational environment (competitive manufacturing in the case of key enabling technologies; or in space)</small>
|<small>GreenMobility's electric vehicle sharing technology has been adapted and integrated into military bases around the country for efficient, on-demand transportation, backed by a multi-year contract with the Department of Defense.</small>
|}
|}
© 2024 Massachusetts Institute of Technology (MIT). All Rights Reserved.
Authored by: Keselman and Murray
</div></div>


==Roadmap==
===Product-Market Fit===
{{Main Article|[[Public:Business_Tables]]|||||||||}}<br>


{{#tag:timeline|
<html><iframe title="Positive Feedback" aria-label="Scatter Plot" id="datawrapper-chart-GjLVd" src="https://datawrapper.dwcdn.net/GjLVd/2/" scrolling="no" frameborder="0" style="width: 0; min-width: 100% !important; border: none;" height="571" data-external="1"></iframe><script type="text/javascript">window.addEventListener("message",function(a){if(void 0!==a.data["datawrapper-height"]){var e=document.querySelectorAll("iframe");for(var t in a.data["datawrapper-height"])for(var r,i=0;r=e[i];i++)if(r.contentWindow===a.source){var d=a.data["datawrapper-height"][t]+"px";r.style.height=d}}});</script></html>
DateFormat = dd/mm/yyyy
Define $width = 960
Define $warning = 300
Define $height = 2000
Define $dy = -5 # shift text to bottom side of bar
Define $start = 2024
Define $end = 2028
Define $now = {{CURRENTDAY2}}/{{CURRENTMONTH}}/{{CURRENTYEAR}}


ImageSize  = width:$width height:$height
<html><iframe title="Defense Challenge" aria-label="Scatter Plot" id="datawrapper-chart-mwXTw" src="https://datawrapper.dwcdn.net/mwXTw/1/" scrolling="no" frameborder="0" style="width: 0; min-width: 100% !important; border: none;" height="592" data-external="1"></iframe><script type="text/javascript">window.addEventListener("message",function(a){if(void 0!==a.data["datawrapper-height"]){var e=document.querySelectorAll("iframe");for(var t in a.data["datawrapper-height"])for(var r,i=0;r=e[i];i++)if(r.contentWindow===a.source){var d=a.data["datawrapper-height"][t]+"px";r.style.height=d}}});</script></html>
PlotArea  = right:10 left:10 bottom:120 top:10
Period    = from:$start till:$end
TimeAxis  = orientation:horizontal format:yyyy
Legend = orientation:vertical position:bottom columns:4


Colors =
===More Details in the Community===
    id:bg              value:white
    id:lightline      value:gray(0.9)
    id:lighttext      value:gray(0.5)
    id:section        value:gray(0.9)
    id:TRL1            value:yellow2 Legend: TRL-1
    id:TRL2            value:orange Legend: TRL-2
    id:TRL3            value:oceanblue Legend: TRL-3
    id:TRL4            value:powderblue Legend: TRL-4
    id:TRL5            value:red Legend: TRL-5
    id:TRL6            value:lightpurple Legend: TRL-6
    id:TRL7            value:lavender Legend: TRL-7
    id:TRL8            value:claret Legend: TRL-8
    id:TRL9            value:brightblue Legend: TRL-9
    id:PILOT          value:green Legend: Pilot
    id:PROCESS        value:skyblue Legend: Process
    id:EVENT          value:drabgreen Legend: Event
    id:INVENTION      value:redorange Legend: Invention
    id:NAME            value:darkblue
    id:TODAY          value:yellowgreen


BackgroundColors = canvas:bg
If you’d like to see not only aggregated data but also in-depth content, including detailed discussions on a wide range of topics related to user cases and technologies, join the discussion by clicking the link below.
ScaleMinor = gridcolor:lightline unit:month increment:1 start:$start
[https://furtherium.com/in1 Invitation for new users]
ScaleMajor = gridcolor:lighttext unit:year increment:1 start:2024


BarData=
<html>
   bar:title
<iframe
  src="https://community.furtherium.com/invites/ZHQXBGcGdk"
  width="100%"
  height="700"
  frameborder="0"
  allow="clipboard-write"
  sandbox="allow-scripts allow-same-origin allow-forms"
   style="display:block; border:none; max-width:100%;"
></iframe>
</html>


# main milestones
===Research & Development===
  bar:section1
  bar:milestone0101


# Design Development & Algorithm Architecture: Ada Lovelace Team
<html><iframe title="Achievements" aria-label="Small multiple donut chart" id="datawrapper-chart-KmTlQ" src="https://datawrapper.dwcdn.net/KmTlQ/1/" scrolling="no" frameborder="0" style="width: 0; min-width: 100% !important; border: none;" height="456" data-external="1"></iframe><script type="text/javascript">window.addEventListener("message",function(a){if(void 0!==a.data["datawrapper-height"]){var e=document.querySelectorAll("iframe");for(var t in a.data["datawrapper-height"])for(var r,i=0;r=e[i];i++)if(r.contentWindow===a.source){var d=a.data["datawrapper-height"][t]+"px";r.style.height=d}}});</script></html>
  bar:section2
  bar:milestone0201
  bar:milestone0202
  bar:milestone0203
  bar:milestone0204
  bar:milestone0205


# Mechanical Engineering: Stephanie Kwolek Team
==Roadmap==
  bar:section3
{{Main Article|[[Public:Dataroom]]|||||||||}}<br>
  bar:milestone0301
  bar:milestone0302
  bar:milestone0303
  bar:milestone0304
  bar:milestone0305
  bar:milestone0306


# Optical Engineering: Katharine Blodgett Team
<html><iframe title="Roadmap: Project A" aria-label="Small multiple line chart" id="datawrapper-chart-gn8Yi" src="https://datawrapper.dwcdn.net/gn8Yi/1/" scrolling="no" frameborder="0" style="width: 0; min-width: 100% !important; border: none;" height="528" data-external="1"></iframe><script type="text/javascript">window.addEventListener("message",function(a){if(void 0!==a.data["datawrapper-height"]){var e=document.querySelectorAll("iframe");for(var t in a.data["datawrapper-height"])for(var r,i=0;r=e[i];i++)if(r.contentWindow===a.source){var d=a.data["datawrapper-height"][t]+"px";r.style.height=d}}});</script></html>
  bar:section4
  bar:milestone0401
  bar:milestone0402
  bar:milestone0403


# Electronics Engineering: Ida Hyde Team
<html><iframe title="Roadmap: Project B" aria-label="Small multiple line chart" id="datawrapper-chart-F2oOQ" src="https://datawrapper.dwcdn.net/F2oOQ/1/" scrolling="no" frameborder="0" style="width: 0; min-width: 100% !important; border: none;" height="2470" data-external="1"></iframe><script type="text/javascript">window.addEventListener("message",function(a){if(void 0!==a.data["datawrapper-height"]){var e=document.querySelectorAll("iframe");for(var t in a.data["datawrapper-height"])for(var r,i=0;r=e[i];i++)if(r.contentWindow===a.source){var d=a.data["datawrapper-height"][t]+"px";r.style.height=d}}});</script></html>
  bar:section5
  bar:milestone0501
  bar:milestone0502
  bar:milestone0503
  bar:milestone0504
  bar:milestone0505


# Software Development: Hedy Lamarr Team
===Investment Rounds Goals===
  bar:section6
{| class="wikitable"
  bar:milestone0601
|+
  bar:milestone0602
!Time Period
  bar:milestone0603
!Round
  bar:milestone0604
!Amount
  bar:milestone0605
!Goals (Project A + Project B)
  bar:milestone0606
|-
  bar:milestone0607
|Q2 2026
  bar:milestone0608
|Seed
  bar:milestone0609
|$4,000,000
  bar:milestone0610
|
  bar:milestone0611
*[TRL 6] MVP<sub>α</sub>
  bar:milestone0612
*[TRL 7] MVP<sub>β</sub>
  bar:milestone0613
|-
  bar:milestone0614
|Q4 2026
  bar:milestone0615
|Series A
  bar:milestone0616
|$16,000,000
|
*[TRL 8] MMP<sub>δ</sub>
*Low-Rate Initial Production (LRIP)
|-
|Q2 2027
|Series B
|$32,000,000
|
*[TRL 9] MMP<sub>γ</sub>
*Proving ground testing
*Pilots, V&V product, PMF
*Full-Rate Production (FRP)
|-
|Q2 2028
|Series C
|$85,000,000
|
*[MRL 10] MMP<sub>γ</sub>
*FRP scaling (full robotic assembly)
|}
[[File:Carta Software Fundraising Cheatsheet.jpg|frameless|600x600px]]


# Software Development: Grace Hopper Team
==Development Teams (Project A and B)==
  bar:section7
===Design Development & Architecture [A]: Ada Lovelace<ref>Wikipedia, [[wikipedia:Ada_Lovelace|Ada Lovelace]]</ref> Team===
  bar:milestone0701
Concept & Product Design, Requirements, Safety-by-design, Architecture, V&V, Demo, Industrial Design
  bar:milestone0702
  bar:milestone0703
  bar:milestone0704
  bar:milestone0705
  bar:milestone0706
  bar:milestone0707
  bar:milestone0708
  bar:milestone0709
  bar:milestone0710
  bar:milestone0711
  bar:milestone0712
  bar:milestone0713
  bar:milestone0714
  bar:milestone0715
  bar:milestone0716
  bar:milestone0717
  bar:milestone0718
  bar:milestone0719
  bar:milestone0720
  bar:milestone0721
  bar:milestone0722
  bar:milestone0723
  bar:milestone0724
  bar:milestone0725
  bar:milestone0726


# Software Development: Evelyn Berezin Team
=== Mechanical Engineering [M]: Stephanie Kwolek<ref>Wikipedia, [[wikipedia:Stephanie_Kwolek|Stephanie Kwolek]]</ref> Team ===
  bar:section8
Product Design, Mechanical Engineering, Aerospace Engineering, Mechatronics, CAD Modeling, Robotic System Design, Motion Control, Engineering Simulation, Computational Fluid Dynamics (CFD), Heat Transfer / Thermal Simulation, Thermal Mapping, Structural Simulation, Multi-Physics Simulation, Control Systems Design, Aerodynamic Analysis, Thermodynamics, Prototyping, CNC Machining, Design for Assembly (DFA), Design for Manufacturing (DFM)
  bar:milestone0801
  bar:milestone0802
  bar:milestone0803
  bar:milestone0804
  bar:milestone0805
  bar:milestone0806
  bar:milestone0807
  bar:milestone0808
  bar:milestone0809
  bar:milestone0810
  bar:milestone0811


# Software Development: Barbara Askins Team
=== Aerospace Engineering [F]: Amelia Earhart Team ===
  bar:section9
Flight Systems, GNC, Control Laws, HIL/SIL Simulation, Flight Test Campaigns, Autonomous Flight Test, Mission Rehearsal, Telemetry Review, Risk Management, Flight Safety, Flight Training System, Interceptor Mission System, Target Tracking, Cargo Logistics Mission System, Route Economics, Aerial Firefighting Mission System, Dispatch Integration
  bar:milestone0901
  bar:milestone0902
  bar:milestone0903
  bar:milestone0904
  bar:milestone0905


# Networking: Margaret Hamilton Team
=== Optical Engineering [O]: Katharine Blodgett<ref>Wikipedia, [[wikipedia:Katharine_Burr_Blodgett|Katharine Burr Blodgett]]</ref> Team ===
  bar:section10
Optical Engineering, Optical System Design, Lens Design, Lens PVD Coating Design, Physical Vapor Deposition (PVD), Optomechanical Design, Photonic Systems, Laser Systems, EO/IR Payloads, Imaging Chain, Optical Stabilization, Calibration, Beam Conditioning, Pointing / Tracking Optics, Contamination Control
  bar:milestone1001
  bar:milestone1002
  bar:milestone1003
  bar:milestone1004
  bar:milestone1005


# Customer & Business Development: Barbara Liskov Team
=== Electronics Engineering [E]: Ida Hyde<ref>Wikipedia, [[wikipedia:Ida_Henrietta_Hyde|Ida Henrietta Hyde]]</ref> Team ===
  bar:section11
Electronics Engineering, PCB Design, PCB Layout, Electronic Circuit Design, Schematic Capture, High Density Interconnect (HDI), SPICE Simulation, Embedded Systems, Microcontroller Programming, Near-End / Far-End Crosstalk (NEXT/FEXT), DFM/EMI Review, SI/PI/EM, Z0 Matching, Low CTE Design, EMI/EMC, EMI/ESD, High Frequency Structure Simulation, IPC Class 3, Detailed FAB Drawing, Pick‑and‑Place files, Power Management, Thermal Management, Power Architecture, Control Electronics, Avionics, Power Distribution, Sensor Interfaces, Telemetry, Health Monitoring
  bar:milestone1101
  bar:milestone1102
  bar:milestone1103
  bar:milestone1104
  bar:milestone1105
  bar:milestone1106
  bar:milestone1107


=== Software Development [R]: Hedy Lamarr<ref>Wikipedia, [[wikipedia:Hedy_Lamarr|Hedy Lamarr]]</ref> Team ===
Radio Engineering, RF Architecture, RF Generation, SDR/TRX Chains, Secure Links, Radar Front-End Integration, Fractal Antenna, Multiband Operation Antenna, Highly Directional Antenna, AESA, Radar Detection, Passive Radar, SAR / InSAR, SIGINT and Sensing RF Chains, Spectrum Coexistence, Software Defined Radio, Networks, Remote Control, FSOC, ADS‑B, ADS-C, TIS‑B, FIS‑B, Digital Twin Integration, APS, VPS and HFD Apps


  bar:0
=== Software Development [S]: Grace Hopper<ref>Wikipedia, [[wikipedia:Grace_Hopper|Grace Hopper]]</ref> Team ===
  bar:99
Flight Software, Sensor Fusion, Autonomy Integration, Mode Logic, Fault Handling, Simulation-to-Flight Data Loop, System-level Diagnostics, Inertial Navigation System (INS), Maps, GNSS, Air Signal System (ASS), IMU, Health Monitoring, EGPWS/TAWS, TCAS/ACAS, CI/CD, OTA Update, System Integration, DevSecOps


# explanation: attribute 'barset' instead of 'bar' means consecutive data lines are automatically placed on new bar
=== Software Development [T]: Evelyn Berezin<ref>Wikipedia, [[wikipedia:Evelyn_Berezin|Evelyn Berezin]]</ref> Team ===
#              data lines are lines containing at: or from: & till: attributes
Human-Machine Interface, Workflow Automation, Safety & Cybersecurity, C2 / Aegis Integration, Workgroups, Tasks, Mission Management, Briefing / Debriefing Support, Redundant Computing, Partitioning, Fault-tolerant Flight Modes, Logging, Educational Content Generation, Knowledge Base Automation
#              'barset:break' means 'reset barcounter' = next line will be placed at first bar in barset
#              'barset:skip'  means 'increment barcounter' = skip one bar for next data line (to allow extra space
#                                                                            for text containing line break = ~)


PlotData=
=== Software Development [I]: Barbara Askins<ref>Wikipedia, [[wikipedia:Barbara_Askins|Barbara Askins]]</ref> Team ===
  align:left
AI/ML Platforms, Autonomy, AI/DL, AI/NLP, AI/ANN, EO/IR Fusion Software, Multi-Sensor Fusion, Signal Processing, Computer Vision, Computer Audition, SAR/InSAR Signature Detection, Detection / Classification / Tracking, Anomaly Detection, Onboard Inference Pipelines
  anchor:from
  fontsize:M
  width:15
  shift:(4,-6)
  textcolor:black
  color:section


  bar:title    from:start till:end text:"Project Development Roadmap" fontsize:XL anchor:middle align:center width:35 color:bg mark:(line,bg)
=== Networking [N]: Margaret Hamilton<ref>Wikipedia, [[wikipedia:Margaret_Hamilton_(software_engineer)|Margaret Hamilton]]</ref> Team ===
Expert Networking, Mentor Relations, Cloud / Edge Sync, Mesh & Relay Data Links, Secure Logging, Fleet Team Connectivity, Collaboration Infrastructure, Identity / Access Control, Artifact Management, Pitches, Updates


  bar:section1 from:start till:end text:"Milestones"
=== Customer & Business Development [C]: Barbara Liskov<ref>Wikipedia, [[wikipedia:Barbara_Liskov|Barbara Liskov]]</ref> Team ===
  bar:section2 from:start till:end text:"Design Development & Algorithm Architecture: Ada Lovelace Team"
Customer Discovery, Partner Development, Procurement Mapping, Investor Relations, GTM Management, DoD challenge/RFI work, Pilot Customer Support, Demo Planning, Market Validation, Flight Readiness Review, Compliance Documentation, Supply Chain, Vendor Management, Export Control, Cost-Down Strategy, LRIP/FRP Readiness, Production Scaling, Quality Supply Assurance
  bar:section3 from:start till:end text:"Mechanical Engineering: Stephanie Kwolek Team"
  bar:section4 from:start till:end text:"Optical Engineering: Katharine Blodgett Team"
  bar:section5 from:start till:end text:"Electronics Engineering: Ida Hyde Team"
  bar:section6 from:start till:end text:"Software Development: Hedy Lamarr Team"
  bar:section7 from:start till:end text:"Software Development: Grace Hopper Team"
  bar:section8 from:start till:end text:"Software Development: Evelyn Berezin Team"
  bar:section9 from:start till:end text:"Software Development: Barbara Askins Team"
  bar:section10 from:start till:end text:"Networking: Margaret Hamilton Team"
  bar:section11 from:start till:end text:"Customer & Business Development: Barbara Liskov Team"


# main milestones
== Roadmap in Simple Terms ==


  bar:milestone0101 width:10
=== Executive Summary ===
    textcolor:NAME at:01/01/2024 shift:(10,$dy) text:[[Public:ARHUDFM_Features_Summary|ARHUDFM Project]]
This roadmap outlines the staged development, validation, and industrialization of a dual-use aerial platform and associated systems intended for military, emergency response, logistics, and infrastructure support applications. It combines deep engineering work across aerodynamics, electromechanics, avionics, software, sensors, communications, and production automation into a coherent, de-risked program structure.
    color:TRL5 from:20/08/2024 till:01/07/2025
    color:TRL6 from:01/07/2025 till:01/10/2025
    color:TRL7 from:01/10/2025 till:01/04/2026
    color:TRL8 from:01/04/2026 till:01/07/2026
    color:TRL9 from:01/07/2026 till:01/10/2026
    color:PILOT from:01/10/2026 till:31/12/2028


# Design Development & Algorithm Architecture: Ada Lovelace Team
The plan is organized into four main phases (Concept, Development, Validation & Verification, Production) with explicit decision gates, plus several cross-cutting tracks (customer and market development, funding, team building). Each phase produces tangible technical, regulatory, and commercial outcomes, while progressively reducing technology, integration, certification, and manufacturing risks. The ultimate goal is to deliver a scalable, certifiable, and economically viable platform family that can be deployed rapidly across multiple high-impact use cases.


#CAD model update, GUI, VUI, Apps algorithms, Demos, Videos, Animations
=== Phase 1: Concept (Completed / Ongoing) ===
#Prio #1: [TRL 1-2] Research and description of the principle of operation, description of the technology application, computer-added design
==== Core Ideas & Solutions ====
#Prio #2: [TRL 3-4] Technology functionality demo, specific functionality description, GUI demo, lab experimental setup
* Investigation of problems and root causes of inefficiency in existing solutions
#Prio #3:
* Research of physical, engineering, and operational requirements
#Prio #4:
* System architecture and principles of operation
* Electromechanical, aerodynamic, and sensing elements
* Communication, control elements, and interfaces
* Modular platform architecture with hot-swappable and functional modules
* Ground infrastructure elements
* Options for military use, aerial firefighting, and logistics
* Materials and constraints enabling automated and robotic manufacturing
* Constraints and limitations for development, production, and operation
* Risk taxonomy: technology, development, safety, environmental, manufacturing, IP, economics, regulation, competition
* Economic feasibility analysis
* Historical analysis of similar technology development programs
* Failure analysis of similar and dissimilar technologies, with lessons learned on advantages and limitations
* Software architecture, execution hardware, interfaces, and mechanisms
* User case identification and development across all planned use scenarios
* Certification pathway definition (civil, military, and dual-use where applicable)
* IP landscape review and freedom-to-operate assessment


  bar:milestone0201 width:10
==== Hypotheses ====
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Engineering design
* Ability to solve the target problems with significant advantage over existing technologies and methods
    color:TRL6 from:01/07/2025 till:01/10/2025
* Feasible integration with existing systems and between subsystems
    color:TRL7 from:01/10/2025 till:01/04/2026
* Robust passive and active safety mechanisms
    color:TRL8 from:01/04/2026 till:01/07/2026
* Consistency of the concept with known physical laws and sound engineering practice
    color:TRL9 from:01/07/2026 till:01/10/2026
* Sufficient performance margins to constitute a technological breakthrough and attract investment
* Long-term effectiveness under climate, industrial, military, geopolitical, and innovation dynamics
* Operational acceptability of conditions and constraints for effective use
* System reliability in both military and civilian applications
* System reliability under adverse weather and environmental conditions
* Feasibility of developing the system within the planned timelines
* Manufacturability, operating cost, total cost of ownership, pricing, and ROI for operators
* Potential for product evolution and modernization over multiple generations
* Scalability of production and rapid adaptation to rarer or niche use cases
* Required resources, team, time, and investment can be realistically secured


  bar:milestone0202 width:10
==== Concept Validation ====
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:GUI
* Development of analytical models and digital twins
    color:TRL5 from:20/08/2024 till:01/07/2025
* Engineering calculations across key subsystems
    color:TRL6 from:01/07/2025 till:01/10/2025
* Validation of physics and engineering models through virtual simulation and known references
    color:TRL7 from:01/10/2025 till:01/04/2026
* Comparative assessments with expert input and external benchmarks
    color:TRL8 from:01/04/2026 till:01/07/2026
* Identification of vulnerabilities and critical design drivers to be addressed in development
    color:TRL9 from:01/07/2026 till:01/10/2026
* Technology readiness gate reviews (e.g., TRL 1 → 2 → .. → 9 criteria)
* Preliminary hazard analysis and early safety case framing
* Stakeholder feedback loops and incorporation of external expert reviews


  bar:milestone0203 width:10
==== Market & Customer Validation ====
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:VUI
* Early customer discovery in military, firefighting, civil protection, and logistics segments
    color:TRL5 from:20/08/2024 till:01/07/2025
* Use case prioritization based on operational pain points and willingness to adopt
    color:TRL6 from:01/07/2025 till:01/10/2025
* Non-binding commitments such as letters of intent or memoranda of understanding where feasible
    color:TRL7 from:01/10/2025 till:01/04/2026
* Competitive positioning and differentiation strategy relative to legacy platforms and emerging concepts
    color:TRL8 from:01/04/2026 till:01/07/2026
    color:TRL9 from:01/07/2026 till:01/10/2026


  bar:milestone0204 width:10
=== Phase 2: Development ===
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:SW architecture
==== Program Management & Governance ====
    color:TRL4 from:01/01/2025 till:20/04/2025
* Seed-round fundraising to expand the team and secure development resources
    color:TRL5 from:20/04/2025 till:01/07/2025
* Program charter and milestone-based governance structure
    color:TRL6 from:01/07/2025 till:01/10/2025
* Integrated master schedule (IMS) and basic earned-value tracking for major work packages
    color:TRL7 from:01/10/2025 till:01/04/2026
* Configuration management and change-control processes across hardware and software
    color:TRL8 from:01/04/2026 till:01/07/2026
* Centralized risk register with mitigation actions, owners, and review cadence
    color:TRL9 from:01/07/2026 till:01/10/2026


  bar:milestone0205 width:10
==== Development Prioritization ====
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Content creation
* Definition of MVP / MMP stages and mapping to TRL, IRL, MRL, CCRL, MCRL, CFRL, MFRL progression
    color:PROCESS from:01/10/2024 till:31/12/2028
* Release planning and prioritization of platform variants and options
* Dependency management across mechanical, electrical, software, and integration tracks
* Decision gates between readiness levels, including peer review and customer validation where possible


# Mechanical Engineering: Stephanie Kwolek Team
==== Mechanical Structures & Interfaces ====
* DFM / DFA / FEA for headset components and add-ons (software-defined antenna, SCBA integration, external aramid cover, continuous wind capture impellers, auto tourniquets, Care Under Fire set, handheld metal re-radiation radar, optional DMFC power supply, digital sight) and associated injection molds
* DFM / DFA / FEA for rigid structural elements: frame, gondola, interfaces, modules, and mounting hardware
* DFM / DFA / FEA for gas envelopes, aerostatic offloading and stabilization, and external aerodynamic shapes
* Material selection and qualification testing, including strength, fatigue, corrosion, and fire performance
* Environmental stress screening concepts (temperature, humidity, vibration, shock, dust, icing, etc.) for key assemblies


#Prio #1: [TRL 5-6] Prototype: based on 3D print, vacuum casting, vacuum unfusion
==== Electromechanical & Mechanical Systems ====
#Prio #2: [TRL 7] MVPα: vacuum casting, vacuum unfusion, injection moulding, manual assembly
* DFM / DFA / FEA for diesel engine, high-voltage alternators, and variable-frequency electric motors; auxiliary current transformers, compressors, and pumps
#Prio #3: [TRL 8] MVPβ: vacuum casting, vacuum unfusion, injection moulding, manual assembly
* DFM / DFA / FEA for hydraulic drives of propulsion system consoles and gondola transformer mechanisms
#Prio #4: [TRL 9] MMPδ: manufacturing process automation, robotic assembly, add-ons (auto tourniquets, Care Under Fire set)
* DFM / DFA / FEA for hydraulic cylinders, quick-disconnect couplings, transformers, and gear trains
#Prio #5: MMPγ: manufacturing & assembly & logistic process upgrade
* DFM / DFA / FEA for propellers, hubs, hydraulic pitch-change mechanisms, limiters, feathering systems, impellers, feedback systems, and hybrid cooling arrangements


  bar:milestone0301 width:10
==== Sensor Systems ====
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:3D print
* DFM / DFA / FEA for headset sensors
    color:TRL5 from:20/08/2024 till:01/07/2025
* DFM / DFA / FEA for flight and navigation sensors: inertial navigation system (INS), global navigation satellite system (GNSS), barometric altimeter, air data system, true and magnetic heading, IMU (gyroscopes and accelerometers), additional attitude sensors (roll / pitch / yaw), payload sensing
    color:TRL6 from:01/07/2025 till:01/10/2025
* DFM / DFA / FEA for powerplant sensors: air, oil, and fuel pressure sensors; fuel flow meters; temperature sensors for oil and coolant circuits; engine speed sensors; shaft and equipment vibration; combustion and exhaust pressure sensors
    color:TRL7 from:01/10/2025 till:01/04/2026
* DFM / DFA / FEA for gas envelope and gas management sensors: pressure, flow, and temperature sensors
* DFM / DFA / FEA for environmental and aerodynamic sensors: air pressure and temperature, angle of attack (alpha sensors, Pitot-static), sideslip angle (beta sensors, Pitot-static), icing, humidity, and precipitation
* DFM / DFA / FEA for landing gear and landing systems sensors: gear position sensors, brake system pressure sensors, brake wear sensors, landing load sensors
* DFM / DFA / FEA for fuel system sensors: fuel level sensors, fuel pressure and temperature sensors, fuel flow sensors
* DFM / DFA / FEA for avionics and control sensors: thrust vector control position sensors (engine console tilt and extension, impeller angle), fan position, linear speed and angular acceleration sensors, door and hatch position sensors
* DFM / DFA / FEA for safety and warning sensors: radar altimeter, terrain awareness and warning systems (EGPWS / TAWS), collision avoidance systems (TCAS / ACAS), obstacle detection, fire and smoke detectors
* DFM / DFA / FEA for external sensors: onboard radar (weather radar, severe weather modes, surveillance radar), airborne LIDAR, electro-optical and infrared stereo cameras (EO / IR), remote sensing and reconnaissance sensors (spectrometers, hyper- and multispectral cameras)
* DFM / DFA / FEA for auxiliary control and navigation sensors: ultrasonic altitude sensors, optical flow sensors (GNSS-denied environments), magnetometers and magnetic field compensators, electrostatic field sensors for gas chambers
* DFM / DFA / FEA for power and motor control sensors: speed, current, voltage, frequency, temperature, and vibration monitoring


  bar:milestone0302 width:10
==== Communication Systems ====
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Vacuum casting
* DFM / DFA / FEA for Rx / Tx radio communications, telemetry, flight plan uplink/downlink, and aircraft health reporting in HF, DL‑VHF / VHF, UHF, C‑band, 5G FR1 / FR2 / FR3, LTE, NTIA MSS SatCom, Ku / Ka‑band
    color:TRL7 from:01/10/2025 till:01/04/2026
* DFM / DFA / FEA for ACARS‑SAT and Link‑2000+
    color:TRL8 from:01/04/2026 till:01/07/2026
* DFM / DFA / FEA for tactical data links (Link‑16, Link‑22, TDL) and radio-relay systems (RTX)
    color:TRL9 from:01/07/2026 till:01/10/2026
* DFM / DFA / FEA for signal triplication and frequency-hopping communications
* DFM / DFA / FEA for free-space optical communication channels (FSOC)
* DFM / DFA / FEA for subscriber signal tracking and digital beam steering of highly directional antennas
* DFM / DFA / FEA for dynamic encryption systems
* DFM / DFA / FEA for Mode‑S, ADS‑B, and ADS‑C
* DFM / DFA / FEA for TIS‑B and FIS‑B (Traffic / Flight Information Service‑Broadcast)


  bar:milestone0303 width:10
==== Control Systems ====
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Injection moulding
* Software bundles for tactical situational awareness (see separate description)
    color:TRL7 from:01/10/2025 till:01/04/2026
* Flight Control System (FCS):
    color:TRL8 from:01/04/2026 till:01/07/2026
** eVTOL dynamics modeling and parameterization
    color:TRL9 from:01/07/2026 till:01/10/2026
** Flight control law design (FCL)
** Powerplant and thrust vector control (TVC) algorithms
** Control modes: Manual, Assisted, Autopilot, Full Autonomy
** Protected and limited authority control modes
* Guidance, Navigation & Control (GNC):
** Navigation core development (INS / GNSS / air-data fusion, optical flow, SAR / InSAR signatures)
** Navigation algorithms for eVTOL in urban, low-altitude, and complex terrain environments
** ADS‑B, TCAS, EGNSS / GBAS integration
** Mission layer and route-planning algorithms
* Health Monitoring & Self-Test:
** Telemetry acquisition and processing software
** Built‑In Test (BIT / BITE) architecture
** Health Monitoring System (HMS)
** Degradation modes, redundancy management, and fault logging (FDR-like functionality)
* Safety & Cybersecurity:
** Software development and verification according to DO‑178C / DO‑331 and ARP‑4754 / 4761
** Fault-tolerant architecture (redundant computing, partitioning, safety-critical separation)
** Degraded flight modes (engine-out, loss-of-thrust, loss-of-control, safe landing / “minimum risk” modes)
** Integration of safety systems (collision avoidance, EGPWS, separation management)
** Cybersecurity for airborne and ground software
* Common lifecycle and infrastructure tasks:
** Software architecture and module responsibility split (low-level flight control, GNC core, mission management, autopilot, HMI / SDK, BMS, security, logging)
** Model-based development (e.g., SCADE, UML, Simulink) for control laws, autopilot, navigation, and MIL / HIL testing
** DevSecOps and CI / CD with automatic testing, verification, configuration management, and OTA updates
** Ground tools and infrastructure for debugging and testing (eVTOL flight simulators, HIL benches, debug and monitoring GUIs, syntactic and functional test tools)
* Operator Training & Simulation:
** High-fidelity simulators for pilots and operators
** Scenario-based training for military, firefighting, and logistics missions


  bar:milestone0304 width:10
==== Cross-Disciplinary Engineering for Options (High-Level) ====
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Surface finishing
The following option packages are developed in parallel as modular capabilities:
    color:TRL7 from:01/10/2025 till:01/04/2026
    color:TRL8 from:01/04/2026 till:01/07/2026
    color:TRL9 from:01/07/2026 till:01/10/2026


  bar:milestone0305 width:10
* A‑CSG: EMALS STOL and eVTOL catapults, arresting gate, safety and handling systems
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Manual assembly
* AEW&C radar (AESA / PESA, multi-band HF / VHF / UHF / S / L with SAR / InSAR, APS, VPS, HFD applications)
    color:TRL7 from:01/10/2025 till:01/04/2026
* HEL system (high-energy pulsed laser with OPCPA, large-aperture optics, adaptive optics and beam control)
    color:TRL8 from:01/04/2026 till:01/07/2026
* HPM system (high-power microwave with phased array, pulsed power generation, beam steering and targeting)
    color:TRL9 from:01/07/2026 till:01/10/2026
* Aerial firefighting multi-role package (monitoring, suppression, evacuation support, flood and earthquake response, emergency logistics, agricultural and drought mitigation scenarios)
* Cargo and heavy-lift logistics package (liquid and container cargo, multimodal operations, heavy and oversized payloads, including rigid vertical coupling up to 720 k lb)
* Drone Hunter interceptor package (kinetic and non-kinetic counter‑UAS, including “Flying Shotgun” variant)


  bar:milestone0306 width:10
Each option follows the same pattern: concept, detailed design, DFM / DFA / FEA, integration, test, and certification or qualification as applicable.
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Test tooling
    color:TRL7 from:01/10/2025 till:01/04/2026
    color:TRL8 from:01/04/2026 till:01/07/2026
    color:TRL9 from:01/07/2026 till:01/10/2026


# Optical Engineering: Katharine Blodgett Team
==== Integration & System Testing ====
* Hardware‑in‑the‑Loop (HIL) rigs for flight control, propulsion, power, and avionics
* Software‑in‑the‑Loop (SIL) and continuous integration pipelines for embedded software
* Integrated ground testing for propulsion, avionics, communications, and payloads
* Environmental testing (climatic chambers, vibration, shock, dust, icing)
* EMI / EMC compliance testing and mitigation design loops


#Light guide, Beam splitting prisms, Dichroic mirror, Optical coatings, Fading pads
==== Supplier & Partner Development ====
#Prio #1: [TRL 5-6] Prototype: optical scheme, light guide, dichroic mirror, fading pads
* Identification and qualification of suppliers for critical components and materials
#Prio #2: [TRL 7] MVPα: beam splitting prisms for 3 cam sensors, optical coatings
* Co‑development partnerships for sensors, propulsion, materials, and software where appropriate
#Prio #3: [TRL 8] MVPβ:
* Supply chain risk analysis and dual‑sourcing strategies
#Prio #4: [TRL 9] MMPδ:
* Quality assurance agreements and incoming inspection procedures
#Prio #5: MMPγ:


  bar:milestone0401 width:10
==== Regulatory Engagement ====
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Lens system
* Pre‑application meetings with civil aviation authorities (e.g., FAA, EASA) where in scope
    color:TRL5 from:20/08/2024 till:01/07/2025
* Clarification of certification basis and special conditions for novel concepts
    color:TRL6 from:01/07/2025 till:01/10/2025
* Incremental submission of data packages (design, safety assessments, test results)
    color:TRL7 from:01/10/2025 till:01/04/2026
* Military airworthiness coordination for defense variants
    color:TRL8 from:01/04/2026 till:01/07/2026
    color:TRL9 from:01/07/2026 till:01/10/2026


  bar:milestone0402 width:10
==== Intellectual Property Strategy ====
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Optical coatings
* Patent filings for core inventions and platform-level innovations
    color:TRL5 from:01/03/2025 till:01/07/2025
* Identification and protection of trade secrets and know‑how
    color:TRL6 from:01/07/2025 till:01/10/2025
* Ongoing freedom‑to‑operate monitoring
    color:TRL7 from:01/10/2025 till:01/04/2026
* Licensing strategy for dual-use components and subsystems
    color:TRL8 from:01/04/2026 till:01/07/2026
    color:TRL9 from:01/07/2026 till:01/10/2026


  bar:milestone0403 width:10
=== Phase 3: Validation & Verification ===
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Fading pads
==== V&V Program ====
    color:TRL5 from:01/03/2025 till:01/07/2025
* System-level test and evaluation master plan
    color:TRL6 from:01/07/2025 till:01/10/2025
* Digital twin testing and correlation against ground and flight data
    color:TRL7 from:01/10/2025 till:01/04/2026
* Physical prototype testing at multiple scales (1:20, 1:10, 1:5, 1:2, 1:1)
    color:TRL8 from:01/04/2026 till:01/07/2026
* Ground-based flight simulation and iron-bird testing
    color:TRL9 from:01/07/2026 till:01/10/2026
* Incremental flight test campaign with progressive envelope expansion
* Mission-representative flight testing for key use cases (military, firefighting, logistics)
* Certification testing and demonstration of compliance with applicable standards
* Reliability demonstration testing and statistical confidence build-up
* Operational data collection in pilot deployments
* Customer acceptance testing and operational evaluation
* Safety case consolidation and submission to authorities


# Electronics Engineering: Ida Hyde Team
==== Pilot Production Preparation ====
* Design and build of pre‑production representative units (LRIP prototypes)
* First Article Inspection (FAI) and conformity assessment
* Manufacturing process refinement based on pilot builds
* Supplier production readiness reviews and process capability checks
* Validation of tooling, fixtures, and test equipment


#Schematics and PCBs for motherboard, projector, IFF Transponder, SDR, SDRS, PCSR, Digital sight
=== Phase 4: Production ===
#Prio #1: [TRL 5-6] Prototype: based on Raspberry Pi 4B, Texas Instruments DLPDLCR2000EVM
==== Business Process & Production System Design ====
#Prio #2: [TRL 7] MVPα: motherboard chipset Intel Z790, CPU Intel Core i7-13850HX, DLP PCB, SDRS PCB, IFF PCB
* End-to-end business process mapping with focus on automation and robotization of assembly and production
#Prio #3: [TRL 8] MVPβ: SDR2 PCB, add-on (software defined antenna, optional battery, continuous wind capture impellers)
* Design of internal and external logistics chains, including mitigation of forced downtime
#Prio #4: [TRL 9] MMPδ: add-on (auto tourniquets, Care Under Fire set, handheld metal re-radiation radar)
* Mapping of machines and mechanisms with adaptability for throughput changes, retooling, and maintenance windows
#Prio #5: MMPγ: add-on (digital sight)
* Design of auxiliary and support systems with adaptability to load and product mix changes
* Facility layout design and requirements with reconfiguration and scaling in mind
* Digital twins of all production processes and virtual stress tests (volume, mix, disruptions)
* Lean manufacturing principles and continuous improvement culture (Kaizen, 5S, etc.)


  bar:milestone0501 width:10
==== Production Infrastructure ====
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Prototype
* List and specification of machines and equipment, including automatic and robotic systems
    color:TRL5 from:20/08/2024 till:01/07/2025
* PLC programming requirements for automation and robotized production lines
    color:TRL6 from:01/07/2025 till:01/10/2025
* IoT device development requirements for comprehensive telemetry, synchronization, and control of the production complex
* List of laboratory and testing processes for quality control and associated equipment
* List of material resources and qualified suppliers
* List of human resource requirements, including qualification profiles and training plans
* Requirements for production certification, including safety, environmental protection, and energy efficiency
* Workplace safety, ergonomics, and human–machine interface standards


  bar:milestone0502 width:10
==== Low-Rate Initial Production (LRIP) ====
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:MVP
* Initial production run (e.g., tens of units per year depending on variant)
    color:TRL6 from:01/07/2025 till:01/10/2025
* Cost and schedule performance tracking and feedback into design and process optimization
    color:TRL7 from:01/10/2025 till:01/04/2026
* Design-for-manufacturing and value-engineering loops based on real production data
* Supplier performance monitoring and refinement of contracts and SLAs
* Certification authority oversight and demonstration of production conformity


  bar:milestone0503 width:10
==== Full-Rate Production (FRP) ====
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:MMP
* Production ramp-up plan and capacity milestones
    color:TRL8 from:01/04/2026 till:01/07/2026
* Triggers for capacity expansion and associated CAPEX planning
    color:TRL9 from:01/07/2026 till:01/10/2026
* Multi-site manufacturing strategy where justified by demand and risk profile
* Export control and compliance (e.g., ITAR / EAR and national regimes) for defense variants


  bar:milestone0504 width:10
==== After-Sales & Support ====
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Add-on set 1
* Maintenance, repair, and overhaul (MRO) infrastructure and processes
    color:TRL5 from:09/03/2026 till:22/03/2026
* Spare parts strategy, inventory, and distribution network
    color:TRL6 from:23/03/2026 till:05/04/2026
* Technical support and training programs for operators and maintainers
    color:TRL7 from:06/04/2026 till:19/04/2026
* Field service and rapid-response capability for critical operators (military, firefighting, critical infrastructure)
    color:TRL8 from:20/04/2026 till:03/05/2026
* Product lifecycle management and obsolescence planning
    color:TRL9 from:29/06/2026 till:05/07/2026
* Upgrade paths and technology refresh strategy for deployed fleets


  bar:milestone0505 width:10
==== Continuous Improvement ====
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Add-on set 2
* Monitoring of production KPIs and Overall Equipment Effectiveness (OEE)
    color:TRL5 from:04/05/2026 till:17/05/2026
* Periodic supply chain performance reviews and resilience assessments
    color:TRL6 from:18/05/2026 till:31/05/2026
* Structured customer feedback loops feeding into product and process roadmaps
    color:TRL7 from:01/06/2026 till:14/06/2026
* Cost reduction initiatives (design-to-cost, design-to-value, process optimization)
    color:TRL8 from:15/06/2026 till:28/06/2026
    color:TRL9 from:06/07/2026 till:12/07/2026


# Software Development: Hedy Lamarr Team
=== Cross-Cutting Tracks (Across All Phases) ===
==== Customer & Market Development ====
* Sales pipeline development and key account management
* Demonstrator and evaluation unit deployments with early adopters
* Co‑creation of operational concepts with lead customers
* Contract negotiation support, including leasing and service-based models
* Market expansion across geographies and vertical segments
* Brand building, technical thought leadership, and ecosystem engagement


#SDR, SDR Scan, RDF, Radar Detection, IFF, Networks, Remote control
==== Funding & Investor Relations ====
#Prio #1: IFF, NET, RDF, RFDD, RWRC, SDRS
* Planning of investment rounds (Seed, Series A, B, C) aligned with technical and commercial milestones
#Prio #2: P2P, RPAC, SDR2
* Financial modeling of CAPEX, OPEX, and unit economics for different deployment models
#Prio #3: ANTC, EODD, PCSR
* Cap table and governance structure management
#Prio #4: APAR, FTRC, RBRC, UVRC
* Investor reporting, board updates, and data room maintenance
#Prio #5:
* Exploration of grants and non-dilutive funding (e.g., defense innovation programs, EU frameworks)


  bar:milestone0601 width:10
==== Team Building & Organization ====
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:IFF
* Roadmap for key hires in engineering, operations, certification, business development, and support
    color:TRL5 from:11/05/2025 till:24/05/2025
* Evolution of organizational structure as program complexity grows
    color:TRL6 from:25/05/2025 till:09/06/2025
* Compensation and equity planning to attract and retain top talent
    color:TRL7 from:02/09/2025 till:15/09/2025
* Culture and values development with emphasis on safety, ethics, and mission focus
    color:TRL8 from:09/06/2026 till:22/06/2026
    color:TRL9 from:20/10/2026 till:26/10/2026


  bar:milestone0602 width:10
=== Critical Path ===
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:NET
The critical path consists of tightly coupled workstreams whose delays directly impact time to deployment and revenue:
    color:TRL5 from:10/06/2025 till:23/06/2025
    color:TRL6 from:24/06/2025 till:06/07/2025
    color:TRL7 from:16/09/2025 till:29/09/2025
    color:TRL8 from:23/06/2026 till:05/07/2026
    color:TRL9 from:27/10/2026 till:02/11/2026


  bar:milestone0603 width:10
* Completion and validation of core physical and system models (aerodynamics, structures, propulsion, power, GNC) sufficient to freeze the baseline architecture.
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:RDF
* Development and verification of flight-critical software and control laws (FCS, GNC, safety & redundancy) to a maturity level suitable for experimental flight.
    color:TRL5 from:07/07/2025 till:20/07/2025
* Integration of propulsion, power, and flight control into a stable, testable iron-bird and subsequent flying prototypes.
    color:TRL6 from:21/07/2025 till:04/08/2025
* Early and continuous engagement with certification authorities to agree on the certification basis and acceptable means of compliance for a novel platform.
    color:TRL7 from:30/09/2025 till:13/10/2025
* Execution of the incremental flight test campaign required to demonstrate safety, performance, and mission effectiveness in representative environments.
    color:TRL8 from:06/07/2026 till:19/07/2026
* Establishment of a production-ready supply chain for critical components (propulsion, energy storage, structural elements, avionics, sensors) with sufficient quality and capacity.
    color:TRL9 from:03/11/2026 till:09/11/2026


  bar:milestone0604 width:10
All other activities (options, extended mission packages, advanced payloads) are scheduled to avoid blocking this critical path and can be shifted or parallelized without endangering initial fielding.
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:RFDD
    color:TRL5 from:05/08/2025 till:18/08/2025
    color:TRL6 from:19/08/2025 till:01/09/2025
    color:TRL7 from:14/10/2025 till:27/10/2025
    color:TRL8 from:20/07/2026 till:03/08/2026
    color:TRL9 from:10/11/2026 till:16/11/2026


  bar:milestone0605 width:10
=== Capital Efficiency ===
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:RWRC
The roadmap is designed to maximize information gained per unit of capital and to concentrate resources on de‑risking the core platform before scaling spend:
    color:TRL5 from:28/10/2025 till:10/11/2025
    color:TRL6 from:11/11/2025 till:24/11/2025
    color:TRL7 from:01/03/2026 till:14/03/2026
    color:TRL8 from:04/08/2026 till:17/08/2026
    color:TRL9 from:17/11/2026 till:23/11/2026


  bar:milestone0606 width:10
* Early phases emphasize modeling, simulation, and digital twins to eliminate infeasible concepts before committing to expensive tooling and full-scale hardware.
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:SDRS
* Scaled prototypes (1:20, 1:10, 1:5, 1:2) are used to validate key physical assumptions and control strategies at lower cost and lower risk than immediate full-scale builds.
    color:TRL5 from:25/11/2025 till:07/12/2025
* Option packages (AEW&C, HEL, HPM, Drone Hunter, advanced firefighting, heavy cargo) are treated as modular overlays that can follow the core platform with staged investment and customer co‑funding.
    color:TRL6 from:08/12/2025 till:21/12/2025
* Supplier partnerships and COTS components are leveraged wherever possible without compromising safety or mission performance, reducing NRE and lead time.
    color:TRL7 from:15/03/2026 till:28/03/2026
* LRIP is used to drive down manufacturing risk and unit cost before committing to FRP tooling and capacity, with clear go / no‑go gates tied to technical and commercial traction.
    color:TRL8 from:18/08/2026 till:31/08/2026
    color:TRL9 from:24/11/2026 till:30/11/2026


  bar:milestone0607 width:10
Non-dilutive funding sources (defense innovation contracts, grants, joint development programs) are pursued to co‑finance the most capital-intensive technology blocks.
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:P2P
This combination of staged technical de‑risking, modular options, and progressive industrialization is intended to keep the program financeable for private investors while still targeting a fundamentally hard, infrastructure-level problem.
    color:TRL5 from:22/12/2025 till:05/01/2026
    color:TRL6 from:06/01/2026 till:19/01/2026
    color:TRL7 from:12/04/2026 till:25/04/2026
    color:TRL8 from:01/09/2026 till:14/09/2026
    color:TRL9 from:30/11/2026 till:06/12/2026


  bar:milestone0608 width:10
== Appendix: Cross-Disciplinary Engineering for Options (Low-Level) ==
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:RPAC
This appendix describes the low‑level engineering work required for the key option packages. Each option follows the same pattern: detailed concept definition, low‑level design, DFM / DFA / FEA, integration into the base platform, V&V, and (where applicable) certification or qualification.
    color:TRL5 from:20/01/2026 till:02/02/2026
    color:TRL6 from:03/02/2026 till:16/02/2026
    color:TRL7 from:17/02/2026 till:28/02/2026
    color:TRL8 from:15/09/2026 till:28/09/2026
    color:TRL9 from:07/12/2026 till:13/12/2026


  bar:milestone0609 width:10
=== A‑CSG: EMALS STOL and eVTOL Catapults, Arresting Systems, Onboard Safety and Handling ===
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:SDR2
==== Structural, Mechatronic, and Interface Elements ====
    color:TRL5 from:26/04/2026 till:08/05/2026
* Design of structural beams, rails, and support frames for catapult and arresting systems, including static and dynamic load analysis for launch and recovery cycles.
    color:TRL6 from:09/05/2026 till:22/05/2026
* Mechanical interface design between catapult carriage and eVTOL / STOL UAS (hardpoints, locking mechanisms, fail‑safe release systems).
    color:TRL7 from:23/05/2026 till:08/06/2026
* Design of shock absorbers, energy absorbers, and damping systems for carriage and arresting components.
    color:TRL8 from:29/09/2026 till:12/10/2026
* Structural integration with decks, runways, or dedicated launch platforms, including foundations and vibration isolation.
    color:TRL9 from:14/12/2026 till:20/12/2026


  bar:milestone0610 width:10
==== Sensors for Control and Monitoring ====
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:ANTC
* Position sensors for carriage and launch rails (linear encoders, travel limit switches, proximity sensors).
    color:TRL5 from:21/12/2026 till:04/01/2027
* Speed and acceleration sensors for carriage and payload (IMUs, high‑rate encoders, accelerometers).
    color:TRL6 from:05/01/2027 till:18/01/2027
* Position and tension sensors for arresting ropes, braking systems, and energy absorbers.
    color:TRL7 from:19/01/2027 till:01/02/2027
* Pressure and flow sensors for hydraulic subsystems.
    color:TRL8 from:02/02/2027 till:15/02/2027
* Health monitoring sensors for structural fatigue, vibration, and temperature in critical nodes.
    color:TRL9 from:25/04/2027 till:30/04/2027


  bar:milestone0611 width:10
==== Linear Electromagnetic Drive Components ====
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:EODD
* Design of linear electromagnetic motor modules (stator segments, mover/armature) for EMALS‑type launch systems.
    color:TRL5 from:16/02/2027 till:28/02/2027
* Electromagnetic modeling of force profiles, efficiency, and thermal behavior under repeated launch cycles.
    color:TRL6 from:28/02/2027 till:13/03/2027
* Design of power electronics (inverters, converters) for controlled current and voltage profiles in linear drive modules.
    color:TRL7 from:14/03/2027 till:27/03/2027
* Cooling systems for linear drive modules (liquid or forced‑air, manifold design, temperature sensors).
    color:TRL8 from:11/04/2027 till:24/04/2027
* Modularization of linear drive segments for maintainability, redundancy, and flexible launch stroke length.
    color:TRL9 from:01/05/2027 till:07/05/2027


  bar:milestone0612 width:10
==== Hydraulic Control Elements ====
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:PCSR
* Hydraulic power units (pumps, accumulators, valves) for arresting gear, locking mechanisms, and adjustable structures.
    color:TRL5 from:08/05/2027 till:21/05/2027
* Hydraulic cylinders, servo‑valves, and manifolds for moving gates, safety barriers, and positioning systems.
    color:TRL6 from:22/05/2027 till:07/06/2027
* DFM / DFA / FEA of hydraulic components for repeated high‑load cycles and exposure to harsh environments.
    color:TRL7 from:08/06/2027 till:21/06/2027
    color:TRL8 from:22/06/2027 till:04/07/2027
    color:TRL9 from:31/08/2027 till:06/09/2027


  bar:milestone0613 width:10
==== Control Software Modules ====
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:APAR
* Pre‑launch inspection and readiness software (self‑test of EMALS, hydraulics, sensors, and safety interlocks).
    color:TRL5 from:05/07/2027 till:18/07/2027
* Launch control software: trajectory planning for acceleration and deceleration profiles; closed‑loop control of linear drive and carriage position.
    color:TRL6 from:19/07/2027 till:02/08/2027
* Position control and synchronization of moving parts (carriage, clamps, arresting gates, ropes).
    color:TRL7 from:03/08/2027 till:16/08/2027
* Real‑time monitoring of tension, speed, acceleration, and position; dynamic adjustment for wind, load mass, and deck motion.
    color:TRL8 from:17/08/2027 till:30/08/2027
* Safety logic and emergency functions: abort sequences, controlled deceleration in case of power loss, fault isolation, and safe fallback states.
    color:TRL9 from:07/09/2027 till:13/09/2027


  bar:milestone0614 width:10
=== AEW&C: Radar, APS, VPS, and HFD Applications ===
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:FTRC
==== Antenna and AESA / PESA Module Design ====
    color:TRL5 from:14/09/2027 till:27/09/2027
* AESA panel design with element‑level T/R modules based on multi‑turn spiral or fractal antennas with wideband characteristics.
    color:TRL6 from:18/09/2027 till:11/10/2027
* Integration of controllable phase shifters, GaN HFET power amplifiers, low‑noise amplifiers, and attenuators into compact T/R modules.
    color:TRL7 from:12/10/2027 till:25/10/2027
* DFM / DFA of RF front‑ends for high power density, thermal management, and environmental robustness.
    color:TRL8 from:26/10/2027 till:08/11/2027
* Digital Beamforming (DBF) modules for element‑level and subarray‑level beamforming, supporting multi‑beam and 4D scanning.
    color:TRL9 from:04/01/2028 till:10/01/2028


  bar:milestone0615 width:10
==== RF and Microwave Hardware ====
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:RBRC
* T/R module design: power amplifier (PA‑GaN), LNA, phase shifter, attenuator, Tx/Rx switch, and protection circuitry.
    color:TRL5 from:09/11/2027 till:22/11/2027
* RF distribution network: corporate feed structures, power dividers/combiners, directional couplers, duplexers, and band‑select filters.
    color:TRL6 from:23/11/2027 till:05/12/2027
* Local oscillator (LO) and frequency synthesizer chains for stable, low‑phase‑noise references across HF/VHF/UHF/S/L‑bands.
    color:TRL7 from:06/12/2027 till:19/12/2027
* Waveguide and coaxial transitions, thermal design for high‑power RF paths, and EM shielding for platform integration.
    color:TRL8 from:20/12/2027 till:03/01/2028
    color:TRL9 from:11/01/2028 till:17/01/2028


  bar:milestone0616 width:10
==== Computing Stack and FPGA / SoC ====
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:UVRC
* MIMO front‑end design with integrated Tx, high‑speed ADC, DSP, and MCU / SoC on a single board or module.
    color:TRL5 from:18/01/2028 till:31/01/2028
* Selection and integration of high‑speed ADC / DAC components for IF/RF sampling.
    color:TRL6 from:01/02/2028 till:14/02/2028
* Implementation of NPU / GPU accelerators for high‑throughput signal processing and real‑time tracking.
    color:TRL7 from:15/02/2028 till:28/02/2028
* FPGA / SoC firmware for timing distribution, beamforming, channel calibration, and deterministic low‑latency control.
    color:TRL8 from:29/02/2028 till:12/03/2028
    color:TRL9 from:13/03/2028 till:19/03/2028


# Software Development: Grace Hopper Team
==== Core Radar Software ====
* Waveform generator: support for pulsed and phase‑coded signals, LFM chirps for SAR / InSAR, pulse‑Doppler and high‑definition radar modes.
* Range and Doppler processing: matched filtering, FFT in range and Doppler, Doppler filtering banks, CFAR detection.
* Clutter suppression and compensation for atmospheric and multipath effects.
* Beamforming software: element‑level and array‑level DBF for 4D scanning, multi‑beam operation, and adaptive beam shaping.
* Track‑While‑Scan (TWS) and multi‑target tracking (MTT) using Kalman‑type and PHD filters, including support for slow, small, and group targets.


#System Integration, DevOps, Maps, VBS, Sensors
==== SAR / InSAR Processing ====
#Prio #1: CAM, DISP, FPAD, GNSS, HT, INP, MMC, PTTH, SPOT, SRV, STT, SYS, VOVR
* SAR image formation algorithms (Range‑Doppler, Omega‑K, Back‑Projection) for different motion and geometry regimes.
#Prio #2: ACC, ADM, FILE, DVC, MAP, NAV, PATH, REC, PLAY, SEC, STM
* InSAR processing modules for phase difference extraction between multiple SAR passes or channels.
#Prio #3: TRSL
* Error compensation and calibration for motion errors, platform dynamics, atmospheric phase noise, and geometric distortions.
#Prio #4: VBS
#Prio #5:


  bar:milestone0701 width:10
==== APS, VPS, and HFD Modules ====
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:CAM
* APS: airspace and air traffic surveillance, UTM / U‑space integration, and conflict detection for dense airspace.
    color:TRL5 from:11/05/2025 till:24/05/2025
* VPS: vehicle protection and SHORAD / C‑UAS processing, including threat classification and engagement support.
    color:TRL6 from:25/05/2025 till:09/06/2025
* HFD (Hybrid / Fusion & Decision‑Support): fusion of radar, EO/IR, and other sensors; threat evaluation; and decision support logic.
    color:TRL7 from:02/09/2025 till:15/09/2025
    color:TRL8 from:09/06/2026 till:22/06/2026
    color:TRL9 from:20/10/2026 till:26/10/2026


  bar:milestone0702 width:10
==== Monitoring, BITE, and Health Management ====
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:DISP
* Built‑In Test and calibration routines for antenna arrays and T/R modules.
    color:TRL5 from:11/05/2025 till:24/05/2025
* Continuous self‑calibration for gain/phase drift and RF front‑end health.
    color:TRL6 from:25/05/2025 till:09/06/2025
* Telemetry and logging of key radar performance and health parameters.
    color:TRL7 from:02/09/2025 till:15/09/2025
    color:TRL8 from:09/06/2026 till:22/06/2026
    color:TRL9 from:20/10/2026 till:26/10/2026


  bar:milestone0703 width:10
==== Integration and Interfaces ====
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:FPAD
* Interfaces to combat management systems (e.g., Aegis‑type architectures), C2 networks, and UTM systems.
    color:TRL5 from:10/06/2025 till:23/06/2025
* APIs and data formats for integrating external sensors (EO/IR, navigation, LIDAR, meteorological sensors).
    color:TRL6 from:24/06/2025 till:06/07/2025
* Synchronization with navigation systems for precise georeferencing and track handover.
    color:TRL7 from:16/09/2025 till:29/09/2025
    color:TRL8 from:23/06/2026 till:05/07/2026
    color:TRL9 from:27/10/2026 till:02/11/2026


  bar:milestone0704 width:10
=== HEL System: High-Energy Laser (Ti:Sapphire / Nd:YAG + OPCPA) ===
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:GNSS
==== Seed and Front-End ====
    color:TRL5 from:10/06/2025 till:23/06/2025
* Design of seed laser oscillator with chirped pulse output optimized for OPCPA injection.
    color:TRL6 from:24/06/2025 till:06/07/2025
* Stabilization of wavelength, pulse duration, and repetition rate for consistent amplification.
    color:TRL7 from:16/09/2025 till:29/09/2025
* Front‑end pulse shaping and pre‑compensation for nonlinear propagation effects.
    color:TRL8 from:23/06/2026 till:05/07/2026
    color:TRL9 from:27/10/2026 till:02/11/2026


  bar:milestone0705 width:10
==== Stretcher Block ====
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:HT
* Grating‑based pulse stretcher design using diffraction gratings and optical fiber or free‑space delay lines.
    color:TRL5 from:07/07/2025 till:20/07/2025
* Control of chirp, spectral bandwidth, and temporal stretching ratio.
    color:TRL6 from:21/07/2025 till:04/08/2025
* Thermal stability and alignment mechanisms for long‑term operation.
    color:TRL7 from:30/09/2025 till:13/10/2025
    color:TRL8 from:06/07/2026 till:19/07/2026
    color:TRL9 from:03/11/2026 till:09/11/2026


  bar:milestone0706 width:10
==== Pump Laser Chain ====
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:INP
* Nd:YAG pump stages with appropriate cavity designs for high‑energy pulsed operation.
    color:TRL5 from:07/07/2025 till:20/07/2025
* Pump lamp (e.g., xenon flashlamp) banks, power conditioning, and lifetime management.
    color:TRL6 from:21/07/2025 till:04/08/2025
* Cooling systems for Nd:YAG rods, pump lamps, and associated optics.
    color:TRL7 from:30/09/2025 till:13/10/2025
    color:TRL8 from:06/07/2026 till:19/07/2026
    color:TRL9 from:03/11/2026 till:09/11/2026


  bar:milestone0707 width:10
==== OPCPA Amplification Stage ====
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:MMC
* Optical Parametric Chirped Pulse Amplification (OPCPA) chain using nonlinear crystals (BBO, LBO, KDP and derivatives).
    color:TRL5 from:05/08/2025 till:18/08/2025
* Phase‑matching design for target wavelength, gain, and bandwidth.
    color:TRL6 from:19/08/2025 till:01/09/2025
* Management of walk‑off, thermal loading, and crystal damage thresholds.
    color:TRL7 from:14/10/2025 till:27/10/2025
* Pump–signal synchronization, timing jitter control, and optical isolation.
    color:TRL8 from:20/07/2026 till:03/08/2026
    color:TRL9 from:10/11/2026 till:16/11/2026


  bar:milestone0708 width:10
==== Ti:Sapphire Amplifier Chain ====
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:PTTH
* Ti:sapphire amplifier stages (single‑pass or multi‑pass) for further pulse energy scaling.
    color:TRL5 from:05/08/2025 till:18/08/2025
* Crystal mounting, cooling (including water or cryogenic options), and stress management.
    color:TRL6 from:19/08/2025 till:01/09/2025
* Pump coupling optics and spatial beam shaping for uniform gain.
    color:TRL7 from:14/10/2025 till:27/10/2025
    color:TRL8 from:20/07/2026 till:03/08/2026
    color:TRL9 from:10/11/2026 till:16/11/2026


  bar:milestone0709 width:10
==== Compressor Block ====
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:SPOT
* Large‑aperture reflective grating compressor design for recompression to femtosecond or picosecond durations.
    color:TRL5 from:28/10/2025 till:10/11/2025
* Control of dispersion, residual chirp, and higher‑order phase terms.
    color:TRL6 from:11/11/2025 till:24/11/2025
* Mechanical stability and alignment control for high‑energy pulses.
    color:TRL7 from:01/03/2026 till:14/03/2026
    color:TRL8 from:04/08/2026 till:17/08/2026
    color:TRL9 from:17/11/2026 till:23/11/2026


  bar:milestone0710 width:10
==== Beam Delivery and Large-Aperture Optics ====
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:SRV
* Large‑aperture beam delivery system (e.g., ~2750 mm effective aperture) with adjustable focus from ~100 m to ~100 km.
    color:TRL5 from:28/10/2025 till:10/11/2025
* Mirror and aspheric lens subsystem with aberration compensation.
    color:TRL6 from:11/11/2025 till:24/11/2025
* Configurable optical trains (Mersenne‑type, Cassegrain‑type) for near‑field and far‑field engagement modes.
    color:TRL7 from:01/03/2026 till:14/03/2026
* Multilayer PVD optical coatings for high fluence, environmental stability, and specific spectral bands.
    color:TRL8 from:04/08/2026 till:17/08/2026
    color:TRL9 from:17/11/2026 till:23/11/2026


  bar:milestone0711 width:10
==== Target Engagement and Control ====
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:STT
* Target‑tracking rack integrating radar, EO/IR sensors, and laser rangefinders.
    color:TRL5 from:25/11/2025 till:07/12/2025
* Mission planning and logging rack for engagement scenarios, shot logging, and after‑action analysis.
    color:TRL6 from:08/12/2025 till:21/12/2025
* Algorithms for dwell time, spot placement, and power on target given atmospheric conditions.
    color:TRL7 from:15/03/2026 till:28/03/2026
    color:TRL8 from:18/08/2026 till:31/08/2026
    color:TRL9 from:24/11/2026 till:30/11/2026


  bar:milestone0712 width:10
==== Power Conversion and Lamp Driver Subsystems ====
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:SYS
* Conversion from ~2 MW AC to ~8 MW DC for pump and lamp driver systems.
    color:TRL5 from:25/11/2025 till:07/12/2025
* High‑power supply design with filtering, surge protection, and redundancy.
    color:TRL6 from:08/12/2025 till:21/12/2025
* Lamp driver controls with programmable pulse profiles and protection logic.
    color:TRL7 from:15/03/2026 till:28/03/2026
    color:TRL8 from:18/08/2026 till:31/08/2026
    color:TRL9 from:24/11/2026 till:30/11/2026


  bar:milestone0713 width:10
==== Control, Diagnostics, and Safety ====
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:VOVR
* Lamp‑driver control and synchronization with seed and pump stages.
    color:TRL5 from:22/12/2025 till:05/01/2026
* Beam diagnostics: measurement of beam profile, wavefront, focal spot, pulse duration, and energy (autocorrelator, FROG, M² cameras, pyro‑sensors).
    color:TRL6 from:06/01/2026 till:19/01/2026
* Safety systems against over‑power, self‑lasing, and optical damage (fast shutters, beam dumps, interlocks).
    color:TRL7 from:12/04/2026 till:25/04/2026
* Automatic shutdown and fault‑management logic for abnormal operating conditions.
    color:TRL8 from:01/09/2026 till:14/09/2026
    color:TRL9 from:30/11/2026 till:06/12/2026


  bar:milestone0714 width:10
==== Control & Software Subsystem ====
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:ACC
* Optical path modeling and optimization software (beam propagation, filamentation, turbulence effects, focus management).
    color:TRL5 from:22/12/2025 till:05/01/2026
* Mode control (energy, repetition rate, focal length, engagement profiles).
    color:TRL6 from:06/01/2026 till:19/01/2026
* Adaptive optics control loops (wavefront sensors, deformable mirrors, real‑time correction algorithms).
    color:TRL7 from:12/04/2026 till:25/04/2026
* Logging, configuration management, and performance trending over time.
    color:TRL8 from:01/09/2026 till:14/09/2026
    color:TRL9 from:30/11/2026 till:06/12/2026


  bar:milestone0715 width:10
==== Hybrid Cooling System ====
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:ADM
* Hybrid cooling for mirrors, lenses, prisms, and resonator components (e.g., LN2‑assisted systems).
    color:TRL5 from:20/01/2026 till:02/02/2026
* Design of cryogenic loops, insulation, and monitoring for safe and stable operation.
    color:TRL6 from:03/02/2026 till:16/02/2026
    color:TRL7 from:17/02/2026 till:28/02/2026
    color:TRL8 from:15/09/2026 till:28/09/2026
    color:TRL9 from:07/12/2026 till:13/12/2026


  bar:milestone0716 width:10
=== HPM System: High-Power Microwave (1.18 GW / 155 J / 5 µs, 53 dBi) ===
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:FILE
==== Power and Energy Subsystems ====
    color:TRL5 from:20/01/2026 till:02/02/2026
* AC power intake (e.g., ~640 kW), distribution panels, transformers, ATS, and load switching systems.
    color:TRL6 from:03/02/2026 till:16/02/2026
* Electromagnetic compatibility (EMC) filters for high‑power switching transients.
    color:TRL7 from:17/02/2026 till:28/02/2026
* Energy storage system design (capacitor banks, pulse‑forming networks) sized for required pulse energy.
    color:TRL8 from:15/09/2026 till:28/09/2026
* High‑voltage pulsed modulators (Marx generators, PFNs, solid‑state switches using IGBT / MOSFET / SiC devices).
    color:TRL9 from:07/12/2026 till:13/12/2026
* Individual or grouped modulators for sub‑arrays, including redundancy and fault isolation.


  bar:milestone0717 width:10
==== RF Sources and Amplification Chain ====
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:DVC
* Reference oscillator and waveform generator for stable frequency and phase control.
    color:TRL5 from:26/04/2026 till:08/05/2026
* Frequency synthesizer / PLL design for coarse and fine tuning over target bands.
    color:TRL6 from:09/05/2026 till:22/05/2026
* Low‑power RF chain: drivers, pre‑amplifiers (GaN / GaAs), and shaping of pulse envelopes (chirp, PRF variation).
    color:TRL7 from:23/05/2026 till:08/06/2026
* High‑power amplification using klystrons or alternative vacuum RF devices.
    color:TRL8 from:29/09/2026 till:12/10/2026
* Waveguide networks between amplifiers and radiating array elements, including loads, circulators, isolators, and directional couplers.
    color:TRL9 from:14/12/2026 till:20/12/2026
* Measurement of VSWR and reflected power, with automatic protection when loads are detuned or mismatched.


  bar:milestone0718 width:10
==== Antenna Array and Beamforming ====
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:MAP
* Phased array of radiating elements (e.g., TEM horns, waveguide radiators) with high gain (~53 dBi).
    color:TRL5 from:26/04/2026 till:08/05/2026
* Phase shifters and amplitude controllers for electronic beam steering and beam shaping.
    color:TRL6 from:09/05/2026 till:22/05/2026
* Calibration routines for mutual coupling, array pattern control, and sidelobe management.
    color:TRL7 from:23/05/2026 till:08/06/2026
* Mechanical platform for azimuth / elevation pointing, integrated with servo drives, position encoders, and inertial sensors.
    color:TRL8 from:29/09/2026 till:12/10/2026
    color:TRL9 from:14/12/2026 till:20/12/2026


  bar:milestone0719 width:10
==== Control, Synchronization, and Software ====
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:NAV
* Fire‑Control Unit (FCU) as the high‑level control element: HMI, safety interlocks, weapon employment logic, and scenario management.
    color:TRL5 from:21/12/2026 till:04/01/2027
* Algorithms for selecting exposure patterns (time, power, frequency sweep) based on target type and mission constraints.
    color:TRL6 from:05/01/2027 till:18/01/2027
* Synchronization of RF and digital timing signals across modulators, klystrons, and phase shifters.
    color:TRL7 from:19/01/2027 till:01/02/2027
* Beam steering and shaping software, including multi‑beam modes and dynamic power management vs distance (FSPL compensation).
    color:TRL8 from:02/02/2027 till:15/02/2027
* HPM Health Management: monitoring of all HV circuits, temperatures, SF6 pressure, vacuum in klystrons, capacitor health, and early degradation indicators.
    color:TRL9 from:25/04/2027 till:30/04/2027


  bar:milestone0720 width:10
==== Protection, EMC, and Thermal Management ====
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:PATH
* High‑voltage insulation systems with SF6 or alternative media, including leak detection, safety handling, and environmental controls.
    color:TRL5 from:21/12/2026 till:04/01/2027
* Electromagnetic shielding of the host platform and co‑located electronics against self‑interference.
    color:TRL6 from:05/01/2027 till:18/01/2027
* Thermal management for klystrons, modulators, pre‑amplifiers, and antenna panels (liquid cooling loops, compressors, heat exchangers, radiators).
    color:TRL7 from:19/01/2027 till:01/02/2027
* Mechanical design for shock, vibration, and operational robustness.
    color:TRL8 from:02/02/2027 till:15/02/2027
    color:TRL9 from:25/04/2027 till:30/04/2027


  bar:milestone0721 width:10
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:REC
    color:TRL5 from:16/02/2027 till:28/02/2027
    color:TRL6 from:28/02/2027 till:13/03/2027
    color:TRL7 from:14/03/2027 till:27/03/2027
    color:TRL8 from:11/04/2027 till:24/04/2027
    color:TRL9 from:01/05/2027 till:07/05/2027


  bar:milestone0722 width:10
==== Targeting, Sensing, and Integration ====
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:PLAY
* Cueing from radar, EO/IR, and ESM/ELINT sensors for target detection and tracking.
    color:TRL5 from:16/02/2027 till:28/02/2027
* Tracking filters (Kalman and variants) for target state estimation and engagement planning.
    color:TRL6 from:28/02/2027 till:13/03/2027
* Battle Damage Assessment (BDA) based on telemetric feedback and target signatures.
    color:TRL7 from:14/03/2027 till:27/03/2027
* Communication interfaces (Ethernet, MIL‑STD‑1553, CAN, SERDES) and cybersecurity measures.
    color:TRL8 from:11/04/2027 till:24/04/2027
* Command and event logging for post‑mission analysis and safety compliance.
    color:TRL9 from:01/05/2027 till:07/05/2027


  bar:milestone0723 width:10
==== High-Level Software ====
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:SEC
* Operator console (HMI) for wide‑area soft‑kill, localized hard‑kill, and diagnostic modes.
    color:TRL5 from:08/05/2027 till:21/05/2027
* Scenario “playbook” software for different target types (UAS swarms, missiles, aircraft, ground vehicles, sensors, communications nodes, stratospheric / LEO assets).
    color:TRL6 from:22/05/2027 till:07/06/2027
* Offline simulation tools for field modeling, atmospheric effects, multi‑bounce propagation, and typical EMC vulnerabilities.
    color:TRL7 from:08/06/2027 till:21/06/2027
    color:TRL8 from:22/06/2027 till:04/07/2027
    color:TRL9 from:31/08/2027 till:06/09/2027


  bar:milestone0724 width:10
=== Aerial Firefighting & Rescue Multi-Role Package ===
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:STM
==== Wildfire and Large-Scale Fire Scenarios ====
    color:TRL5 from:08/05/2027 till:21/05/2027
* Continuous monitoring concepts with EO/IR, LIDAR, and meteorological sensors.
    color:TRL6 from:22/05/2027 till:07/06/2027
* High‑pressure sprinkler and atomization systems for fine‑particle water and retardant dispersal.
    color:TRL7 from:08/06/2027 till:21/06/2027
* Modular tanks and pumps for water, foams, and chemical agents; rapid refilling mechanisms.
    color:TRL8 from:22/06/2027 till:04/07/2027
* Formation flight / tethered operation of multiple units (e.g., chains of 4 units) for containment lines.
    color:TRL9 from:31/08/2027 till:06/09/2027
* Water uptake systems from surface sources (lakes, rivers, sea), including robotic ladder or hose support.


  bar:milestone0725 width:10
==== Search and Rescue Scenarios ====
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:TRSL
* Robotic aerial ladder / travelator concepts for evacuation from high‑rise buildings, flood zones, and confined “fire traps”.
    color:TRL5 from:05/07/2027 till:18/07/2027
* Configurations for maritime rescue (distressed vessels, open water), mountain rescue, and animal evacuation from forest zones.
    color:TRL6 from:19/07/2027 till:02/08/2027
* Integration of GPR and other sensors for void detection under rubble during earthquake response.
    color:TRL7 from:03/08/2027 till:16/08/2027
* Lighting and power modules for night operations and disaster site illumination.
    color:TRL8 from:17/08/2027 till:30/08/2027
    color:TRL9 from:07/09/2027 till:13/09/2027


  bar:milestone0726 width:10
==== Flood and Earthquake Response ====
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:VBS
* High‑capacity water pumping modules for floodwater removal.
    color:TRL5 from:05/07/2027 till:18/07/2027
* Rapid deployment of temporary bridges and crossings using modular structural elements and lifting systems.
    color:TRL6 from:19/07/2027 till:02/08/2027
* Aerial crane configurations for moving heavy loads and lifting debris.
    color:TRL7 from:03/08/2027 till:16/08/2027
    color:TRL8 from:17/08/2027 till:30/08/2027
    color:TRL9 from:07/09/2027 till:13/09/2027


# Software Development: Evelyn Berezin Team
==== Emergency Response and Logistics ====
* Power supply modules for emergency power to critical infrastructure.
* Cargo and relief logistics modules for isolated or damaged regions.


#IMS, Chat, Workgroups, Tasks, Mission planning
==== Agricultural and Drought Mitigation ====
#Prio #1: CHAT, IMSG,
* Spraying systems for liquid fertilizers, pesticides, and other treatments.
#Prio #2: CRPT, MSG, TSK, WGR
* Night‑time emergency soil moisture restoration via artificial precipitation or irrigation patterns.
#Prio #3: ANLS, CAL, MAIL, PLAN
#Prio #4: WIKI
#Prio #5:


  bar:milestone0801 width:10
=== Cargo and Heavy-Lift Logistics ===
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:CHAT
==== Liquid and Container Cargo ====
    color:TRL5 from:11/05/2025 till:24/05/2025
* Tank modules for crude oil, petroleum products, chemicals, and LNG, including insulation and safety measures.
    color:TRL6 from:25/05/2025 till:09/06/2025
* Container handling systems for standard container units and specialized logistics modules.
    color:TRL7 from:02/09/2025 till:15/09/2025
* Integration of loading/unloading systems for operation at sea (anchored vessels) and remote terminals.
    color:TRL8 from:09/06/2026 till:22/06/2026
    color:TRL9 from:20/10/2026 till:26/10/2026


  bar:milestone0802 width:10
==== Multimodal and Oversized Cargo ====
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:IMSG
* Interfaces for multimodal transport (rail, road, sea) and direct ship‑to‑platform loading.
    color:TRL5 from:10/06/2025 till:23/06/2025
* Suspension and rigging systems for oversized cargo, including dynamic load compensation.
    color:TRL6 from:24/06/2025 till:06/07/2025
    color:TRL7 from:16/09/2025 till:29/09/2025
    color:TRL8 from:23/06/2026 till:05/07/2026
    color:TRL9 from:27/10/2026 till:02/11/2026


  bar:milestone0803 width:10
==== Heavy and Super-Heavy Loads ====
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:CRPT
* Structural and mechanical design for rigid vertical couplings up to ~720 k lb total load.
    color:TRL5 from:07/07/2025 till:20/07/2025
* Redundancy and safety systems in lifting lines, hooks, and coupling hardware.
    color:TRL6 from:21/07/2025 till:04/08/2025
* Control algorithms for load stabilization in wind and turbulent conditions.
    color:TRL7 from:30/09/2025 till:13/10/2025
    color:TRL8 from:06/07/2026 till:19/07/2026
    color:TRL9 from:03/11/2026 till:09/11/2026


  bar:milestone0804 width:10
=== Drone Hunter Interceptor Package ===
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:MSG
==== Concept and Validation ====
    color:TRL5 from:05/08/2025 till:18/08/2025
* Detailed concept of operations (CONOPS) for drone interception and counter‑UAS missions.
    color:TRL6 from:19/08/2025 till:01/09/2025
* Concept validation through simulation, digital twins, and controlled range tests.
    color:TRL7 from:14/10/2025 till:27/10/2025
    color:TRL8 from:20/07/2026 till:03/08/2026
    color:TRL9 from:10/11/2026 till:16/11/2026


  bar:milestone0805 width:10
==== Electromechanical Systems and Interfaces ====
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:TSK
* Airframe optimization for interception profile (eVTOL tiltrotor with nose‑down engagement configuration and high agility).
    color:TRL5 from:28/10/2025 till:10/11/2025
* Mounts and recoil management for kinetic payloads (e.g., “Flying Shotgun” configuration, 12‑gauge 3‑inch magnum, dual 18‑round cylinder feed).
    color:TRL6 from:11/11/2025 till:24/11/2025
* Mechanical and safety interlocks for weapon deployment and stowage.
    color:TRL7 from:01/03/2026 till:14/03/2026
    color:TRL8 from:04/08/2026 till:17/08/2026
    color:TRL9 from:17/11/2026 till:23/11/2026


  bar:milestone0806 width:10
==== Sensor Systems ====
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:WGR
* EO/IR sensor suite for detection, tracking, and identification of small UAS.
    color:TRL5 from:25/11/2025 till:07/12/2025
* Laser rangefinder for precise distance measurement and ballistic solution input.
    color:TRL6 from:08/12/2025 till:21/12/2025
* Integration of radar or RF‑based detection (where applicable).
    color:TRL7 from:15/03/2026 till:28/03/2026
    color:TRL8 from:18/08/2026 till:31/08/2026
    color:TRL9 from:24/11/2026 till:30/11/2026


  bar:milestone0807 width:10
==== Communication Systems ====
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:ANLS
* Highly directional multi‑band communication antennas with beam steering capability.
    color:TRL5 from:22/12/2025 till:05/01/2026
* Frequency‑hopping, encrypted links for control and telemetry.
    color:TRL6 from:06/01/2026 till:19/01/2026
* Integration with tactical data links and C2 networks for cueing and coordination.
    color:TRL7 from:12/04/2026 till:25/04/2026
    color:TRL8 from:01/09/2026 till:14/09/2026
    color:TRL9 from:30/11/2026 till:06/12/2026


  bar:milestone0808 width:10
==== Flight Control and Mission Management ====
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:CAL
* Flight control laws tuned for aggressive maneuvering, hover and nose‑down attack positions, and horizontal transit.
    color:TRL5 from:20/01/2026 till:02/02/2026
* Mission management logic: target acquisition, pursuit, engagement, disengagement, and return‑to‑base.
    color:TRL6 from:03/02/2026 till:16/02/2026
* Rules of engagement and safety envelopes (no‑fire zones, abort criteria, collision avoidance).
    color:TRL7 from:17/02/2026 till:28/02/2026
    color:TRL8 from:15/09/2026 till:28/09/2026
    color:TRL9 from:07/12/2026 till:13/12/2026


  bar:milestone0809 width:10
==== V&V and Certification Program ====
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:MAIL
* V&V plan covering airworthiness, weapon safety, and mission safety aspects.
    color:TRL5 from:26/04/2026 till:08/05/2026
* Range trials for interception scenarios, including live‑fire testing where applicable.
    color:TRL6 from:09/05/2026 till:22/05/2026
* Airworthiness and certification/qualification activities in line with applicable military or civil standards.
    color:TRL7 from:23/05/2026 till:08/06/2026
    color:TRL8 from:29/09/2026 till:12/10/2026
    color:TRL9 from:14/12/2026 till:20/12/2026


  bar:milestone0810 width:10
==Artifacts==
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:PLAN
=== Project A (Tactical Situational Awareness Headset) ===
    color:TRL5 from:21/12/2026 till:04/01/2027
* Hardware Diagram
    color:TRL6 from:05/01/2027 till:18/01/2027
[[File:ARHUDFM Hardware Architecture v1.1.png|frameless|990x990px]]
    color:TRL7 from:19/01/2027 till:01/02/2027
* Hardware Architecture
    color:TRL8 from:02/02/2027 till:15/02/2027
[[File:ARHUDFM Hardware Architecture v1.0.jpeg|frameless|950x950px]]
    color:TRL9 from:25/04/2027 till:30/04/2027


  bar:milestone0811 width:10
''SDR, SDR Scan, RDF, Radar Detection, IFF, Networks, Remote control''
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:WIKI
*Prio #1: [[Public:Applications#IFF%20(IFF%20control)|IFF]], [[Public:Applications#NET%20(Networks)|NET]], [[Public:Applications#RDF%20(Radio%20direction%20finding%20control)|RDF]], [[Public:Applications#RFDD%20(RF%20Drone%20detection%20control)|RFDD]], [[Public:Applications#RWRC%20(Radar%20warning%20receiver%20control)|RWRC]], [[Public:Applications#SDRS%20(SDR%20Scan)|SDRS]]
    color:TRL5 from:16/02/2027 till:28/02/2027
*Prio #2: [[Public:Applications#P2P%20(P2P%20%26%20Cloud%20Computing)|P2P]], [[Public:Applications#RPAC%20(Drone%20RC)|RPAC]], [[Public:Applications#SDR2%20(SDR%202-way)|SDR2]]
    color:TRL6 from:28/02/2027 till:13/03/2027
*Prio #3: [[Public:Applications#ANTC%20(Antennas%20control)|ANTC]], [[Public:Applications#EODD%20(RF%20EOD%20detection%20control)|EODD]], [[Public:Applications#PCSR (Passive covert surveillance radar)|PCSR]]
    color:TRL7 from:14/03/2027 till:27/03/2027
*Prio #4: [[Public:Applications#APAR%20(Active%20phased%20array%20radar%20control)|APAR]], [[Public:Applications#FTRC%20(Fire%20turret%20RC)|FTRC]], [[Public:Applications#RBRC%20(Robot%20RC)|RBRC]], [[Public:Applications#UVRC%20(Unmanned%20vehicle%20RC)|UVRC]]
    color:TRL8 from:11/04/2027 till:24/04/2027
    color:TRL9 from:01/05/2027 till:07/05/2027


# Software Development: Barbara Askins Team
''System Integration, DevOps, Maps, VBS, Sensors''
*Prio #1: [[Public:Applications#CAM%20(Cameras%20control)|CAM]], [[Public:Applications#DISP%20(Display%20control)|DISP]], [[Public:Applications#FPAD%20(Fading%20Pads%20control)|FPAD]], [[Public:Applications#GNSS%20(GNSS)|GNSS]], [[Public:Applications#HT%20(Hand%20tracking%20system)|HT]], [[Public:Applications#INP%20(Joystick%20and%20buttons%20settings)|INP]], [[Public:Applications#MMC%20(Multimedia%20control)|MMC]], [[Public:Applications#PTTH%20(PTT%20Headset)|PTTH]], [[Public:Applications#SPOT%20(LED%20Spotlight%20settings)|SPOT]], [[Public:Applications#SRV%20(Services)|SRV]], [[Public:Applications#STT%20(Speech-to-text)|STT]], [[Public:Applications#SYS%20(System)|SYS]], [[Public:Applications#VOVR%20(Voiceover)|VOVR]]
*Prio #2: [[Public:Applications#ACC%20(Accounts%20%26%20Sync)|ACC]], [[Public:Applications#ADM%20(Admin%20only)|ADM]], [[Public:Applications#FILE%20(File%20explorer)|FILE]], [[Public:Applications#DVC%20(Integrated%20devices)|DVC]], [[Public:Applications#MAP%20(Maps)|MAP]], [[Public:Applications#NAV%20(Navigation)|NAV]], [[Public:Applications#PATH%20(Path%20tracking)|PATH]], [[Public:Applications#REC%20(Multimedia%20recorder)|REC]], [[Public:Applications#PLAY%20(Multimedia%20player)|PLAY]], [[Public:Applications#SEC%20(Security)|SEC]], [[Public:Applications#STM%20(Stealth%20modes%20control)|STM]]
*Prio #3: [[Public:Applications#TRSL%20(Translater)|TRSL]]
*Prio #4: [[Public:Applications#VBS%20(Vitals%20Body%20sensors%20control)|VBS]]


#Computer Vision, Computer Audition, AI/ML, AI/DL, AI/NLP, AI/ANN
''IMS, Chat, Workgroups, Tasks, Mission planning''
#Prio #1: TESS
*Prio #1: [[Public:Applications#CHAT%20(Chat)|CHAT]], [[Public:Applications#IMSG%20(Instant%20messaging%20system)|IMSG]],
#Prio #2: CVC, FA
*Prio #2: [[Public:Applications#CRPT%20(Cryptologic%20control)|CRPT]], [[Public:Applications#MSG%20(Messenger)|MSG]], [[Public:Applications#TSK%20(Tasks)|TSK]], [[Public:Applications#WGR%20(Workgroups)|WGR]]
#Prio #3: CAC
*Prio #3: [[Public:Applications#ANLS%20(Mission%20analyzing)|ANLS]], [[Public:Applications#CAL%20(Calendar)|CAL]], [[Public:Applications#MAIL%20(eMail%20client)|MAIL]], [[Public:Applications#PLAN%20(Mission%20planning)|PLAN]]
#Prio #4: VM
*Prio #4: [[Public:Applications#WIKI%20(Wiki)|WIKI]]
#Prio #5:


  bar:milestone0901 width:10
''Computer Vision, Computer Audition, AI/ML, AI/DL, AI/NLP, AI/ANN''
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:TESS
*Prio #1: [[Public:Applications#TESS%20(Voice%20assistant)|TESS]]
    color:TRL5 from:11/05/2025 till:24/05/2025
*Prio #2: [[Public:Applications#CVC%20(Computer%20Vision%20Control)|CVC]], [[Public:Applications#FA%20(Firing%20Assistance%20control)|FA]]
    color:TRL6 from:25/05/2025 till:09/06/2025
*Prio #3: [[Public:Applications#CAC%20(Computer%20Audition%20control)|CAC]]
    color:TRL7 from:02/09/2025 till:15/09/2025
*Prio #4: [[Public:Applications#VM%20(Virtual%20mentor)|VM]]
    color:TRL8 from:09/06/2026 till:22/06/2026
    color:TRL9 from:20/10/2026 till:26/10/2026


  bar:milestone0902 width:10
==Development Teams (Project B)==
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:CVC
===Design Development & Architecture [A]: Ada Lovelace Team===
    color:TRL5 from:10/06/2025 till:23/06/2025
''Device design, GUI, VUI, Apps algorithms, Demos, Videos, Animations''
    color:TRL6 from:24/06/2025 till:06/07/2025
*Prio #1: Research and description of the principle of operation, description of the technology application, computer-added design, event-driven software architecture<ref name=":0" />
    color:TRL7 from:16/09/2025 till:29/09/2025
*Prio #2: Technology functionality demo, specific functionality description, GUI demo, lab experimental setup
    color:TRL8 from:23/06/2026 till:05/07/2026
    color:TRL9 from:27/10/2026 till:02/11/2026


  bar:milestone0903 width:10
=== Mechanical Engineering [M]: Stephanie Kwolek Team ===
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:FA
*Prio #1: [TRL 5-6] Prototype: based on 3D print, vacuum casting, vacuum unfusion
    color:TRL5 from:07/07/2025 till:20/07/2025
*Prio #2: [TRL 7] MVP<sub>α</sub>: vacuum casting, vacuum unfusion, injection moulding, manual assembly
    color:TRL6 from:21/07/2025 till:04/08/2025
*Prio #3: [TRL 8] MVP<sub>β</sub>: vacuum casting, vacuum unfusion, injection moulding, manual assembly
    color:TRL7 from:30/09/2025 till:13/10/2025
*Prio #4: [TRL 9] MMP<sub>δ</sub>: manufacturing process automation, robotic assembly, add-ons (auto tourniquets, Care Under Fire set, SCBA integration, external aramid cover, continuous wind сapture impellers, software defined antenna, handheld metal re-radiation radar, optional battery, digital sight)
    color:TRL8 from:06/07/2026 till:19/07/2026
*Prio #5: MMP<sub>γ</sub>: manufacturing & assembly & logistic process upgrade
    color:TRL9 from:03/11/2026 till:09/11/2026
 
  bar:milestone0904 width:10
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:CAC
    color:TRL5 from:05/08/2025 till:18/08/2025
    color:TRL6 from:19/08/2025 till:01/09/2025
    color:TRL7 from:14/10/2025 till:27/10/2025
    color:TRL8 from:20/07/2026 till:03/08/2026
    color:TRL9 from:10/11/2026 till:16/11/2026
 
  bar:milestone0905 width:10
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:VM
    color:TRL5 from:28/10/2025 till:10/11/2025
    color:TRL6 from:11/11/2025 till:24/11/2025
    color:TRL7 from:01/03/2026 till:14/03/2026
    color:TRL8 from:04/08/2026 till:17/08/2026
    color:TRL9 from:17/11/2026 till:23/11/2026
 
# Networking: Margaret Hamilton Team
 
#Mentor Relations, Pitches, Updates
#Prio #1: Mentor Relations, Updates
#Prio #2: Business angels (pre-seed round)
#Prio #3: Business angels & Venture capital (seed round)
#Prio #4: Venture capital (round A)
#Prio #5:
 
  bar:milestone1001 width:10
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Mentorship
    color:PROCESS from:20/07/2024 till:01/07/2027
 
  bar:milestone1002 width:10
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Updates, PR
    color:PROCESS from:01/10/2024 till:31/12/2028


  bar:milestone1003 width:10
=== Aerospace Engineering [F]: Amelia Earhart Team ===
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Investors
    color:PROCESS from:01/11/2024 till:01/04/2025
    color:PROCESS from:01/05/2025 till:01/10/2025
    color:PROCESS from:01/11/2025 till:01/04/2026
    color:PROCESS from:01/07/2027 till:01/01/2028
 
  bar:milestone1004 width:10
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Cofounders in Germany
    color:PROCESS from:01/01/2025 till:01/04/2025
    color:PROCESS from:01/09/2025 till:01/01/2026
    color:PROCESS from:01/07/2026 till:01/01/2027
 
  bar:milestone1005 width:10
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Cofounders in the U.S.
    color:PROCESS from:01/04/2025 till:01/09/2025
    color:PROCESS from:01/01/2026 till:01/07/2026
    color:PROCESS from:01/01/2027 till:31/12/2028
 
# Customer & Business Development: Barbara Liskov Team
 
#Requests, eMails, PR, Meetings
#Prio #1: Innovation programs research, requests, eMails, meetings
#Prio #2: Collaboration research, PR
#Prio #3: Proving ground testing
#Prio #4: Pilot programs
 
  bar:milestone1101 width:10
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:DoD programs research
    color:PROCESS from:01/01/2025 till:31/12/2028
 
  bar:milestone1102 width:10
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Collaboration research
    color:PROCESS from:01/01/2025 till:31/12/2028
 
  bar:milestone1103 width:10
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Proving ground testing
    color:PROCESS from:01/04/2026 till:01/01/2028
 
  bar:milestone1104 width:10
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Pilot programs
    color:PROCESS from:01/10/2026 till:31/12/2028
 
  bar:milestone1105 width:10
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Experimental manufacturing
    color:PROCESS from:01/10/2025 till:31/12/2028
 
  bar:milestone1106 width:10
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Serial mfg in Germany
    color:PROCESS from:01/07/2026 till:31/12/2028
 
  bar:milestone1107 width:10
    textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Serial mfg in the U.S.
    color:PROCESS from:01/10/2028 till:31/12/2028
 
  bar:0 width:1
    textcolor:red at:15/03/2025 shift:(-15,-4) text:Pre-Seed
    textcolor:red at:15/09/2025 shift:(-10,-4) text:Seed
    textcolor:red at:15/03/2026 shift:(-15,-4) text:round A
    textcolor:red at:15/12/2027 shift:(-15,-4) text:round B
 
  bar:99 width:1
    textcolor:oceanblue at:01/07/2025 shift:(-25,-4) text:MVP Alpha >
    textcolor:oceanblue at:01/01/2026 shift:(-25,-4) text:MVP Beta >
    textcolor:oceanblue at:01/10/2026 shift:(-25,-4) text:MMP Gamma >
    textcolor:oceanblue at:01/01/2027 shift:(25,-4) text:MMP Delta >
 
LineData=
  at:$now color:TODAY width:0.2
 
  at:01/07/2025 color:powderblue width:0.2 layer:back #deadline of end TRL-6 (MVPα)
  at:01/01/2026 color:powderblue width:0.2 layer:back #deadline of end TRL-7 (MVPβ)
  at:01/10/2026 color:powderblue width:0.2 layer:back #deadline of end TRL-8 (MMPδ)
  at:01/04/2027 color:powderblue width:0.2 layer:back #deadline of end TRL-9 (MMPγ)
 
  at:25/03/2025 color:pink width:10 layer:back
  at:25/09/2025 color:pink width:10 layer:back
  at:25/03/2026 color:pink width:10 layer:back
  at:25/12/2027 color:pink width:10 layer:back
 
}}
 
===Investment Rounds Goals===
{| class="wikitable"
|+
!Time Period
!Round
!Amount
!Goals
|-
|Q1 2025
|Pre-Seed
|$1,750,000
|
*[TRL 7] MVP<sub>α</sub>:
*[TRL 8] MVP<sub>β</sub>:
|-
|Q3 2025
|Seed
|$6,700,000
|
*[TRL 9, SRL 3] MMP<sub>δ</sub>:
*[IRL 6, SRL 4] MMP<sub>γ</sub>:
*Experimental manufacturing
*Proving ground testing
|-
|Q1 2026
|Round A
|$16,000,000
|
*Serial manufacturing in Germany (manual assembly)
*Proving ground testing
*[IRL 7] Pilot programs, V&V product, PMF
|-
|Q4 2027
|Round B
|$85,000,000
|
*Full robotic lines implementation
*Serial robotized manufacturing in the U.S.
*[SRL 5] Scaling and operational support
|}
 
==Development Teams==
===Design Development & Algorithm Architecture: Ada Lovelace<ref>Wikipedia, [[wikipedia:Ada_Lovelace|Ada Lovelace]]</ref> Team===
''Device design, GUI, VUI, Apps algorithms, Demos, Videos, Animations''
*Prio #1: Research and description of the principle of operation, description of the technology application, computer-added design, event-driven software architecture<ref>Wikipedia, [[wikipedia:Event-driven_architecture|Event-driven software architecture (EDA)]]</ref>
*Prio #2: Technology functionality demo, specific functionality description, GUI demo, lab experimental setup
[[File:ARHUDFM Hardware Architecture v1.1.png|frameless|990x990px]]
===Mechanical Engineering: Stephanie Kwolek<ref>Wikipedia, [[wikipedia:Stephanie_Kwolek|Stephanie Kwolek]]</ref> Team===
*Prio #1: [TRL 5-6] Prototype: based on 3D print, vacuum casting, vacuum unfusion
*Prio #1: [TRL 5-6] Prototype: based on 3D print, vacuum casting, vacuum unfusion
*Prio #2: [TRL 7] MVP<sub>α</sub>: vacuum casting, vacuum unfusion, injection moulding, manual assembly
*Prio #2: [TRL 7] MVP<sub>α</sub>: vacuum casting, vacuum unfusion, injection moulding, manual assembly
Line 1,972: Line 1,321:
*Prio #4: [TRL 9] MMP<sub>δ</sub>: manufacturing process automation, robotic assembly, add-ons (auto tourniquets, Care Under Fire set, SCBA integration, external aramid cover, continuous wind сapture impellers, software defined antenna, handheld metal re-radiation radar, optional battery, digital sight)
*Prio #4: [TRL 9] MMP<sub>δ</sub>: manufacturing process automation, robotic assembly, add-ons (auto tourniquets, Care Under Fire set, SCBA integration, external aramid cover, continuous wind сapture impellers, software defined antenna, handheld metal re-radiation radar, optional battery, digital sight)
*Prio #5: MMP<sub>γ</sub>: manufacturing & assembly & logistic process upgrade
*Prio #5: MMP<sub>γ</sub>: manufacturing & assembly & logistic process upgrade
===Optical Engineering: Katharine Blodgett<ref>Wikipedia, [[wikipedia:Katharine_Burr_Blodgett|Katharine Burr Blodgett]]</ref> Team===
 
=== Optical Engineering [O]: Katharine Blodgett Team ===
''Light guide, Beam splitting prisms, Dichroic mirror, Optical coatings, Fading pads''
''Light guide, Beam splitting prisms, Dichroic mirror, Optical coatings, Fading pads''
*Prio #1: [TRL 5-6] Prototype: optical scheme, light guide, dichroic mirror, fading pads
*Prio #1: [TRL 5-6] Prototype: optical scheme, light guide, dichroic mirror, fading pads
Line 1,979: Line 1,329:
*Prio #4: [TRL 9] MMP<sub>δ</sub>:
*Prio #4: [TRL 9] MMP<sub>δ</sub>:
*Prio #5: MMP<sub>γ</sub>:
*Prio #5: MMP<sub>γ</sub>:
===Electronics Engineering: Ida Hyde<ref>Wikipedia, [[wikipedia:Ida_Henrietta_Hyde|Ida Henrietta Hyde]]</ref> Team===
[[File:ARHUDFM Hardware Architecture v1.0.jpeg|frameless|950x950px]]


=== Electronics Engineering [E]: Ida Hyde Team ===
''Schematics and PCBs for motherboard, projector, IFF Transponder, SDR, SDRS, PCSR, Digital sight''
''Schematics and PCBs for motherboard, projector, IFF Transponder, SDR, SDRS, PCSR, Digital sight''
*Prio #1: [TRL 5-6] Prototype: based on Raspberry Pi 5B, Texas Instruments DLPDLCR2000EVM
*Prio #1: [TRL 5-6] Prototype: based on Raspberry Pi 5B, Texas Instruments DLPDLCR2000EVM
*Prio #2: [TRL 7] MVP<sub>α</sub>: motherboard chipset Intel 700, Z790<ref>Intel [https://www.intel.com/content/www/us/en/products/docs/chipsets/desktop-chipsets/z790-chipset-brief.html Z790 Chipset]</ref> or HM770<ref>Intel [https://www.intel.com/content/www/us/en/products/sku/232478/intel-hm770-chipset/specifications.html HM770 Chipset]</ref>, CPU Intel Core i7-14700HX<ref>Intel, [https://www.intel.com/content/www/us/en/newsroom/news/intel-core-14th-gen-desktop-processors.html 14th Gen Core i7]</ref><ref>Intel [https://www.intel.com/content/www/us/en/products/docs/processors/core/13th-gen-core-mobile-brief.html Core i7 13th Gen HX (for mobile devices) Series], [https://www.intel.com/content/www/us/en/products/sku/232161/intel-core-i713850hx-processor-30m-cache-up-to-5-30-ghz/specifications.html?wapkw=i7-13850hx i7-13850HX Processor] </ref>, DLP PCB, SDRS PCB, IFF PCB
*Prio #2: [TRL 7] MVP<sub>α</sub>: motherboard chipset Intel 700, Z790<ref name=":1" /> or HM770<ref name=":2" />, CPU Intel Core i7-14700HX<ref name=":3" /><ref name=":4" />, DLP PCB, SDRS PCB, IFF PCB
*Prio #3: [TRL 8] MVP<sub>β</sub>: SDR2 PCB, add-on (software defined antenna, optional battery, continuous wind capture impellers)
*Prio #3: [TRL 8] MVP<sub>β</sub>: SDR2 PCB, add-on (software defined antenna, optional battery, continuous wind capture impellers)
*Prio #4: [TRL 9] MMP<sub>δ</sub>: add-on (auto tourniquets, Care Under Fire set, handheld metal re-radiation radar)
*Prio #4: [TRL 9] MMP<sub>δ</sub>: add-on (auto tourniquets, Care Under Fire set, handheld metal re-radiation radar)
*Prio #5: MMP<sub>γ</sub>: add-on (digital sight)
*Prio #5: MMP<sub>γ</sub>: add-on (digital sight)
===Software Development: Hedy Lamarr<ref>Wikipedia, [[wikipedia:Hedy_Lamarr|Hedy Lamarr]]</ref> Team===
 
=== Software Development [R]: Hedy Lamarr Team ===
''SDR, SDR Scan, RDF, Radar Detection, IFF, Networks, Remote control''
''SDR, SDR Scan, RDF, Radar Detection, IFF, Networks, Remote control''
*Prio #1: [[Public:Applications#IFF%20(IFF%20control)|IFF]], [[Public:Applications#NET%20(Networks)|NET]], [[Public:Applications#RDF%20(Radio%20direction%20finding%20control)|RDF]], [[Public:Applications#RFDD%20(RF%20Drone%20detection%20control)|RFDD]], [[Public:Applications#RWRC%20(Radar%20warning%20receiver%20control)|RWRC]], [[Public:Applications#SDRS%20(SDR%20Scan)|SDRS]]
*Prio #1: [[Public:Applications#IFF%20(IFF%20control)|IFF]], [[Public:Applications#NET%20(Networks)|NET]], [[Public:Applications#RDF%20(Radio%20direction%20finding%20control)|RDF]], [[Public:Applications#RFDD%20(RF%20Drone%20detection%20control)|RFDD]], [[Public:Applications#RWRC%20(Radar%20warning%20receiver%20control)|RWRC]], [[Public:Applications#SDRS%20(SDR%20Scan)|SDRS]]
Line 1,995: Line 1,345:
*Prio #4: [[Public:Applications#APAR%20(Active%20phased%20array%20radar%20control)|APAR]], [[Public:Applications#FTRC%20(Fire%20turret%20RC)|FTRC]], [[Public:Applications#RBRC%20(Robot%20RC)|RBRC]], [[Public:Applications#UVRC%20(Unmanned%20vehicle%20RC)|UVRC]]
*Prio #4: [[Public:Applications#APAR%20(Active%20phased%20array%20radar%20control)|APAR]], [[Public:Applications#FTRC%20(Fire%20turret%20RC)|FTRC]], [[Public:Applications#RBRC%20(Robot%20RC)|RBRC]], [[Public:Applications#UVRC%20(Unmanned%20vehicle%20RC)|UVRC]]
*Prio #5:
*Prio #5:
===Software Development: Grace Hopper<ref>Wikipedia, [[wikipedia:Grace_Hopper|Grace Hopper]]</ref> Team===
 
=== Software Development [S]: Grace Hopper Team ===
''System Integration, DevOps, Maps, VBS, Sensors''
''System Integration, DevOps, Maps, VBS, Sensors''
*Prio #1: [[Public:Applications#CAM%20(Cameras%20control)|CAM]], [[Public:Applications#DISP%20(Display%20control)|DISP]], [[Public:Applications#FPAD%20(Fading%20Pads%20control)|FPAD]], [[Public:Applications#GNSS%20(GNSS)|GNSS]], [[Public:Applications#HT%20(Hand%20tracking%20system)|HT]], [[Public:Applications#INP%20(Joystick%20and%20buttons%20settings)|INP]], [[Public:Applications#MMC%20(Multimedia%20control)|MMC]], [[Public:Applications#PTTH%20(PTT%20Headset)|PTTH]], [[Public:Applications#SPOT%20(LED%20Spotlight%20settings)|SPOT]], [[Public:Applications#SRV%20(Services)|SRV]], [[Public:Applications#STT%20(Speech-to-text)|STT]], [[Public:Applications#SYS%20(System)|SYS]], [[Public:Applications#VOVR%20(Voiceover)|VOVR]]
*Prio #1: [[Public:Applications#CAM%20(Cameras%20control)|CAM]], [[Public:Applications#DISP%20(Display%20control)|DISP]], [[Public:Applications#FPAD%20(Fading%20Pads%20control)|FPAD]], [[Public:Applications#GNSS%20(GNSS)|GNSS]], [[Public:Applications#HT%20(Hand%20tracking%20system)|HT]], [[Public:Applications#INP%20(Joystick%20and%20buttons%20settings)|INP]], [[Public:Applications#MMC%20(Multimedia%20control)|MMC]], [[Public:Applications#PTTH%20(PTT%20Headset)|PTTH]], [[Public:Applications#SPOT%20(LED%20Spotlight%20settings)|SPOT]], [[Public:Applications#SRV%20(Services)|SRV]], [[Public:Applications#STT%20(Speech-to-text)|STT]], [[Public:Applications#SYS%20(System)|SYS]], [[Public:Applications#VOVR%20(Voiceover)|VOVR]]
Line 2,002: Line 1,353:
*Prio #4: [[Public:Applications#VBS%20(Vitals%20Body%20sensors%20control)|VBS]]
*Prio #4: [[Public:Applications#VBS%20(Vitals%20Body%20sensors%20control)|VBS]]
*Prio #5:
*Prio #5:
===Software Development: Evelyn Berezin<ref>Wikipedia, [[wikipedia:Evelyn_Berezin|Evelyn Berezin]]</ref> Team===
 
=== Software Development [T]: Evelyn Berezin Team ===
''IMS, Chat, Workgroups, Tasks, Mission planning''
''IMS, Chat, Workgroups, Tasks, Mission planning''
*Prio #1: [[Public:Applications#CHAT%20(Chat)|CHAT]], [[Public:Applications#IMSG%20(Instant%20messaging%20system)|IMSG]],
*Prio #1: [[Public:Applications#CHAT%20(Chat)|CHAT]], [[Public:Applications#IMSG%20(Instant%20messaging%20system)|IMSG]],
Line 2,009: Line 1,361:
*Prio #4: [[Public:Applications#WIKI%20(Wiki)|WIKI]]
*Prio #4: [[Public:Applications#WIKI%20(Wiki)|WIKI]]
*Prio #5:
*Prio #5:
===Software Development: Barbara Askins<ref>Wikipedia, [[wikipedia:Barbara_Askins|Barbara Askins]]</ref> Team===
 
=== Software Development [I]: Barbara Askins Team ===
''Computer Vision, Computer Audition, AI/ML, AI/DL, AI/NLP, AI/ANN''
''Computer Vision, Computer Audition, AI/ML, AI/DL, AI/NLP, AI/ANN''
*Prio #1: [[Public:Applications#TESS%20(Voice%20assistant)|TESS]]
*Prio #1: [[Public:Applications#TESS%20(Voice%20assistant)|TESS]]
Line 2,016: Line 1,369:
*Prio #4: [[Public:Applications#VM%20(Virtual%20mentor)|VM]]
*Prio #4: [[Public:Applications#VM%20(Virtual%20mentor)|VM]]
*Prio #5:
*Prio #5:
===Networking: Margaret Hamilton<ref>Wikipedia, [[wikipedia:Margaret_Hamilton_(software_engineer)|Margaret Hamilton]]</ref> Team===
 
=== Networking [N]: Margaret Hamilton Team ===
''Mentor Relations, Pitches, Updates''
''Mentor Relations, Pitches, Updates''
*Prio #1: Mentor Relations, Updates
*Prio #1: Mentor Relations, Updates
Line 2,023: Line 1,377:
*Prio #4: Venture capital (round A)
*Prio #4: Venture capital (round A)
*Prio #5:
*Prio #5:
===Customer & Business Development: Barbara Liskov<ref>Wikipedia, [[wikipedia:Barbara_Liskov|Barbara Liskov]]</ref> Team===
 
=== Customer & Business Development [C]: Barbara Liskov Team ===
''Requests, eMails, PR, Meetings''
''Requests, eMails, PR, Meetings''
*Prio #1: Innovation programs research, requests, eMails, meetings
*Prio #1: Innovation programs research, requests, eMails, meetings

Latest revision as of 16:11, 25 April 2026

redirect Further information: Public:ARHUDFM Manifesto, Public:Graphical User Interface, Public:Applications, Public:DoD Pains, Public:ARHUDFM Features Summary, Public:Dataroom, Deck "Tactical Situational Awareness Mobility Platform (Headset)", Deck "Unmanned Airship Drone Platform" (aerospace & wildfire expert edition), Deck "24/7 Airborne C-UAS Long-Range AI-driven Defense Platform" (military edition)

Traction

Milestones

Annotation

Technology Readiness Level (TRL)
TRL NASA usage DoD usage[1][2][3] European Union Description
1 Basic principles observed and reported Scientific research begins to be translated into applied R&D Basic principles observed Lowest level of technology readiness. Scientific research begins to be translated into applied research & development (R&D). Examples might include paper studies of a technology’s basic properties.
2 Technology concept and/or application formulated Invention begins. Once basic principles are observed, practical applications can be invented Technology concept formulated Invention begins. Once basic principles are observed, practical applications can be invented. Applications are speculative, & there may be no proof or detailed analysis to support the assumptions. Examples are limited to analytic studies.
3 Analytical and experimental critical function and/or characteristic proof-of concept Active R&D is initiated. This includes analytical studies to produce code and laboratory studies to physically validate analytical predictions of separate technology HW/SW elements Experimental proof of concept Active R&D is initiated. This includes analytical studies & laboratory studies to physically validate the analytical predictions of separate elements of the technology. Examples include components that are not yet integrated or representative.
4 Component and/or breadboard validation in laboratory environment Basic technological components are integrated to establish that they will work together. System SW architecture development initiated to include interoperability, reliability, maintainability, extensibility, scalability and security issues Technology validated in lab Basic technological components are integrated to establish that they will work together. System concepts have been considered and results gathered from testing laboratory scale breadboards.This is relatively “low fidelity” compared with the eventual system. Examples include integration of “ad hoc” hardware in the laboratory.
5 Component and/or breadboard validation in relevant environment The basic technological HW/SW components are integrated with reasonably realistic supporting elements so that they can be tested in a simulated environment Technology validated in relevant environment (industrially relevant environment in the case of key enabling technologies) Fidelity of breadboard technology increases significantly. The basic technological components are integrated with reasonably realistic supporting elements so they can be tested in a simulated environment representative of specific stressing conditions or the relevant environment. Examples include “high-fidelity” laboratory integration of components.
6 System/subsystem model or prototype demonstration in a relevant environment (ground or space) Examples include testing a prototype in a high-fidelity lab environment or a live/virtual experiment or in a simulated operational environment Technology demonstrated in relevant environment (industrially relevant environment in the case of key enabling technologies) Representative model or prototype system, which is well beyond that of TRL 5, is tested in a relevant environment. Represents a major step up in a technology’s demonstrated readiness. Examples include testing a prototype in a high-fidelity laboratory environment or in a simulated operational environment.
7 System prototype demonstration in a space environment Prototype near, or at, planned operational system. Algorithms run on processor of the operational environment integrated with actual external entities. SW support structure in place. SW releases are in distinct versions. Frequency and severity of SW deficiency reports do not significantly degrade functionality or performance. Verification, Validation and Accreditation (VV&A) completed System prototype demonstration in operational environment Prototype near or at planned operational system. Represents a major step up from TRL 6 by requiring demonstration of an actual system prototype in an operational environment (e.g., in an air-craft, in a vehicle, or in space).System definition, operational environment definition, test plan, test data, design analysis and evaluationTest plan, test reports, test data.Testing setup in surrogate vehicle, test plan, test data, test results, M&S results, model vs. actual component or environmental differences, key modeling characteristics.
8 Actual system completed and "flight qualified" through test and demonstration (ground or space) Technology and SW has been proven and demonstrated to work in its final form and under expected conditions. In almost all cases, TRL represents the end of true system development. Examples include developmental test and evaluation (T&E) of the system in its intended weapon system to determine if it meets design specifications System complete and qualified Technology has been proven to work in its final form & under expected conditions. In almost all cases, this TRL represents the end of true system development. Examples include developmental test & evaluation (DT&E) of the system in its intended weapon system to determine if it meets design specifications.Final assembly first article inspection results.Key functions and design characteristics, test plan, test data, test results.System qualification results, test data, test results.
9 Actual system "flight proven" through successful mission operations In almost all cases, this is the end of the last “bugfixing” aspects of system development. Examples include using the system under operational mission conditions. SW releases are production versions and configuration controlled. Frequency and severity of SW deficiencies are at a minimum Actual system proven in operational environment (competitive manufacturing in the case of key enabling technologies; or in space) Actual application of the technology in its final form & under mission conditions, such as those encountered in operational test & evaluation (OT&E). Examples include using the system under operational mission conditions.Operational evaluation report.System level test results.OT&E report.

© 2025 U.S. DoD. AFRL TRL Calculator v2.2; James W. Bilbro, NASA, Marshall SFC.

Integration Readness Level (IRL)
IRL Definition Description Questions to Consider Suggested Evidence / Activities
1 Primary interfaces identified. High-level functions and interfaces with potential integration items (systems, subsystems, components) defined and understood. Are interfaces with potential integration items (systems, subsystems, components) and their functions defined/understood? A list and/or diagram of primary interfacing integration items (systems, subsystems, components) and their functions, Functional/physical architecture diagram
2 Basic characterization of primary interfaces performed. Interfaces qualitatively characterized with sufficient detail (inputs/outputs) to assess the feasibility of the proposed integration based on a high level CONOPs. Interface requirements and/or specifications defined/drafted. Are inputs/outputs of primary interfaces characterized and documented? Documented summary of inputs and outputs of primary interfaces or P-diagrams
Are primary interface requirements defined/drafted? Interface requirements document (e.g., Interoperability Profile [IOP], SAE J1939)
Is the high level CONOPS known/understood? High-level CONOPS
Have interface constraints (functional, physical, environmental, regulations, etc.) been defined? Defined constraints referencing ESOH, regulatory documentation, etc.
3 Interface details modeled. Interface design details modeled (using 2D/3D CAD, CAE, simulation, FEA, etc.) and documented as part of a quantitative analysis to verify compatibility. Interface diagrams completed. Typical TRL Mapping: Subsystem and interfacing subsystems have matured to at least TRL 3. Have interface design details been modeled and documented? 2D/3D CAD, CAE, simulation, FEA, etc. models and interface diagrams.
Have interface requirements been updated based on modeling details? Updated interface requirements document.
Has interface compatibility been verified through analysis? Modeling results to verify compatibility
4 Interfaces demonstrated to prove functionality in a low-fidelity environment. Functionality of integration items successfully demonstrated in a low-fidelity lab or synthetic environment.  Form, fit, and function constraints identified. Initial interface/integration performance evaluated. Typical TRL Mapping: Subsystem and interfacing subsystems have matured to at least TRL4. Has integration functionality (modules/functions/assemblies) been successfully demonstrated in a low-fidelity lab or synthetic environment? Lab report of demonstrated functionality
Have data transport method(s) and specifications been defined? Interface Control Document (ICD)
Have interface requirements been updated based on the functionality demonstration? Updated interface requirements document
Are overall system requirements for interaction with end users known/baselined? System requirements document
Have interface requirement evaluation/test methods and acceptance criteria been established? Listing of performance metrics and evaluation method, compliance matrix template, etc.
Have assembly instructions been developed? Have assembly instructions been developed?
5 Interfaces demonstrated to prove functionality in a high-fidelity environment. Functionality of integration items successfully demonstrated in a high-fidelity environment. Interface models validated. Typical TRL Mapping: Subsystem and interfacing subsystems have matured to at least TRL 5. Has integration functionality (modules/functions/assemblies) been successfully demonstrated in a high fidelity environment? Lab report of demonstrated functionality
Have interface models been validated through testing/analysis in a high fidelity environment? Model correlation based on test results
Have interface requirements/specifications been updated based on the functionality demonstration? Updated interface requirements document
Has an Interface Control Document (ICD) been developed? Interface Control Document (ICD)
6 Interfaces demonstrated to prove functionality in a relevant environment. Functionality and compatibility of integration items successfully demonstrated under the most stressing aspects of the operational environment. Typical TRL Mapping: Subsystem has matured to at least TRL 6.

Typical Milestone Alignment: Successful completion of system-level vendor testing.

Has integration functionality and compatibility (modules/functions/assemblies) been successfully demonstrated in a relevant environment (to at least threshold requirements)? Interface test plan with test acceptance criteria, Integrated system demonstration test results
Have all interface requirements been verified through testing and/or analysis in a relevant environment? Interface requirements compliance matrix
Have corrective actions for non-compliant test results been developed? Non-compliant interface requirements and corrective actions, Failure Mode & Effects Analysis (FMEA)
7 Interfaces demonstrated to prove functionality in an actual or simulated operational environment. Fully integrated prototype subsystem successfully demonstrated in an actual or simulated operational environment (full spectrum of operational conditions) in a representative system or the actual system.  Typical TRL Mapping: Subsystem has matured to at least TRL 7.

Typical Milestone Alignment: Successful completion of developmental test & evaluation (DT&E).

Has the fully integrated prototype subsystem been successfully demonstrated in a representative system or the actual system in an actual or simulated operational environment? Interface test plan with test acceptance criteria, Fully integrated system demonstration/ developmental test results
Have all interface requirements been verified through testing and/or analysis in an actual or simulated operational environment? Interface requirements compliance matrix
Have corrective actions for non-compliant test results been developed? Non-compliant interface requirements and corrective actions
8 Subsystem integration qualified in an actual operational environment. Early production level system (to include all subsystems and interfaces) successfully demonstrated and qualified in an actual operational environment. Typical TRL Mapping: Subsystem has matured to at least TRL 8.

Typical Milestone Alignment: Successful completion of at least DT&E or operational test & evaluation (OT&E). Low Rate Initial Production (LRIP) systems available.

Has the early production level system (to include all subsystems and interfaces) been successfully demonstrated and qualified in an actual operational environment? Interface test plan with test acceptance criteria, Early production level system demonstration test results
Have test results, anomalies, deficiencies, and corrective actions been documented? Interface requirements compliance matrix, Non-compliant interface requirements and corrective actions
9 Subsystem integration with the actual system completed and ready for Full Rate Production (FRP). Fully integrated system fielded with all interfaces demonstrating operational effectiveness, suitability, and safety in the operational environment. System proven to be operational in actual or simulated mission conditions (during OT&E event). Written concurrence of system integration performance provided by the user. Typical TRL Mapping: Subsystem has matured to TRL 9.

Typical Milestone Alignment: Initial Operating Capability (IOC) or Post FRP decision.

Has a fully integrated LRIP system demonstrated operational effectiveness and suitability in the operational environment? Operational effectiveness and suitability test results
Do interface failure rates meet system reliability requirements? Reliability testing results
Has the user provided written concurrence/acceptance of system performance? Concurrence memo (informal), Materiel Release (formal), etc.

© 2024 U.S. DoD. DAC/GVSC IRL Working Group; supersedes 2011 DAC/GVSC IRLs.

Commercial Customer Readiness Level (CCRL)
CCRL Definition Description Example
1 Initial assumptions about general market needs The startup is forming initial assumptions about general market needs, beginning to conceptualize where its product or service could fit within a broader market. This stage involves high-level market analysis, often leading to a preliminary business model. Imaginary Co. is assessing the demand for eco-friendly packaging materials across various industries, intending to identify market gaps and customer preferences.
2 Identification of specific market requirements At this stage, the startup identifies specific requirements of the market, structuring its product development to meet these needs. Tailoring the offering to meet market demands becomes a priority. TechWidget Inc. has conducted a survey to understand specific health monitoring needs and features that consumers desire in a wearable device, and is analyzing these insights to inform its product development plans.
3 Initial feedback from the market obtained The startup is gathering initial feedback from the market, engaging in early conversations with potential customers to refine its product offering. This feedback loop helps to adjust the product development to better suit market demands. BioExplore LLC is presenting its disease detection prototype at trade shows and medical conferences, collecting feedback from practitioners to enhance its relevance and usability.
4 Validation of the market opportunity by multiple customers The startup secures validation from multiple potential customers, establishing that there is a market opportunity for its product. This validation is often critical for moving towards the development of a marketable product or service. GreenDwell Homes is showcasing its eco-home concepts at sustainable living expos and has received positive feedback from multiple real estate developers interested in green construction.
5 Confirmed interest from a beachhead market and established connections to potential customers Confirmed interest from a beachhead market has been established, with the startup making significant connections with potential customers. This level signifies a more focused and deliberate approach to entering the market. EduTech Solutions has received endorsements from several school districts for its educational software after successful pilot programs demonstrating improved student engagement.
6 Product's value verified through partnerships or initial customer trials The startup's product value has been verified through partnerships or initial customer trials, confirming that the offering has genuine traction in the market. This stage often leads to fine-tuning product-market fit and preparing for a broader roll-out. VirtualEvents Platform has partnered with two major conference organizers for virtual event hosting, validating its platform's capabilities and user experience.
7 Customers engaging in comprehensive product trials or initial purchase tests The startup's product is being adopted by early customers through comprehensive trials or initial purchase tests. These engagements are critical for understanding product performance in real-world scenarios and can lead to iterative product enhancements. Cloud Secure Inc.'s cybersecurity solutions are undergoing extensive trial by a Fortune 500 company, providing crucial insights into enterprise-level security needs and product refinements.
8 First products purchased with escalating business development and sales The startup has achieved initial sales and is escalating its business development efforts, which often includes ramping up production and sales teams. This level demonstrates a proof-of-revenue and a foundation for scalable growth. DataAI is experiencing its first wave of product purchases by healthcare providers and is now expanding its sales force to capitalize on its growing reputation in the big data analytics sector.
9 Extensive and scalable product sales At this level, the startup enjoys extensive and scalable product sales, indicating a successful market penetration and the establishment of a robust customer base. This is often the phase where processes and supply chains are optimized for wide-scale distribution. GreenMobility has widespread adoption of its electric vehicle sharing platform, with scalable sales across major cities, and is implementing enhancements to its app to support global user demand.

© 2024 Massachusetts Institute of Technology (MIT). All Rights Reserved. Authored by: Keselman and Murray

Mission Customer Readiness Level (MCRL)
MCRL Definition Description Example
1 Initial awareness of mission stakeholders; potential for dual-use identified The startup is just beginning to gain awareness among mission stakeholders, understanding the potential dual-use of its product or technology in mission applications alongside commercial use. Initiating outreach to potential mission-focused clients is key at this level. Imaginary Co. is seeking to engage with environmental agencies to see if their eco-friendly packaging solutions can be used in mission-critical applications, such as disaster relief efforts where sustainable materials are valued.
2 Preliminary assessments of utility determined; business development resources applied to mission context The startup has carried out preliminary assessments of how their product or service could be beneficial in a mission context, getting ready to apply business development resources towards these opportunities. TechWidget Inc. is exploring how its wearable health devices could be adapted for military use, conducting initial assessments to understand the specific needs of soldiers in field operations.
3 Formal meetings and engagements with end users and sponsors; focusing in on capability use cases Formal meetings and engagements with potential end-users and sponsors help the startup refine its understanding of mission-specific use cases, evolving their product design and features to address unique mission requirements. BioExplore LLC is engaging in formal meetings with government health agencies to refine its disease detection technology based on specific use cases and operational requirements of national health missions.
4 Alignment of capability with specific mission needs; identification of potential modifications needed The startup's product or technology has been recognized for alignment with specific mission needs but may require modifications. Attention is now focusing on how to adapt their solution for the mission environment. GreenDwell Homes is working with non-governmental organizations in disaster zones to determine how their sustainable housing can meet the unique demands of rapid- deployment shelters.
5 Collaboration on refining the capability; mission input on design, features, and operational integration Collaboration with mission users has intensified to refine the capability of the product, incorporating mission input into design, features, and operation. This usually entails collaborative development with input from the mission side to ensure suitability. EduTech Solutions is collaborating with international educational missions to ensure their software meets the diverse needs of global classrooms, especially in regions with limited resources.
6 Commitment from mission stakeholders; letters of intent or preliminary agreements indicating serious interest Commitment from mission stakeholders has been obtained, with letters of intent or preliminary agreements indicating serious interest. The startup's product is progressing towards an integrated solution for the mission organization. VirtualEvents Platform has received letters of intent from several emergency response organizations interested in utilizing its platform for training and simulation purposes.
7 Evaluations and validation of the capability fit within mission Evaluations and validations of the startup's product within various missions have been successful, showing the capability fits well within the mission aims. This level of readiness escalates the potential for formal adoption as the product or service is considered for integration into mission systems or operations. CloudSecure Inc. is in the final stages of product validation with a national security agency, proving that their cybersecurity tools meet the rigorous standards required for mission-critical systems.
8 Formal adoption of the capability; integration into mission systems, training, or doctrine The startup's technology or service has formally been adopted; it's now being integrated into mission systems, training, or doctrine. This stage represents a significant milestone as the product becomes an official part of the mission's operational toolkit. DataAI's analytics platform has been integrated into a defense intelligence system, contributing to data-driven mission planning and operation after formal adoption by the defense department.
9 Standard issue or widespread deployment across multiple units or platforms The product has become standard issue or is seeing widespread deployment across multiple units or platforms, becoming a common tool within the mission's operational environment. It signifies full-scale acceptance and integration of the product in the mission context. GreenMobility has achieved a major success with its electric vehicles being adopted as the standard transportation option at numerous military installations, enhancing operational efficiency and supporting the mission's sustainability objectives.

© 2024 Massachusetts Institute of Technology (MIT). All Rights Reserved. Authored by: Keselman and Murray

Manufacturing Readness Level (MRL)
MRL A - Technology and Industrial Base B - Design C - Cost & Funding D - Materials (Raw Materials, Components, Subassemblies and Subsystems) E - Process Capability & Control
1 Global trends in emerging industrial base capabilities identified. Hypotheses developed for cause-effect relationships between technology variables and producibility. Hypotheses developed regarding technology impact on affordability. New material properties and characteristics surveyed and identified for research (e.g., manufacturability, quality). Modeling and simulation approaches/tools identified to support manufacturing and quality activities.
Global trends in manufacturing science and technology identified (i.e., concepts, capabilities). Current capability deficiencies and gaps identified. Initial manufacturing and quality costs identified. Global trends for material availability, obsolescence, and DMSMS surveyed and identified for research. Hypotheses developed regarding cause-effect relationships between process variables and process stability and repeatability.
2 Potential industrial base capability gaps identified. Studies performed to test hypotheses regarding cause-effect relationships between technology variables and producibility. Elements identified which have a potential impact to producibility (i.e., materials, processes, capabilities, limitations). Cost model approach defined. Potential effects of new material properties on design application manufacturability and quality predicted based on research. Modeling and simulation in development initiated.
Potential manufacturing science and technology gaps identified. Analyses performed to evaluate the feasibility of potential solutions to address capability gaps. Potential manufacturing and quality cost drivers and system affordability gaps identified. Material availability, obsolescence, and DMSMS gaps identified. Studies performed to test hypotheses regarding cause-effect relationships. Initial process approaches identified.
3 Industrial base capabilities for potential sources identified for system concepts. System concept elements evaluated for manufacturability and producibility using experiments, modeling, and simulation. Manufacturing cost estimates for system concepts developed. Initial cost models developed which include high-level process steps and materials. Effects of new material properties on design concept manufacturability and quality validated using experiments and models. Manufacturing and quality gaps for system concepts identified using modeling and simulation.
Manufacturing technology requirements identified to address potential capability gaps for system concepts. High level performance, lifecycle, and technical requirements defined and evaluated for system concepts. Trade-offs in design options based on experiments and initial MOEs. Analyses conducted to refine manufacturing and quality cost drivers, risks, and development strategy (e.g., lab to pilot to factory). Potential cost reduction and system affordability gap closure strategies identified. Material availability, obsolescence, and DMSMS gap closure strategy defined. Cause-effect relationships between process control variables and process stability and repeatability validated through laboratory experiments. Critical process control variables identified.
4 Industrial base including capacities and capabilities surveyed for preferred materiel solution, key technologies, components, and/or key processes. Industrial base considerations included in AoA with capability risks and issues documented in the AS. Initial producibility and manufacturability assessments in selection of preferred materiel solution completed. Results considered in AoA documented in AS key components/technologies. Cost estimates refined based on anticipated production volumes associated with preferred materiel solution. Cost model updated with identified cost drivers (i.e., process variables, manufacturing, materials, and special requirements). Cost driver uncertainty quantified. Cost model supports AoA and ASR. New materials and components for preferred materiel solution demonstrated in a laboratory environment. Production modeling and simulation tools utilized to define manufacturing and quality requirements for preferred materiel solution. Modeling and simulation results considered in the AoA.
Manufacturing technology development initiatives defined for preferred materiel solution. Manufacturing technology development requirements considered in the AoA. Form, fit, and function constraints, and manufacturing capabilities identified for preferred systems concept. SEP and T&E Strategy recognize the need for the establishment/validation of manufacturing capability and management of manufacturing risk for the product lifecycle. Initial KPPs identified for preferred systems concept. System characteristics and measures to support required capabilities identified. Producibility and lifecycle cost risks and issues assessed for preferred materiel solution. Initial cost analysis supports AoA and ASR. Projected lead times identified for all difficult to obtain, difficult to process, or hazardous materials. Quantities and lead times estimated. Material availability risks and issues including DMSMS for preferred materiel solution considered in AoA. Mitigation plans incorporated in SEP for the preferred system concept. Maturity of critical processes for preferred materiel solution assessed.Process capability requirements and improvement plans developed and documented in the SEP.
5 Industrial base analysis initiated to identify potential manufacturing sources. Sole/single/FOCI sources identified and planning initiated to minimize risks. Producibility and manufacturability assessments of key technologies and components initiated. Ongoing design trades consider manufacturing processes and industrial base capability constraints. Manufacturing processes assessed for capability to be tested and verified in production. Manufacturing processes assessed for influence on O&S. Prototype components produced in a production relevant environment, or simulations drive end-to-end cost models. Cost model includes materials, labor, equipment, tooling/STE/SIE, setup, yield/scrap/rework, WIP, and capability/capacity constraints. Materials manufactured or produced in a prototype environment (may be in a similar application/program). Maturation efforts in place to address new material production risks for technology demonstration. Initial modeling & simulations (product or process) developed at the component level and used to determine constraints.
Required manufacturing technology development efforts initiated. Lower level performance requirements sufficient to proceed to preliminary design. All enabling/critical technologies and components identified and the product lifecycle considered. Evaluation of the design for KCs initiated. Product data required for prototype component manufacturing released. Costs analyzed using prototype component actuals to ensure target costs are achievable. Decisions regarding design choices, make/buy, capacity, process capability, sources, quality, KCs, yield/rate, and variability influenced by cost models. Availability risks and issues addressed for prototype build. Significant material risks including DMSMS identified for all materials. Planning initiated to address scale-up issues. Process Maturity assessed on similar processes in production. Process capability requirements identified for pilot line, LRIP and FRP.
6 Industrial base (IB) analysis including capacity and capability for MS B completed. Industrial capability in place to support manufacturing of development articles. Plans to avoid or justification of sole/single/FOCI IB sources complete. Producibility assessments and producibility trade studies (performance vs. producibility) of key technologies/components completed. Results used to shape AS, SEP, manufacturing and producibility plans, and planning for EMD or technology insertion programs. Preliminary design choices assessed against manufacturing processes and industrial base capability constraints. Producibility enhancement efforts (i.e., DFM, DFA, etc.) initiated. Cost model updated with design requirements, material specifications, tolerances, IMS, results of system/subsystem simulations and production relevant prototype demonstrations. Material maturity verified through technology demonstration articles. Preliminary material specifications in place. Material properties adequately characterized. Initial modeling & simulations developed at the sub-system or system level, and used to determine system constraints.
Manufacturing technology efforts continuing. Required manufacturing technology development solutions demonstrated in a production relevant environment. System allocated baseline established. Product requirements and features are well enough defined to support PDR. Product data essential for subsystem/ system prototyping has been released, and all enabling/critical components have been prototyped. Preliminary KCs for the design identified and mitigation plans initiated. Costs analyzed using prototype system/sub-system actuals to ensure target costs are achievable. Cost targets allocated to subsystems. Cost reduction and avoidance strategies developed. Manufacturing cost drivers for "Should-Cost" model provided. Availability risks and issues addressed to meet EMD build. Long-lead items identified. Components assessed for future DMSMS risk. Manufacturing processes demonstrated in production relevant environment. Collection or estimation of process capability data from prototype build and refinement of process capability requirements initiated.
7 Industrial base capacity and capability to support production analyzed. Justified Sole/single/FOCI industrial base sources assessed and monitored. Detailed producibility trade studies using knowledge of key design characteristics and related manufacturing process capability completed. Producibility enhancement efforts (i.e., DFM, DFA, etc.) ongoing. Manufacturing processes re-assessed as needed for capability to be tested and verified. Manufacturing processes re-assessed as needed for potential influence on O&S. Cost model updated with the results of systems/sub-systems produced in a production representative environment, production plant layout and design, and obsolescence solutions. Material maturity sufficient for pilot line build. Material specifications approved. Modeling & simulations used to determine system constraints and to identify improvement opportunities.
Manufacturing technology efforts continuing. Required manufacturing technology development solutions demonstrated in a production representative environment. Product design and features are well enough defined to support CDR, even though design change traffic may be significant. All product data essential for component manufacturing released. Potential KC risks and issues identified with mitigation plans in place. Manufacturing costs rolled up to system/sub-system level and tracked against targets. Detailed trade studies and engineering change requests supported by cost estimates. Cost reduction and avoidance strategies underway. Manufacturing cost drivers for "Should-Cost" model updated. Availability risks and issues addressed to meet LRIP builds. Long lead procurements identified and mitigated. DMSMS mitigation strategies for components in place. Manufacturing processes demonstrated in a production representative environment. Collection and/or estimation of process capability data and refinement of process capability requirements ongoing and used to shape process improvement plans.
8 Industrial base capacity and capability analysis for MS C completed. Industrial capability is in place to support LRIP. Producibility improvements implemented on system. Known producibility risks and issues managed for LRIP. Cost model updated with results of pilot line build. Materials proven and validated during EMD as adequate to support LRIP. Material specifications stable. Modeling & simulations verified by pilot line build. Results used to improve process and demonstrate that LRIP requirements can be met.
Primary manufacturing technology efforts concluding. Improvement efforts continuing. Required manufacturing technology solutions validated on a pilot line. Detailed design of product features and interfaces completed. All product data essential for system manufacturing released. Design change traffic does not significantly impact LRIP. Costs analyzed using pilot line actuals to ensure target costs are achievable. Manufacturing cost analysis supports proposed changes to requirements or configuration. Cost reduction initiatives ongoing. Manufacturing cost drivers for "Should-Cost" model updated. Availability risks and issues managed for LRIP. Long lead procurement initiated for LRIP. Availability issues addressed to meet FRP builds. DMSMS mitigation ongoing. Manufacturing processes for LRIP verified on a pilot line. Process Capability data from pilot line meets target. Process capability requirements for LRIP and FRP refined based upon pilot line data.
9 Industrial base capacity and capability analysis for FRP has been completed and capability is in place to support start of FRP. Prior producibility improvements analyzed for effectiveness during LRIP. Producibility risks and issues discovered in LRIP managed for FRP. FRP cost model updated with result of LRIP build. Materials controlled to specifications in LRIP. Materials proven and validated as adequate to support FRP. Modeling & simulations verified by LRIP build, assist in management of LRIP, and demonstrate that FRP requirements can be met.
Manufacturing technology process improvements efforts initiated for FRP. Major product design features and configuration are stable. System design has been validated through operational testing of LRIP items. PCA or equivalent complete as necessary. Design change traffic is limited. LRIP cost goals met and learning curves analyzed with actual data. Cost reduction initiatives ongoing. Touch labor efficiency analyzed to meet production rates and elements of inefficiency are identified with plans in place for reduction. Long lead procurement initiated for FRP. Availability risks and issues managed for FRP. DMSMS mitigation ongoing. Manufacturing processes are stable, adequately controlled, capable, and have achieved program LRIP objectives. Variability experiments conducted to show FRP impact and potential for continuous improvement.
10 Industrial base analysis capacity and capability supports FRP and includes support for modifications, upgrades, surge and other potential manufacturing requirements. Design producibility improvements demonstrated in FRP. Process producibility improvements ongoing. All modifications, upgrades, DMSMS and other changes assessed for producibility. Cost model validated against actual FRP cost. Materials controlled to specifications in FRP. Modeling & simulations verified by FRP build. Production simulation models used as tools to assist in management of FRP.
Manufacturing technology continuous process improvements ongoing. Product design is stable. Design changes are few and generally limited to those required for continuous improvement or in reaction to obsolescence. FRP cost goals met. Cost reduction initiatives ongoing. All material availability risks and issues managed. DMSMS mitigation ongoing. Manufacturing processes are stable, adequately controlled, capable, and have achieved program FRP objectives.

MRL1, MRL2, MRL3 - Pre-Materiel Development Decision (Pre-MDD).

MRL4 - Materiel Solution Analysis (MSA). Alternative System Review (ASR).

MRL5, MRL6 - Technology Maturation and Risk Reduction (TMRR). System Requirements Review / System Functional Review (SRR/SFR). Production Readiness Review (PDR).

MRL7, MRL8 - Engineering & Manufacturing Development (EMD). Critical Design Review (CDR). Production Readiness Review / System Verification Review (PRR/SVR).

MRL9 - Low-Rate Initial Production (LRIP). Production Configuration Audit (PCA).

MRL10 - Full-Rate Production (FRP).


© 2025 U.S. DoD. DoD Manufacturing Readiness Levels (MRLs). MRL Criteria Matrix v2025 R1. Effective as of 8 July 2025.

Commercial Funding Readiness Level (CFRL)
CFRL Definition Description Example
1 Exploring potential funding avenues, including bootstrapping and pre-seed funding. The startup is identifying potential avenues for funding, exploring whether to bootstrap or pursue pre-seed investment to take the initial steps in its business journey. At this level, the focus is on market research and developing the business concept. Imaginary Co. is developing a concept for an eco-friendly packaging solution and is researching local angel investors and making a list of “family and friends” for initial funding while refining its business plan.
2 Actively seeking pre-seed or angel investors for initial milestones The startup is actively seeking early financial backers such as pre-seed or angel investors to support achieving key early milestones such as minimal viable prototype (MVP) development. This level shows a move from concept to initial action and actual fundraising. TechWidget Inc. has a prototype for a wearable health monitor and is pitching to angel investor networks to fund its market validation study.
3 Pre-seed or angel funding secured to continue market exploration With pre-seed or angel funding secured, the startup is actively engaged in market exploration and beginning product development. This early injection of funds is used to validate assumptions and prepare for further financial rounds. BioExplore LLC has secured angel funding to develop its first laboratory-based prototype for rapid disease detection and is conducting initial market assessments.
4 Seed funding being pursued for initial product development and market validation The startup is in the process of pursuing seed funding, which is essential for product development and initial market validation efforts. At this point, the company aims to demonstrate the viability of its product to attract further investment. GreenDwell Homes is seeking seed investment to build sustainable tiny home models and validate the market through a pilot project in three cities.
5 Seed funding round completed; positioning for future funding with defined milestones and growth objectives Having completed a seed funding round, the startup is working on achieving predefined milestones and growth objectives to pave the way for larger investments. There is an operational product and initial market traction at this level. EduTech Solutions has completed its seed funding round and is focused on increasing its user base and proving its educational software’s efficacy to attract Series A funding.
6 Series A funding being actively targeted to scale operations and market presence The startup targets Series A funding to scale its operations and expand its market presence. Successful reaching of Series A would reflect market validation and investor confidence in the business model. VirtualEvents Platform is targeting Series A funding to expand its online event hosting capabilities and grow its customer base internationally.
7 Series A funding secured; planning for Series B to further scale and possibly enter new markets The startup plans for Series B funding after securing Series A, which means it's preparing to scale up further, improve existing products, and possibly explore new markets. This reflects a level of success and stability where the business has proven its model and is ready for aggressive growth. CloudSecure Inc. has leveraged its Series A to gain a foothold in the cybersecurity market and is preparing a Series B round to finance expansion into new regions and develop additional security services.
8 Series B (or later stages) funding secured; continuous assessment of future funding needs With Series B funding secured, the startup enters a phase of accelerated growth, focusing on scaling its business operations and assessing ongoing funding requirements. It represents a mature startup with a significant customer base, driving towards becoming a market leader. DataAI, a machine learning analytics firm, after closing its Series B, is scaling its operations and enhancing its technology stack to meet the growing demand for big data solutions in the healthcare sector.
9 Scaling, market expansion and strategic investment with a focus on exit The startup is in an advanced growth phase with potential market leadership, possibly exploring strategic investments, mergers, and acquisitions, or even preparing for public listing. At this stage, the startup is a well-established player with a sustainable, scalable business. GreenMobility, an electric vehicle sharing service, is expanding globally and exploring strategic partnerships or an IPO as it becomes a dominant player in the urban mobility sector.

© 2024 Massachusetts Institute of Technology (MIT). All Rights Reserved. Authored by: Keselman and Murray

Mission Funding Readiness Level (MFRL)
MFRL Definition Description Example
1 Exploring a dual-use funding strategy The startup is exploring a dual-use strategy, where it considers opportunities for its technology in both commercial and mission-driven applications. This phase involves researching possible mission partnerships and funding sources like government grants or contracts. Imaginary Co., while focusing on eco-friendly packaging solutions for commercial use, is also investigating defense applications for lightweight, durable materials and potential government funding for R&D.
2 Identification of first phase funding sources, such as innovation grants or R&D programs Identification of funding sources for initial phase projects is underway, such as innovation grants or R&D programs, to support the startup's mission-related product or technology development. TechWidget Inc. is identifying government and private grant programs that could finance further development of its health monitoring wearable for use in remote patient monitoring for military personnel.
3 Application(s) submitted to secure first phase funding and mission partnership opportunities The startup has applied to secure first-phase funding and is actively seeking partnerships with mission-focused organizations to support and guide its product development for mission use. BioExplore LLC has submitted proposals for government grants to further its rapid disease detection technology for bio-surveillance missions and is seeking partnerships with public health agencies.
4 Award(s) of first phase non-dilutive funding from mission-driven organizations The startup has been awarded its first phase of non-dilutive funding from mission-driven organizations, marking a transition from the planning to execution phase in its mission strategy. GreenDwell Homes has received an innovation grant for the development of sustainable living modules that can be used for rapid deployment in disaster relief missions.
5 Continued dual-use strategy while securing procurement relationships with funded mission partners The startup continues its dual-use strategy, securing procurement relationships with funded mission partners. This level involves more in-depth collaboration to align the product with mission requirements. EduTech Solutions is working closely with education-focused NGOs to deploy its software in underserved regions, aligning with both commercial objectives and educational missions.
6 Application(s) submitted for follow-on grant or award phases; at least one deep partnership with mission user After submitting applications for follow-on grant or award phases, the startup has at least one deep partnership with a mission user. This stage confirms the potential fit of the startup's product within mission-driven programs. VirtualEvents Platform is applying for additional funding to enhance its platform for training simulations for emergency response teams after establishing a key partnership with a national disaster response organization.
7 Award(s) of follow-on phases of funding and progress in securing enduring pathways into mission production The startup has secured follow-on phases of funding, demonstrating progress in establishing enduring pathways into mission production, which can lead to a viable long-term contract or integration into mission programs. CloudSecure Inc. has advanced to the next phase of funding for its cybersecurity solutions after proving its value in pilot programs with a government agency, moving towards becoming a regular part of the agency's security infrastructure.
8 Substantial investment from late-phase mission procurement partner for continued development The startup has received significant investment from late-phase mission procurement partners for continued development. This investment helps in fine-tuning the product for mission-specific needs and paves the way for formal adoption. DataAI has secured a substantial contract from a defense contractor for its analytics platform, to be tailored for intelligence gathering and analysis, marking a critical step towards integration into national defense systems.
9 Long-term funding secured through production contracts or integration into the mission budget With long-term funding secured through production contracts or integration into the mission budget, the startup's product becomes part of the standard issue or sees widespread deployment across multiple units or platforms within the mission context. GreenMobility's electric vehicle sharing technology has been adapted and integrated into military bases around the country for efficient, on-demand transportation, backed by a multi-year contract with the Department of Defense.

© 2024 Massachusetts Institute of Technology (MIT). All Rights Reserved. Authored by: Keselman and Murray

Product-Market Fit

More Details in the Community

If you’d like to see not only aggregated data but also in-depth content, including detailed discussions on a wide range of topics related to user cases and technologies, join the discussion by clicking the link below. Invitation for new users

Research & Development

Roadmap

redirect Main Article: Public:Dataroom

Investment Rounds Goals

Time Period Round Amount Goals (Project A + Project B)
Q2 2026 Seed $4,000,000
  • [TRL 6] MVPα
  • [TRL 7] MVPβ
Q4 2026 Series A $16,000,000
  • [TRL 8] MMPδ
  • Low-Rate Initial Production (LRIP)
Q2 2027 Series B $32,000,000
  • [TRL 9] MMPγ
  • Proving ground testing
  • Pilots, V&V product, PMF
  • Full-Rate Production (FRP)
Q2 2028 Series C $85,000,000
  • [MRL 10] MMPγ
  • FRP scaling (full robotic assembly)

Development Teams (Project A and B)

Design Development & Architecture [A]: Ada Lovelace[4] Team

Concept & Product Design, Requirements, Safety-by-design, Architecture, V&V, Demo, Industrial Design

Mechanical Engineering [M]: Stephanie Kwolek[5] Team

Product Design, Mechanical Engineering, Aerospace Engineering, Mechatronics, CAD Modeling, Robotic System Design, Motion Control, Engineering Simulation, Computational Fluid Dynamics (CFD), Heat Transfer / Thermal Simulation, Thermal Mapping, Structural Simulation, Multi-Physics Simulation, Control Systems Design, Aerodynamic Analysis, Thermodynamics, Prototyping, CNC Machining, Design for Assembly (DFA), Design for Manufacturing (DFM)

Aerospace Engineering [F]: Amelia Earhart Team

Flight Systems, GNC, Control Laws, HIL/SIL Simulation, Flight Test Campaigns, Autonomous Flight Test, Mission Rehearsal, Telemetry Review, Risk Management, Flight Safety, Flight Training System, Interceptor Mission System, Target Tracking, Cargo Logistics Mission System, Route Economics, Aerial Firefighting Mission System, Dispatch Integration

Optical Engineering [O]: Katharine Blodgett[6] Team

Optical Engineering, Optical System Design, Lens Design, Lens PVD Coating Design, Physical Vapor Deposition (PVD), Optomechanical Design, Photonic Systems, Laser Systems, EO/IR Payloads, Imaging Chain, Optical Stabilization, Calibration, Beam Conditioning, Pointing / Tracking Optics, Contamination Control

Electronics Engineering [E]: Ida Hyde[7] Team

Electronics Engineering, PCB Design, PCB Layout, Electronic Circuit Design, Schematic Capture, High Density Interconnect (HDI), SPICE Simulation, Embedded Systems, Microcontroller Programming, Near-End / Far-End Crosstalk (NEXT/FEXT), DFM/EMI Review, SI/PI/EM, Z0 Matching, Low CTE Design, EMI/EMC, EMI/ESD, High Frequency Structure Simulation, IPC Class 3, Detailed FAB Drawing, Pick‑and‑Place files, Power Management, Thermal Management, Power Architecture, Control Electronics, Avionics, Power Distribution, Sensor Interfaces, Telemetry, Health Monitoring

Software Development [R]: Hedy Lamarr[8] Team

Radio Engineering, RF Architecture, RF Generation, SDR/TRX Chains, Secure Links, Radar Front-End Integration, Fractal Antenna, Multiband Operation Antenna, Highly Directional Antenna, AESA, Radar Detection, Passive Radar, SAR / InSAR, SIGINT and Sensing RF Chains, Spectrum Coexistence, Software Defined Radio, Networks, Remote Control, FSOC, ADS‑B, ADS-C, TIS‑B, FIS‑B, Digital Twin Integration, APS, VPS and HFD Apps

Software Development [S]: Grace Hopper[9] Team

Flight Software, Sensor Fusion, Autonomy Integration, Mode Logic, Fault Handling, Simulation-to-Flight Data Loop, System-level Diagnostics, Inertial Navigation System (INS), Maps, GNSS, Air Signal System (ASS), IMU, Health Monitoring, EGPWS/TAWS, TCAS/ACAS, CI/CD, OTA Update, System Integration, DevSecOps

Software Development [T]: Evelyn Berezin[10] Team

Human-Machine Interface, Workflow Automation, Safety & Cybersecurity, C2 / Aegis Integration, Workgroups, Tasks, Mission Management, Briefing / Debriefing Support, Redundant Computing, Partitioning, Fault-tolerant Flight Modes, Logging, Educational Content Generation, Knowledge Base Automation

Software Development [I]: Barbara Askins[11] Team

AI/ML Platforms, Autonomy, AI/DL, AI/NLP, AI/ANN, EO/IR Fusion Software, Multi-Sensor Fusion, Signal Processing, Computer Vision, Computer Audition, SAR/InSAR Signature Detection, Detection / Classification / Tracking, Anomaly Detection, Onboard Inference Pipelines

Networking [N]: Margaret Hamilton[12] Team

Expert Networking, Mentor Relations, Cloud / Edge Sync, Mesh & Relay Data Links, Secure Logging, Fleet Team Connectivity, Collaboration Infrastructure, Identity / Access Control, Artifact Management, Pitches, Updates

Customer & Business Development [C]: Barbara Liskov[13] Team

Customer Discovery, Partner Development, Procurement Mapping, Investor Relations, GTM Management, DoD challenge/RFI work, Pilot Customer Support, Demo Planning, Market Validation, Flight Readiness Review, Compliance Documentation, Supply Chain, Vendor Management, Export Control, Cost-Down Strategy, LRIP/FRP Readiness, Production Scaling, Quality Supply Assurance

Roadmap in Simple Terms

Executive Summary

This roadmap outlines the staged development, validation, and industrialization of a dual-use aerial platform and associated systems intended for military, emergency response, logistics, and infrastructure support applications. It combines deep engineering work across aerodynamics, electromechanics, avionics, software, sensors, communications, and production automation into a coherent, de-risked program structure.

The plan is organized into four main phases (Concept, Development, Validation & Verification, Production) with explicit decision gates, plus several cross-cutting tracks (customer and market development, funding, team building). Each phase produces tangible technical, regulatory, and commercial outcomes, while progressively reducing technology, integration, certification, and manufacturing risks. The ultimate goal is to deliver a scalable, certifiable, and economically viable platform family that can be deployed rapidly across multiple high-impact use cases.

Phase 1: Concept (Completed / Ongoing)

Core Ideas & Solutions

  • Investigation of problems and root causes of inefficiency in existing solutions
  • Research of physical, engineering, and operational requirements
  • System architecture and principles of operation
  • Electromechanical, aerodynamic, and sensing elements
  • Communication, control elements, and interfaces
  • Modular platform architecture with hot-swappable and functional modules
  • Ground infrastructure elements
  • Options for military use, aerial firefighting, and logistics
  • Materials and constraints enabling automated and robotic manufacturing
  • Constraints and limitations for development, production, and operation
  • Risk taxonomy: technology, development, safety, environmental, manufacturing, IP, economics, regulation, competition
  • Economic feasibility analysis
  • Historical analysis of similar technology development programs
  • Failure analysis of similar and dissimilar technologies, with lessons learned on advantages and limitations
  • Software architecture, execution hardware, interfaces, and mechanisms
  • User case identification and development across all planned use scenarios
  • Certification pathway definition (civil, military, and dual-use where applicable)
  • IP landscape review and freedom-to-operate assessment

Hypotheses

  • Ability to solve the target problems with significant advantage over existing technologies and methods
  • Feasible integration with existing systems and between subsystems
  • Robust passive and active safety mechanisms
  • Consistency of the concept with known physical laws and sound engineering practice
  • Sufficient performance margins to constitute a technological breakthrough and attract investment
  • Long-term effectiveness under climate, industrial, military, geopolitical, and innovation dynamics
  • Operational acceptability of conditions and constraints for effective use
  • System reliability in both military and civilian applications
  • System reliability under adverse weather and environmental conditions
  • Feasibility of developing the system within the planned timelines
  • Manufacturability, operating cost, total cost of ownership, pricing, and ROI for operators
  • Potential for product evolution and modernization over multiple generations
  • Scalability of production and rapid adaptation to rarer or niche use cases
  • Required resources, team, time, and investment can be realistically secured

Concept Validation

  • Development of analytical models and digital twins
  • Engineering calculations across key subsystems
  • Validation of physics and engineering models through virtual simulation and known references
  • Comparative assessments with expert input and external benchmarks
  • Identification of vulnerabilities and critical design drivers to be addressed in development
  • Technology readiness gate reviews (e.g., TRL 1 → 2 → .. → 9 criteria)
  • Preliminary hazard analysis and early safety case framing
  • Stakeholder feedback loops and incorporation of external expert reviews

Market & Customer Validation

  • Early customer discovery in military, firefighting, civil protection, and logistics segments
  • Use case prioritization based on operational pain points and willingness to adopt
  • Non-binding commitments such as letters of intent or memoranda of understanding where feasible
  • Competitive positioning and differentiation strategy relative to legacy platforms and emerging concepts

Phase 2: Development

Program Management & Governance

  • Seed-round fundraising to expand the team and secure development resources
  • Program charter and milestone-based governance structure
  • Integrated master schedule (IMS) and basic earned-value tracking for major work packages
  • Configuration management and change-control processes across hardware and software
  • Centralized risk register with mitigation actions, owners, and review cadence

Development Prioritization

  • Definition of MVP / MMP stages and mapping to TRL, IRL, MRL, CCRL, MCRL, CFRL, MFRL progression
  • Release planning and prioritization of platform variants and options
  • Dependency management across mechanical, electrical, software, and integration tracks
  • Decision gates between readiness levels, including peer review and customer validation where possible

Mechanical Structures & Interfaces

  • DFM / DFA / FEA for headset components and add-ons (software-defined antenna, SCBA integration, external aramid cover, continuous wind capture impellers, auto tourniquets, Care Under Fire set, handheld metal re-radiation radar, optional DMFC power supply, digital sight) and associated injection molds
  • DFM / DFA / FEA for rigid structural elements: frame, gondola, interfaces, modules, and mounting hardware
  • DFM / DFA / FEA for gas envelopes, aerostatic offloading and stabilization, and external aerodynamic shapes
  • Material selection and qualification testing, including strength, fatigue, corrosion, and fire performance
  • Environmental stress screening concepts (temperature, humidity, vibration, shock, dust, icing, etc.) for key assemblies

Electromechanical & Mechanical Systems

  • DFM / DFA / FEA for diesel engine, high-voltage alternators, and variable-frequency electric motors; auxiliary current transformers, compressors, and pumps
  • DFM / DFA / FEA for hydraulic drives of propulsion system consoles and gondola transformer mechanisms
  • DFM / DFA / FEA for hydraulic cylinders, quick-disconnect couplings, transformers, and gear trains
  • DFM / DFA / FEA for propellers, hubs, hydraulic pitch-change mechanisms, limiters, feathering systems, impellers, feedback systems, and hybrid cooling arrangements

Sensor Systems

  • DFM / DFA / FEA for headset sensors
  • DFM / DFA / FEA for flight and navigation sensors: inertial navigation system (INS), global navigation satellite system (GNSS), barometric altimeter, air data system, true and magnetic heading, IMU (gyroscopes and accelerometers), additional attitude sensors (roll / pitch / yaw), payload sensing
  • DFM / DFA / FEA for powerplant sensors: air, oil, and fuel pressure sensors; fuel flow meters; temperature sensors for oil and coolant circuits; engine speed sensors; shaft and equipment vibration; combustion and exhaust pressure sensors
  • DFM / DFA / FEA for gas envelope and gas management sensors: pressure, flow, and temperature sensors
  • DFM / DFA / FEA for environmental and aerodynamic sensors: air pressure and temperature, angle of attack (alpha sensors, Pitot-static), sideslip angle (beta sensors, Pitot-static), icing, humidity, and precipitation
  • DFM / DFA / FEA for landing gear and landing systems sensors: gear position sensors, brake system pressure sensors, brake wear sensors, landing load sensors
  • DFM / DFA / FEA for fuel system sensors: fuel level sensors, fuel pressure and temperature sensors, fuel flow sensors
  • DFM / DFA / FEA for avionics and control sensors: thrust vector control position sensors (engine console tilt and extension, impeller angle), fan position, linear speed and angular acceleration sensors, door and hatch position sensors
  • DFM / DFA / FEA for safety and warning sensors: radar altimeter, terrain awareness and warning systems (EGPWS / TAWS), collision avoidance systems (TCAS / ACAS), obstacle detection, fire and smoke detectors
  • DFM / DFA / FEA for external sensors: onboard radar (weather radar, severe weather modes, surveillance radar), airborne LIDAR, electro-optical and infrared stereo cameras (EO / IR), remote sensing and reconnaissance sensors (spectrometers, hyper- and multispectral cameras)
  • DFM / DFA / FEA for auxiliary control and navigation sensors: ultrasonic altitude sensors, optical flow sensors (GNSS-denied environments), magnetometers and magnetic field compensators, electrostatic field sensors for gas chambers
  • DFM / DFA / FEA for power and motor control sensors: speed, current, voltage, frequency, temperature, and vibration monitoring

Communication Systems

  • DFM / DFA / FEA for Rx / Tx radio communications, telemetry, flight plan uplink/downlink, and aircraft health reporting in HF, DL‑VHF / VHF, UHF, C‑band, 5G FR1 / FR2 / FR3, LTE, NTIA MSS SatCom, Ku / Ka‑band
  • DFM / DFA / FEA for ACARS‑SAT and Link‑2000+
  • DFM / DFA / FEA for tactical data links (Link‑16, Link‑22, TDL) and radio-relay systems (RTX)
  • DFM / DFA / FEA for signal triplication and frequency-hopping communications
  • DFM / DFA / FEA for free-space optical communication channels (FSOC)
  • DFM / DFA / FEA for subscriber signal tracking and digital beam steering of highly directional antennas
  • DFM / DFA / FEA for dynamic encryption systems
  • DFM / DFA / FEA for Mode‑S, ADS‑B, and ADS‑C
  • DFM / DFA / FEA for TIS‑B and FIS‑B (Traffic / Flight Information Service‑Broadcast)

Control Systems

  • Software bundles for tactical situational awareness (see separate description)
  • Flight Control System (FCS):
    • eVTOL dynamics modeling and parameterization
    • Flight control law design (FCL)
    • Powerplant and thrust vector control (TVC) algorithms
    • Control modes: Manual, Assisted, Autopilot, Full Autonomy
    • Protected and limited authority control modes
  • Guidance, Navigation & Control (GNC):
    • Navigation core development (INS / GNSS / air-data fusion, optical flow, SAR / InSAR signatures)
    • Navigation algorithms for eVTOL in urban, low-altitude, and complex terrain environments
    • ADS‑B, TCAS, EGNSS / GBAS integration
    • Mission layer and route-planning algorithms
  • Health Monitoring & Self-Test:
    • Telemetry acquisition and processing software
    • Built‑In Test (BIT / BITE) architecture
    • Health Monitoring System (HMS)
    • Degradation modes, redundancy management, and fault logging (FDR-like functionality)
  • Safety & Cybersecurity:
    • Software development and verification according to DO‑178C / DO‑331 and ARP‑4754 / 4761
    • Fault-tolerant architecture (redundant computing, partitioning, safety-critical separation)
    • Degraded flight modes (engine-out, loss-of-thrust, loss-of-control, safe landing / “minimum risk” modes)
    • Integration of safety systems (collision avoidance, EGPWS, separation management)
    • Cybersecurity for airborne and ground software
  • Common lifecycle and infrastructure tasks:
    • Software architecture and module responsibility split (low-level flight control, GNC core, mission management, autopilot, HMI / SDK, BMS, security, logging)
    • Model-based development (e.g., SCADE, UML, Simulink) for control laws, autopilot, navigation, and MIL / HIL testing
    • DevSecOps and CI / CD with automatic testing, verification, configuration management, and OTA updates
    • Ground tools and infrastructure for debugging and testing (eVTOL flight simulators, HIL benches, debug and monitoring GUIs, syntactic and functional test tools)
  • Operator Training & Simulation:
    • High-fidelity simulators for pilots and operators
    • Scenario-based training for military, firefighting, and logistics missions

Cross-Disciplinary Engineering for Options (High-Level)

The following option packages are developed in parallel as modular capabilities:

  • A‑CSG: EMALS STOL and eVTOL catapults, arresting gate, safety and handling systems
  • AEW&C radar (AESA / PESA, multi-band HF / VHF / UHF / S / L with SAR / InSAR, APS, VPS, HFD applications)
  • HEL system (high-energy pulsed laser with OPCPA, large-aperture optics, adaptive optics and beam control)
  • HPM system (high-power microwave with phased array, pulsed power generation, beam steering and targeting)
  • Aerial firefighting multi-role package (monitoring, suppression, evacuation support, flood and earthquake response, emergency logistics, agricultural and drought mitigation scenarios)
  • Cargo and heavy-lift logistics package (liquid and container cargo, multimodal operations, heavy and oversized payloads, including rigid vertical coupling up to 720 k lb)
  • Drone Hunter interceptor package (kinetic and non-kinetic counter‑UAS, including “Flying Shotgun” variant)

Each option follows the same pattern: concept, detailed design, DFM / DFA / FEA, integration, test, and certification or qualification as applicable.

Integration & System Testing

  • Hardware‑in‑the‑Loop (HIL) rigs for flight control, propulsion, power, and avionics
  • Software‑in‑the‑Loop (SIL) and continuous integration pipelines for embedded software
  • Integrated ground testing for propulsion, avionics, communications, and payloads
  • Environmental testing (climatic chambers, vibration, shock, dust, icing)
  • EMI / EMC compliance testing and mitigation design loops

Supplier & Partner Development

  • Identification and qualification of suppliers for critical components and materials
  • Co‑development partnerships for sensors, propulsion, materials, and software where appropriate
  • Supply chain risk analysis and dual‑sourcing strategies
  • Quality assurance agreements and incoming inspection procedures

Regulatory Engagement

  • Pre‑application meetings with civil aviation authorities (e.g., FAA, EASA) where in scope
  • Clarification of certification basis and special conditions for novel concepts
  • Incremental submission of data packages (design, safety assessments, test results)
  • Military airworthiness coordination for defense variants

Intellectual Property Strategy

  • Patent filings for core inventions and platform-level innovations
  • Identification and protection of trade secrets and know‑how
  • Ongoing freedom‑to‑operate monitoring
  • Licensing strategy for dual-use components and subsystems

Phase 3: Validation & Verification

V&V Program

  • System-level test and evaluation master plan
  • Digital twin testing and correlation against ground and flight data
  • Physical prototype testing at multiple scales (1:20, 1:10, 1:5, 1:2, 1:1)
  • Ground-based flight simulation and iron-bird testing
  • Incremental flight test campaign with progressive envelope expansion
  • Mission-representative flight testing for key use cases (military, firefighting, logistics)
  • Certification testing and demonstration of compliance with applicable standards
  • Reliability demonstration testing and statistical confidence build-up
  • Operational data collection in pilot deployments
  • Customer acceptance testing and operational evaluation
  • Safety case consolidation and submission to authorities

Pilot Production Preparation

  • Design and build of pre‑production representative units (LRIP prototypes)
  • First Article Inspection (FAI) and conformity assessment
  • Manufacturing process refinement based on pilot builds
  • Supplier production readiness reviews and process capability checks
  • Validation of tooling, fixtures, and test equipment

Phase 4: Production

Business Process & Production System Design

  • End-to-end business process mapping with focus on automation and robotization of assembly and production
  • Design of internal and external logistics chains, including mitigation of forced downtime
  • Mapping of machines and mechanisms with adaptability for throughput changes, retooling, and maintenance windows
  • Design of auxiliary and support systems with adaptability to load and product mix changes
  • Facility layout design and requirements with reconfiguration and scaling in mind
  • Digital twins of all production processes and virtual stress tests (volume, mix, disruptions)
  • Lean manufacturing principles and continuous improvement culture (Kaizen, 5S, etc.)

Production Infrastructure

  • List and specification of machines and equipment, including automatic and robotic systems
  • PLC programming requirements for automation and robotized production lines
  • IoT device development requirements for comprehensive telemetry, synchronization, and control of the production complex
  • List of laboratory and testing processes for quality control and associated equipment
  • List of material resources and qualified suppliers
  • List of human resource requirements, including qualification profiles and training plans
  • Requirements for production certification, including safety, environmental protection, and energy efficiency
  • Workplace safety, ergonomics, and human–machine interface standards

Low-Rate Initial Production (LRIP)

  • Initial production run (e.g., tens of units per year depending on variant)
  • Cost and schedule performance tracking and feedback into design and process optimization
  • Design-for-manufacturing and value-engineering loops based on real production data
  • Supplier performance monitoring and refinement of contracts and SLAs
  • Certification authority oversight and demonstration of production conformity

Full-Rate Production (FRP)

  • Production ramp-up plan and capacity milestones
  • Triggers for capacity expansion and associated CAPEX planning
  • Multi-site manufacturing strategy where justified by demand and risk profile
  • Export control and compliance (e.g., ITAR / EAR and national regimes) for defense variants

After-Sales & Support

  • Maintenance, repair, and overhaul (MRO) infrastructure and processes
  • Spare parts strategy, inventory, and distribution network
  • Technical support and training programs for operators and maintainers
  • Field service and rapid-response capability for critical operators (military, firefighting, critical infrastructure)
  • Product lifecycle management and obsolescence planning
  • Upgrade paths and technology refresh strategy for deployed fleets

Continuous Improvement

  • Monitoring of production KPIs and Overall Equipment Effectiveness (OEE)
  • Periodic supply chain performance reviews and resilience assessments
  • Structured customer feedback loops feeding into product and process roadmaps
  • Cost reduction initiatives (design-to-cost, design-to-value, process optimization)

Cross-Cutting Tracks (Across All Phases)

Customer & Market Development

  • Sales pipeline development and key account management
  • Demonstrator and evaluation unit deployments with early adopters
  • Co‑creation of operational concepts with lead customers
  • Contract negotiation support, including leasing and service-based models
  • Market expansion across geographies and vertical segments
  • Brand building, technical thought leadership, and ecosystem engagement

Funding & Investor Relations

  • Planning of investment rounds (Seed, Series A, B, C) aligned with technical and commercial milestones
  • Financial modeling of CAPEX, OPEX, and unit economics for different deployment models
  • Cap table and governance structure management
  • Investor reporting, board updates, and data room maintenance
  • Exploration of grants and non-dilutive funding (e.g., defense innovation programs, EU frameworks)

Team Building & Organization

  • Roadmap for key hires in engineering, operations, certification, business development, and support
  • Evolution of organizational structure as program complexity grows
  • Compensation and equity planning to attract and retain top talent
  • Culture and values development with emphasis on safety, ethics, and mission focus

Critical Path

The critical path consists of tightly coupled workstreams whose delays directly impact time to deployment and revenue:

  • Completion and validation of core physical and system models (aerodynamics, structures, propulsion, power, GNC) sufficient to freeze the baseline architecture.
  • Development and verification of flight-critical software and control laws (FCS, GNC, safety & redundancy) to a maturity level suitable for experimental flight.
  • Integration of propulsion, power, and flight control into a stable, testable iron-bird and subsequent flying prototypes.
  • Early and continuous engagement with certification authorities to agree on the certification basis and acceptable means of compliance for a novel platform.
  • Execution of the incremental flight test campaign required to demonstrate safety, performance, and mission effectiveness in representative environments.
  • Establishment of a production-ready supply chain for critical components (propulsion, energy storage, structural elements, avionics, sensors) with sufficient quality and capacity.

All other activities (options, extended mission packages, advanced payloads) are scheduled to avoid blocking this critical path and can be shifted or parallelized without endangering initial fielding.

Capital Efficiency

The roadmap is designed to maximize information gained per unit of capital and to concentrate resources on de‑risking the core platform before scaling spend:

  • Early phases emphasize modeling, simulation, and digital twins to eliminate infeasible concepts before committing to expensive tooling and full-scale hardware.
  • Scaled prototypes (1:20, 1:10, 1:5, 1:2) are used to validate key physical assumptions and control strategies at lower cost and lower risk than immediate full-scale builds.
  • Option packages (AEW&C, HEL, HPM, Drone Hunter, advanced firefighting, heavy cargo) are treated as modular overlays that can follow the core platform with staged investment and customer co‑funding.
  • Supplier partnerships and COTS components are leveraged wherever possible without compromising safety or mission performance, reducing NRE and lead time.
  • LRIP is used to drive down manufacturing risk and unit cost before committing to FRP tooling and capacity, with clear go / no‑go gates tied to technical and commercial traction.

Non-dilutive funding sources (defense innovation contracts, grants, joint development programs) are pursued to co‑finance the most capital-intensive technology blocks. This combination of staged technical de‑risking, modular options, and progressive industrialization is intended to keep the program financeable for private investors while still targeting a fundamentally hard, infrastructure-level problem.

Appendix: Cross-Disciplinary Engineering for Options (Low-Level)

This appendix describes the low‑level engineering work required for the key option packages. Each option follows the same pattern: detailed concept definition, low‑level design, DFM / DFA / FEA, integration into the base platform, V&V, and (where applicable) certification or qualification.

A‑CSG: EMALS STOL and eVTOL Catapults, Arresting Systems, Onboard Safety and Handling

Structural, Mechatronic, and Interface Elements

  • Design of structural beams, rails, and support frames for catapult and arresting systems, including static and dynamic load analysis for launch and recovery cycles.
  • Mechanical interface design between catapult carriage and eVTOL / STOL UAS (hardpoints, locking mechanisms, fail‑safe release systems).
  • Design of shock absorbers, energy absorbers, and damping systems for carriage and arresting components.
  • Structural integration with decks, runways, or dedicated launch platforms, including foundations and vibration isolation.

Sensors for Control and Monitoring

  • Position sensors for carriage and launch rails (linear encoders, travel limit switches, proximity sensors).
  • Speed and acceleration sensors for carriage and payload (IMUs, high‑rate encoders, accelerometers).
  • Position and tension sensors for arresting ropes, braking systems, and energy absorbers.
  • Pressure and flow sensors for hydraulic subsystems.
  • Health monitoring sensors for structural fatigue, vibration, and temperature in critical nodes.

Linear Electromagnetic Drive Components

  • Design of linear electromagnetic motor modules (stator segments, mover/armature) for EMALS‑type launch systems.
  • Electromagnetic modeling of force profiles, efficiency, and thermal behavior under repeated launch cycles.
  • Design of power electronics (inverters, converters) for controlled current and voltage profiles in linear drive modules.
  • Cooling systems for linear drive modules (liquid or forced‑air, manifold design, temperature sensors).
  • Modularization of linear drive segments for maintainability, redundancy, and flexible launch stroke length.

Hydraulic Control Elements

  • Hydraulic power units (pumps, accumulators, valves) for arresting gear, locking mechanisms, and adjustable structures.
  • Hydraulic cylinders, servo‑valves, and manifolds for moving gates, safety barriers, and positioning systems.
  • DFM / DFA / FEA of hydraulic components for repeated high‑load cycles and exposure to harsh environments.

Control Software Modules

  • Pre‑launch inspection and readiness software (self‑test of EMALS, hydraulics, sensors, and safety interlocks).
  • Launch control software: trajectory planning for acceleration and deceleration profiles; closed‑loop control of linear drive and carriage position.
  • Position control and synchronization of moving parts (carriage, clamps, arresting gates, ropes).
  • Real‑time monitoring of tension, speed, acceleration, and position; dynamic adjustment for wind, load mass, and deck motion.
  • Safety logic and emergency functions: abort sequences, controlled deceleration in case of power loss, fault isolation, and safe fallback states.

AEW&C: Radar, APS, VPS, and HFD Applications

Antenna and AESA / PESA Module Design

  • AESA panel design with element‑level T/R modules based on multi‑turn spiral or fractal antennas with wideband characteristics.
  • Integration of controllable phase shifters, GaN HFET power amplifiers, low‑noise amplifiers, and attenuators into compact T/R modules.
  • DFM / DFA of RF front‑ends for high power density, thermal management, and environmental robustness.
  • Digital Beamforming (DBF) modules for element‑level and subarray‑level beamforming, supporting multi‑beam and 4D scanning.

RF and Microwave Hardware

  • T/R module design: power amplifier (PA‑GaN), LNA, phase shifter, attenuator, Tx/Rx switch, and protection circuitry.
  • RF distribution network: corporate feed structures, power dividers/combiners, directional couplers, duplexers, and band‑select filters.
  • Local oscillator (LO) and frequency synthesizer chains for stable, low‑phase‑noise references across HF/VHF/UHF/S/L‑bands.
  • Waveguide and coaxial transitions, thermal design for high‑power RF paths, and EM shielding for platform integration.

Computing Stack and FPGA / SoC

  • MIMO front‑end design with integrated Tx, high‑speed ADC, DSP, and MCU / SoC on a single board or module.
  • Selection and integration of high‑speed ADC / DAC components for IF/RF sampling.
  • Implementation of NPU / GPU accelerators for high‑throughput signal processing and real‑time tracking.
  • FPGA / SoC firmware for timing distribution, beamforming, channel calibration, and deterministic low‑latency control.

Core Radar Software

  • Waveform generator: support for pulsed and phase‑coded signals, LFM chirps for SAR / InSAR, pulse‑Doppler and high‑definition radar modes.
  • Range and Doppler processing: matched filtering, FFT in range and Doppler, Doppler filtering banks, CFAR detection.
  • Clutter suppression and compensation for atmospheric and multipath effects.
  • Beamforming software: element‑level and array‑level DBF for 4D scanning, multi‑beam operation, and adaptive beam shaping.
  • Track‑While‑Scan (TWS) and multi‑target tracking (MTT) using Kalman‑type and PHD filters, including support for slow, small, and group targets.

SAR / InSAR Processing

  • SAR image formation algorithms (Range‑Doppler, Omega‑K, Back‑Projection) for different motion and geometry regimes.
  • InSAR processing modules for phase difference extraction between multiple SAR passes or channels.
  • Error compensation and calibration for motion errors, platform dynamics, atmospheric phase noise, and geometric distortions.

APS, VPS, and HFD Modules

  • APS: airspace and air traffic surveillance, UTM / U‑space integration, and conflict detection for dense airspace.
  • VPS: vehicle protection and SHORAD / C‑UAS processing, including threat classification and engagement support.
  • HFD (Hybrid / Fusion & Decision‑Support): fusion of radar, EO/IR, and other sensors; threat evaluation; and decision support logic.

Monitoring, BITE, and Health Management

  • Built‑In Test and calibration routines for antenna arrays and T/R modules.
  • Continuous self‑calibration for gain/phase drift and RF front‑end health.
  • Telemetry and logging of key radar performance and health parameters.

Integration and Interfaces

  • Interfaces to combat management systems (e.g., Aegis‑type architectures), C2 networks, and UTM systems.
  • APIs and data formats for integrating external sensors (EO/IR, navigation, LIDAR, meteorological sensors).
  • Synchronization with navigation systems for precise georeferencing and track handover.

HEL System: High-Energy Laser (Ti:Sapphire / Nd:YAG + OPCPA)

Seed and Front-End

  • Design of seed laser oscillator with chirped pulse output optimized for OPCPA injection.
  • Stabilization of wavelength, pulse duration, and repetition rate for consistent amplification.
  • Front‑end pulse shaping and pre‑compensation for nonlinear propagation effects.

Stretcher Block

  • Grating‑based pulse stretcher design using diffraction gratings and optical fiber or free‑space delay lines.
  • Control of chirp, spectral bandwidth, and temporal stretching ratio.
  • Thermal stability and alignment mechanisms for long‑term operation.

Pump Laser Chain

  • Nd:YAG pump stages with appropriate cavity designs for high‑energy pulsed operation.
  • Pump lamp (e.g., xenon flashlamp) banks, power conditioning, and lifetime management.
  • Cooling systems for Nd:YAG rods, pump lamps, and associated optics.

OPCPA Amplification Stage

  • Optical Parametric Chirped Pulse Amplification (OPCPA) chain using nonlinear crystals (BBO, LBO, KDP and derivatives).
  • Phase‑matching design for target wavelength, gain, and bandwidth.
  • Management of walk‑off, thermal loading, and crystal damage thresholds.
  • Pump–signal synchronization, timing jitter control, and optical isolation.

Ti:Sapphire Amplifier Chain

  • Ti:sapphire amplifier stages (single‑pass or multi‑pass) for further pulse energy scaling.
  • Crystal mounting, cooling (including water or cryogenic options), and stress management.
  • Pump coupling optics and spatial beam shaping for uniform gain.

Compressor Block

  • Large‑aperture reflective grating compressor design for recompression to femtosecond or picosecond durations.
  • Control of dispersion, residual chirp, and higher‑order phase terms.
  • Mechanical stability and alignment control for high‑energy pulses.

Beam Delivery and Large-Aperture Optics

  • Large‑aperture beam delivery system (e.g., ~2750 mm effective aperture) with adjustable focus from ~100 m to ~100 km.
  • Mirror and aspheric lens subsystem with aberration compensation.
  • Configurable optical trains (Mersenne‑type, Cassegrain‑type) for near‑field and far‑field engagement modes.
  • Multilayer PVD optical coatings for high fluence, environmental stability, and specific spectral bands.

Target Engagement and Control

  • Target‑tracking rack integrating radar, EO/IR sensors, and laser rangefinders.
  • Mission planning and logging rack for engagement scenarios, shot logging, and after‑action analysis.
  • Algorithms for dwell time, spot placement, and power on target given atmospheric conditions.

Power Conversion and Lamp Driver Subsystems

  • Conversion from ~2 MW AC to ~8 MW DC for pump and lamp driver systems.
  • High‑power supply design with filtering, surge protection, and redundancy.
  • Lamp driver controls with programmable pulse profiles and protection logic.

Control, Diagnostics, and Safety

  • Lamp‑driver control and synchronization with seed and pump stages.
  • Beam diagnostics: measurement of beam profile, wavefront, focal spot, pulse duration, and energy (autocorrelator, FROG, M² cameras, pyro‑sensors).
  • Safety systems against over‑power, self‑lasing, and optical damage (fast shutters, beam dumps, interlocks).
  • Automatic shutdown and fault‑management logic for abnormal operating conditions.

Control & Software Subsystem

  • Optical path modeling and optimization software (beam propagation, filamentation, turbulence effects, focus management).
  • Mode control (energy, repetition rate, focal length, engagement profiles).
  • Adaptive optics control loops (wavefront sensors, deformable mirrors, real‑time correction algorithms).
  • Logging, configuration management, and performance trending over time.

Hybrid Cooling System

  • Hybrid cooling for mirrors, lenses, prisms, and resonator components (e.g., LN2‑assisted systems).
  • Design of cryogenic loops, insulation, and monitoring for safe and stable operation.

HPM System: High-Power Microwave (1.18 GW / 155 J / 5 µs, 53 dBi)

Power and Energy Subsystems

  • AC power intake (e.g., ~640 kW), distribution panels, transformers, ATS, and load switching systems.
  • Electromagnetic compatibility (EMC) filters for high‑power switching transients.
  • Energy storage system design (capacitor banks, pulse‑forming networks) sized for required pulse energy.
  • High‑voltage pulsed modulators (Marx generators, PFNs, solid‑state switches using IGBT / MOSFET / SiC devices).
  • Individual or grouped modulators for sub‑arrays, including redundancy and fault isolation.

RF Sources and Amplification Chain

  • Reference oscillator and waveform generator for stable frequency and phase control.
  • Frequency synthesizer / PLL design for coarse and fine tuning over target bands.
  • Low‑power RF chain: drivers, pre‑amplifiers (GaN / GaAs), and shaping of pulse envelopes (chirp, PRF variation).
  • High‑power amplification using klystrons or alternative vacuum RF devices.
  • Waveguide networks between amplifiers and radiating array elements, including loads, circulators, isolators, and directional couplers.
  • Measurement of VSWR and reflected power, with automatic protection when loads are detuned or mismatched.

Antenna Array and Beamforming

  • Phased array of radiating elements (e.g., TEM horns, waveguide radiators) with high gain (~53 dBi).
  • Phase shifters and amplitude controllers for electronic beam steering and beam shaping.
  • Calibration routines for mutual coupling, array pattern control, and sidelobe management.
  • Mechanical platform for azimuth / elevation pointing, integrated with servo drives, position encoders, and inertial sensors.

Control, Synchronization, and Software

  • Fire‑Control Unit (FCU) as the high‑level control element: HMI, safety interlocks, weapon employment logic, and scenario management.
  • Algorithms for selecting exposure patterns (time, power, frequency sweep) based on target type and mission constraints.
  • Synchronization of RF and digital timing signals across modulators, klystrons, and phase shifters.
  • Beam steering and shaping software, including multi‑beam modes and dynamic power management vs distance (FSPL compensation).
  • HPM Health Management: monitoring of all HV circuits, temperatures, SF6 pressure, vacuum in klystrons, capacitor health, and early degradation indicators.

Protection, EMC, and Thermal Management

  • High‑voltage insulation systems with SF6 or alternative media, including leak detection, safety handling, and environmental controls.
  • Electromagnetic shielding of the host platform and co‑located electronics against self‑interference.
  • Thermal management for klystrons, modulators, pre‑amplifiers, and antenna panels (liquid cooling loops, compressors, heat exchangers, radiators).
  • Mechanical design for shock, vibration, and operational robustness.


Targeting, Sensing, and Integration

  • Cueing from radar, EO/IR, and ESM/ELINT sensors for target detection and tracking.
  • Tracking filters (Kalman and variants) for target state estimation and engagement planning.
  • Battle Damage Assessment (BDA) based on telemetric feedback and target signatures.
  • Communication interfaces (Ethernet, MIL‑STD‑1553, CAN, SERDES) and cybersecurity measures.
  • Command and event logging for post‑mission analysis and safety compliance.

High-Level Software

  • Operator console (HMI) for wide‑area soft‑kill, localized hard‑kill, and diagnostic modes.
  • Scenario “playbook” software for different target types (UAS swarms, missiles, aircraft, ground vehicles, sensors, communications nodes, stratospheric / LEO assets).
  • Offline simulation tools for field modeling, atmospheric effects, multi‑bounce propagation, and typical EMC vulnerabilities.

Aerial Firefighting & Rescue Multi-Role Package

Wildfire and Large-Scale Fire Scenarios

  • Continuous monitoring concepts with EO/IR, LIDAR, and meteorological sensors.
  • High‑pressure sprinkler and atomization systems for fine‑particle water and retardant dispersal.
  • Modular tanks and pumps for water, foams, and chemical agents; rapid refilling mechanisms.
  • Formation flight / tethered operation of multiple units (e.g., chains of 4 units) for containment lines.
  • Water uptake systems from surface sources (lakes, rivers, sea), including robotic ladder or hose support.

Search and Rescue Scenarios

  • Robotic aerial ladder / travelator concepts for evacuation from high‑rise buildings, flood zones, and confined “fire traps”.
  • Configurations for maritime rescue (distressed vessels, open water), mountain rescue, and animal evacuation from forest zones.
  • Integration of GPR and other sensors for void detection under rubble during earthquake response.
  • Lighting and power modules for night operations and disaster site illumination.

Flood and Earthquake Response

  • High‑capacity water pumping modules for floodwater removal.
  • Rapid deployment of temporary bridges and crossings using modular structural elements and lifting systems.
  • Aerial crane configurations for moving heavy loads and lifting debris.

Emergency Response and Logistics

  • Power supply modules for emergency power to critical infrastructure.
  • Cargo and relief logistics modules for isolated or damaged regions.

Agricultural and Drought Mitigation

  • Spraying systems for liquid fertilizers, pesticides, and other treatments.
  • Night‑time emergency soil moisture restoration via artificial precipitation or irrigation patterns.

Cargo and Heavy-Lift Logistics

Liquid and Container Cargo

  • Tank modules for crude oil, petroleum products, chemicals, and LNG, including insulation and safety measures.
  • Container handling systems for standard container units and specialized logistics modules.
  • Integration of loading/unloading systems for operation at sea (anchored vessels) and remote terminals.

Multimodal and Oversized Cargo

  • Interfaces for multimodal transport (rail, road, sea) and direct ship‑to‑platform loading.
  • Suspension and rigging systems for oversized cargo, including dynamic load compensation.

Heavy and Super-Heavy Loads

  • Structural and mechanical design for rigid vertical couplings up to ~720 k lb total load.
  • Redundancy and safety systems in lifting lines, hooks, and coupling hardware.
  • Control algorithms for load stabilization in wind and turbulent conditions.

Drone Hunter Interceptor Package

Concept and Validation

  • Detailed concept of operations (CONOPS) for drone interception and counter‑UAS missions.
  • Concept validation through simulation, digital twins, and controlled range tests.

Electromechanical Systems and Interfaces

  • Airframe optimization for interception profile (eVTOL tiltrotor with nose‑down engagement configuration and high agility).
  • Mounts and recoil management for kinetic payloads (e.g., “Flying Shotgun” configuration, 12‑gauge 3‑inch magnum, dual 18‑round cylinder feed).
  • Mechanical and safety interlocks for weapon deployment and stowage.

Sensor Systems

  • EO/IR sensor suite for detection, tracking, and identification of small UAS.
  • Laser rangefinder for precise distance measurement and ballistic solution input.
  • Integration of radar or RF‑based detection (where applicable).

Communication Systems

  • Highly directional multi‑band communication antennas with beam steering capability.
  • Frequency‑hopping, encrypted links for control and telemetry.
  • Integration with tactical data links and C2 networks for cueing and coordination.

Flight Control and Mission Management

  • Flight control laws tuned for aggressive maneuvering, hover and nose‑down attack positions, and horizontal transit.
  • Mission management logic: target acquisition, pursuit, engagement, disengagement, and return‑to‑base.
  • Rules of engagement and safety envelopes (no‑fire zones, abort criteria, collision avoidance).

V&V and Certification Program

  • V&V plan covering airworthiness, weapon safety, and mission safety aspects.
  • Range trials for interception scenarios, including live‑fire testing where applicable.
  • Airworthiness and certification/qualification activities in line with applicable military or civil standards.

Artifacts

Project A (Tactical Situational Awareness Headset)

  • Hardware Diagram

  • Hardware Architecture

SDR, SDR Scan, RDF, Radar Detection, IFF, Networks, Remote control

System Integration, DevOps, Maps, VBS, Sensors

IMS, Chat, Workgroups, Tasks, Mission planning

Computer Vision, Computer Audition, AI/ML, AI/DL, AI/NLP, AI/ANN

Development Teams (Project B)

Design Development & Architecture [A]: Ada Lovelace Team

Device design, GUI, VUI, Apps algorithms, Demos, Videos, Animations

  • Prio #1: Research and description of the principle of operation, description of the technology application, computer-added design, event-driven software architecture[14]
  • Prio #2: Technology functionality demo, specific functionality description, GUI demo, lab experimental setup

Mechanical Engineering [M]: Stephanie Kwolek Team

  • Prio #1: [TRL 5-6] Prototype: based on 3D print, vacuum casting, vacuum unfusion
  • Prio #2: [TRL 7] MVPα: vacuum casting, vacuum unfusion, injection moulding, manual assembly
  • Prio #3: [TRL 8] MVPβ: vacuum casting, vacuum unfusion, injection moulding, manual assembly
  • Prio #4: [TRL 9] MMPδ: manufacturing process automation, robotic assembly, add-ons (auto tourniquets, Care Under Fire set, SCBA integration, external aramid cover, continuous wind сapture impellers, software defined antenna, handheld metal re-radiation radar, optional battery, digital sight)
  • Prio #5: MMPγ: manufacturing & assembly & logistic process upgrade

Aerospace Engineering [F]: Amelia Earhart Team

  • Prio #1: [TRL 5-6] Prototype: based on 3D print, vacuum casting, vacuum unfusion
  • Prio #2: [TRL 7] MVPα: vacuum casting, vacuum unfusion, injection moulding, manual assembly
  • Prio #3: [TRL 8] MVPβ: vacuum casting, vacuum unfusion, injection moulding, manual assembly
  • Prio #4: [TRL 9] MMPδ: manufacturing process automation, robotic assembly, add-ons (auto tourniquets, Care Under Fire set, SCBA integration, external aramid cover, continuous wind сapture impellers, software defined antenna, handheld metal re-radiation radar, optional battery, digital sight)
  • Prio #5: MMPγ: manufacturing & assembly & logistic process upgrade

Optical Engineering [O]: Katharine Blodgett Team

Light guide, Beam splitting prisms, Dichroic mirror, Optical coatings, Fading pads

  • Prio #1: [TRL 5-6] Prototype: optical scheme, light guide, dichroic mirror, fading pads
  • Prio #2: [TRL 7] MVPα: beam splitting prisms for 3 cam sensors, optical coatings
  • Prio #3: [TRL 8] MVPβ:
  • Prio #4: [TRL 9] MMPδ:
  • Prio #5: MMPγ:

Electronics Engineering [E]: Ida Hyde Team

Schematics and PCBs for motherboard, projector, IFF Transponder, SDR, SDRS, PCSR, Digital sight

  • Prio #1: [TRL 5-6] Prototype: based on Raspberry Pi 5B, Texas Instruments DLPDLCR2000EVM
  • Prio #2: [TRL 7] MVPα: motherboard chipset Intel 700, Z790[15] or HM770[16], CPU Intel Core i7-14700HX[17][18], DLP PCB, SDRS PCB, IFF PCB
  • Prio #3: [TRL 8] MVPβ: SDR2 PCB, add-on (software defined antenna, optional battery, continuous wind capture impellers)
  • Prio #4: [TRL 9] MMPδ: add-on (auto tourniquets, Care Under Fire set, handheld metal re-radiation radar)
  • Prio #5: MMPγ: add-on (digital sight)

Software Development [R]: Hedy Lamarr Team

SDR, SDR Scan, RDF, Radar Detection, IFF, Networks, Remote control

Software Development [S]: Grace Hopper Team

System Integration, DevOps, Maps, VBS, Sensors

Software Development [T]: Evelyn Berezin Team

IMS, Chat, Workgroups, Tasks, Mission planning

Software Development [I]: Barbara Askins Team

Computer Vision, Computer Audition, AI/ML, AI/DL, AI/NLP, AI/ANN

Networking [N]: Margaret Hamilton Team

Mentor Relations, Pitches, Updates

  • Prio #1: Mentor Relations, Updates
  • Prio #2: Business angels (pre-seed round)
  • Prio #3: Business angels & Venture capital (seed round)
  • Prio #4: Venture capital (round A)
  • Prio #5:

Customer & Business Development [C]: Barbara Liskov Team

Requests, eMails, PR, Meetings

  • Prio #1: Innovation programs research, requests, eMails, meetings
  • Prio #2: Collaboration research, PR
  • Prio #3: Proving ground testing
  • Prio #4: Pilot programms

Future ideas

Further reading

FAQ

See also

Public External Sections: Public Wiki Sections: Public Wiki Sections: Not-Public Wiki Sections:

Note: Unless otherwise stated, whenever the masculine gender is used, both men and women are included.

See also product details

Hardware Details: Functional Apps Details: Executive Apps Details: Service Apps Details:


References

  1. Dr. John Niemela and Dr. Matthew Fisher, The Use of Technology Readiness Levels for Software Development
  2. TRL-IRL-SRL Definitions
  3. OUSD(R&E), Technology Readiness Assessment Guidebook, 2023
  4. Wikipedia, Ada Lovelace
  5. Wikipedia, Stephanie Kwolek
  6. Wikipedia, Katharine Burr Blodgett
  7. Wikipedia, Ida Henrietta Hyde
  8. Wikipedia, Hedy Lamarr
  9. Wikipedia, Grace Hopper
  10. Wikipedia, Evelyn Berezin
  11. Wikipedia, Barbara Askins
  12. Wikipedia, Margaret Hamilton
  13. Wikipedia, Barbara Liskov
  14. Cite error: Invalid <ref> tag; no text was provided for refs named :0
  15. Cite error: Invalid <ref> tag; no text was provided for refs named :1
  16. Cite error: Invalid <ref> tag; no text was provided for refs named :2
  17. Cite error: Invalid <ref> tag; no text was provided for refs named :3
  18. Cite error: Invalid <ref> tag; no text was provided for refs named :4