Public:Traction: Difference between revisions
No edit summary |
|||
| Line 1: | Line 1: | ||
{{further|1=[[Public:ARHUDFM Manifesto]],|2=[[Public:Graphical User Interface]],|3=[[Public:Applications]],|4=[[Public:DoD Pains]],|5=[[Public:ARHUDFM Features Summary]],|6=[[Public:Business Tables]],|7=[https://www.furtherium.com/ | {{further|1=[[Public:ARHUDFM Manifesto]],|2=[[Public:Graphical User Interface]],|3=[[Public:Applications]],|4=[[Public:DoD Pains]],|5=[[Public:ARHUDFM Features Summary]],|6=[[Public:Business Tables]],|7=[https://www.furtherium.com/p1 Deck "Tactical Situational Awareness Mobility Platform (Headset)"],|8=[https://www.furtherium.com/p2 Deck "Unmanned Airship Drone Platform" (aerospace & wildfire expert edition)],|9=[https://www.furtherium.com/p3 Deck "24/7 Airborne C-UAS Long-Range AI-driven Defense Platform" (military edition)]|10=}} | ||
==Traction== | ==Traction== | ||
Revision as of 11:00, 12 April 2026
→redirect Further information: Public:ARHUDFM Manifesto, Public:Graphical User Interface, Public:Applications, Public:DoD Pains, Public:ARHUDFM Features Summary, Public:Business Tables, Deck "Tactical Situational Awareness Mobility Platform (Headset)", Deck "Unmanned Airship Drone Platform" (aerospace & wildfire expert edition), Deck "24/7 Airborne C-UAS Long-Range AI-driven Defense Platform" (military edition)
Traction
Milestones
Annotation
| TRL | NASA usage | DoD usage[1][2][3] | European Union | Description |
|---|---|---|---|---|
| 1 | Basic principles observed and reported | Scientific research begins to be translated into applied R&D | Basic principles observed | Lowest level of technology readiness. Scientific research begins to be translated into applied research & development (R&D). Examples might include paper studies of a technology’s basic properties. |
| 2 | Technology concept and/or application formulated | Invention begins. Once basic principles are observed, practical applications can be invented | Technology concept formulated | Invention begins. Once basic principles are observed, practical applications can be invented. Applications are speculative, & there may be no proof or detailed analysis to support the assumptions. Examples are limited to analytic studies. |
| 3 | Analytical and experimental critical function and/or characteristic proof-of concept | Active R&D is initiated. This includes analytical studies to produce code and laboratory studies to physically validate analytical predictions of separate technology HW/SW elements | Experimental proof of concept | Active R&D is initiated. This includes analytical studies & laboratory studies to physically validate the analytical predictions of separate elements of the technology. Examples include components that are not yet integrated or representative. |
| 4 | Component and/or breadboard validation in laboratory environment | Basic technological components are integrated to establish that they will work together. System SW architecture development initiated to include interoperability, reliability, maintainability, extensibility, scalability and security issues | Technology validated in lab | Basic technological components are integrated to establish that they will work together. System concepts have been considered and results gathered from testing laboratory scale breadboards.This is relatively “low fidelity” compared with the eventual system. Examples include integration of “ad hoc” hardware in the laboratory. |
| 5 | Component and/or breadboard validation in relevant environment | The basic technological HW/SW components are integrated with reasonably realistic supporting elements so that they can be tested in a simulated environment | Technology validated in relevant environment (industrially relevant environment in the case of key enabling technologies) | Fidelity of breadboard technology increases significantly. The basic technological components are integrated with reasonably realistic supporting elements so they can be tested in a simulated environment representative of specific stressing conditions or the relevant environment. Examples include “high-fidelity” laboratory integration of components. |
| 6 | System/subsystem model or prototype demonstration in a relevant environment (ground or space) | Examples include testing a prototype in a high-fidelity lab environment or a live/virtual experiment or in a simulated operational environment | Technology demonstrated in relevant environment (industrially relevant environment in the case of key enabling technologies) | Representative model or prototype system, which is well beyond that of TRL 5, is tested in a relevant environment. Represents a major step up in a technology’s demonstrated readiness. Examples include testing a prototype in a high-fidelity laboratory environment or in a simulated operational environment. |
| 7 | System prototype demonstration in a space environment | Prototype near, or at, planned operational system. Algorithms run on processor of the operational environment integrated with actual external entities. SW support structure in place. SW releases are in distinct versions. Frequency and severity of SW deficiency reports do not significantly degrade functionality or performance. Verification, Validation and Accreditation (VV&A) completed | System prototype demonstration in operational environment | Prototype near or at planned operational system. Represents a major step up from TRL 6 by requiring demonstration of an actual system prototype in an operational environment (e.g., in an air-craft, in a vehicle, or in space).System definition, operational environment definition, test plan, test data, design analysis and evaluationTest plan, test reports, test data.Testing setup in surrogate vehicle, test plan, test data, test results, M&S results, model vs. actual component or environmental differences, key modeling characteristics. |
| 8 | Actual system completed and "flight qualified" through test and demonstration (ground or space) | Technology and SW has been proven and demonstrated to work in its final form and under expected conditions. In almost all cases, TRL represents the end of true system development. Examples include developmental test and evaluation (T&E) of the system in its intended weapon system to determine if it meets design specifications | System complete and qualified | Technology has been proven to work in its final form & under expected conditions. In almost all cases, this TRL represents the end of true system development. Examples include developmental test & evaluation (DT&E) of the system in its intended weapon system to determine if it meets design specifications.Final assembly first article inspection results.Key functions and design characteristics, test plan, test data, test results.System qualification results, test data, test results. |
| 9 | Actual system "flight proven" through successful mission operations | In almost all cases, this is the end of the last “bugfixing” aspects of system development. Examples include using the system under operational mission conditions. SW releases are production versions and configuration controlled. Frequency and severity of SW deficiencies are at a minimum | Actual system proven in operational environment (competitive manufacturing in the case of key enabling technologies; or in space) | Actual application of the technology in its final form & under mission conditions, such as those encountered in operational test & evaluation (OT&E). Examples include using the system under operational mission conditions.Operational evaluation report.System level test results.OT&E report. |
| IRL | Definition | Description | Questions to Consider | Suggested Evidence / Activities |
|---|---|---|---|---|
| 1 | Primary interfaces identified. | High-level functions and interfaces with potential integration items (systems, subsystems, components) defined and understood. | Are interfaces with potential integration items (systems, subsystems, components) and their functions defined/understood? | A list and/or diagram of primary interfacing integration items (systems, subsystems, components) and their functions, Functional/physical architecture diagram |
| 2 | Basic characterization of primary interfaces performed. | Interfaces qualitatively characterized with sufficient detail (inputs/outputs) to assess the feasibility of the proposed integration based on a high level CONOPs. Interface requirements and/or specifications defined/drafted. | Are inputs/outputs of primary interfaces characterized and documented? | Documented summary of inputs and outputs of primary interfaces or P-diagrams |
| Are primary interface requirements defined/drafted? | Interface requirements document (e.g., Interoperability Profile [IOP], SAE J1939) | |||
| Is the high level CONOPS known/understood? | High-level CONOPS | |||
| Have interface constraints (functional, physical, environmental, regulations, etc.) been defined? | Defined constraints referencing ESOH, regulatory documentation, etc. | |||
| 3 | Text | Text | Text | Text |
| 4 | Text | Text | Text | Text |
| 5 | Text | Text | Text | Text |
| 6 | Text | Text | Text | Text |
| 7 | Text | Text | Text | Text |
| 8 | Text | Text | Text | Text |
| 9 | Text | Text | Text | Text |
Table
Table
Table
Table
Table
Product-Market Fit
Positive Feedback
Challenges
Research & Development
???
???
Timeline Test
<timeline> DateFormat = dd/mm/yyyy Define $width = 960 Define $warning = 300 Define $height = 1250 Define $dy = -5 # shift text to bottom side of bar Define $start = 2020 Define $end = 2027 Define $now = 10/04/2026
ImageSize = width:$width height:$height PlotArea = right:10 left:10 bottom:120 top:10 Period = from:$start till:$end TimeAxis = orientation:horizontal format:yyyy Legend = orientation:vertical position:bottom columns:4
Colors =
id:bg value:white
id:lightline value:gray(0.9)
id:lighttext value:gray(0.5)
id:section value:gray(0.9)
id:TRL1 value:yellow2 Legend: TRL-1
id:TRL2 value:orange Legend: TRL-2
id:TRL3 value:oceanblue Legend: TRL-3
id:TRL4 value:powderblue Legend: TRL-4
id:TRL5 value:red Legend: TRL-5
id:TRL6 value:lightpurple Legend: TRL-6
id:TRL7 value:lavender Legend: TRL-7
id:TRL8 value:claret Legend: TRL-8
id:TRL9 value:brightblue Legend: TRL-9
id:PILOT value:green Legend: Pilot
id:PROCESS value:skyblue Legend: Process
id:EVENT value:drabgreen Legend: Event
id:INVENTION value:redorange Legend: Invention
id:NAME value:darkblue
id:TODAY value:yellowgreen
BackgroundColors = canvas:bg ScaleMinor = gridcolor:lightline unit:month increment:1 start:$start ScaleMajor = gridcolor:lighttext unit:year increment:1 start:2021
BarData=
bar:title
- main milestones
bar:section1 bar:milestone0101
- startup & networking
bar:section2 bar:event0201 bar:process0202 bar:process0203 bar:process0204 bar:process0205 bar:process0206 bar:process0207 bar:process0208
- problem-solution_fit
bar:section3 bar:process0301 bar:process0302 bar:process0303 bar:event0304 bar:event0305 bar:event0306 bar:event0307 bar:event0308 bar:event0309 bar:event0310 bar:process0311
- research & development
bar:section4 bar:milestone0401 bar:milestone0402 bar:milestone0403 bar:milestone0404 bar:milestone0405 bar:process0406 bar:process0407 bar:process0408 bar:process0409 bar:process0410 bar:process0411 bar:process0412 bar:process0413 bar:process0414 bar:process0415 bar:process0416 bar:process0417
- resources
bar:section5 bar:process0501 bar:process0502 bar:process0503
- explanation: attribute 'barset' instead of 'bar' means consecutive data lines are automatically placed on new bar
- data lines are lines containing at: or from: & till: attributes
- 'barset:break' means 'reset barcounter' = next line will be placed at first bar in barset
- 'barset:skip' means 'increment barcounter' = skip one bar for next data line (to allow extra space
- for text containing line break = ~)
PlotData=
align:left anchor:from fontsize:M width:15 shift:(4,-6) textcolor:black color:section
bar:title from:start till:end text:"General Project Traction" fontsize:XL anchor:middle align:center width:35 color:bg mark:(line,bg)
bar:section1 from:start till:end text:"Milestones" bar:section2 from:start till:end text:"Startup & Networking" bar:section3 from:start till:end text:"Problem-Solution Fit" bar:section4 from:start till:end text:"Research & Development" bar:section5 from:start till:end text:"Resources"
- main milestones
bar:milestone0101 width:10 textcolor:NAME at:01/01/2021 shift:(-110,$dy) text:ARHUDFM Project color:TRL1 from:18/02/2021 till:29/08/2021 color:TRL2 from:29/08/2021 till:07/03/2022 color:TRL3 from:07/03/2022 till:27/11/2022 color:TRL4 from:27/11/2022 till:20/08/2023 color:TRL5 from:20/08/2023 till:$now
- startup & networking
bar:event0201 width:10 textcolor:NAME at:01/01/2021 shift:(-40,$dy) text:Incorporation color:EVENT from:26/06/2021 till:26/07/2021
bar:process0202 width:10 textcolor:NAME at:01/01/2021 shift:(-60,$dy) text:Business Model and Roadmap color:PROCESS from:26/12/2021 till:14/10/2022
bar:process0203 width:10 textcolor:NAME at:01/01/2021 shift:(-30,$dy) text:German Accelerator, Kickstart program color:PROCESS from:07/11/2022 till:17/01/2023
bar:process0204 width:10 textcolor:NAME at:01/01/2021 shift:(180,$dy) text:Financial model color:PROCESS from:11/04/2023 till:$now
bar:process0205 width:10 textcolor:NAME at:01/01/2021 shift:(180,$dy) text:Production scheme color:PROCESS from:04/05/2023 till:$now
bar:process0206 width:10 textcolor:NAME at:01/01/2021 shift:(140,$dy) text:Business processes flow color:PROCESS from:24/05/2023 till:08/10/2023
bar:process0207 width:10 textcolor:NAME at:01/01/2021 shift:(200,$dy) text:Pitch Deck & Demo color:PROCESS from:16/07/2023 till:28/06/2024
bar:process0208 width:10 textcolor:NAME at:01/01/2021 shift:(260,$dy) text:Fundraisong, Pre-Seed Round color:PROCESS from:08/07/2024 till:$now
- problem-solution_fit
bar:process0301 width:10 textcolor:NAME at:01/01/2021 shift:(-90,$dy) text:Problem and solution research color:PROCESS from:01/04/2020 till:$now
bar:process0302 width:10 textcolor:NAME at:01/01/2021 shift:(-70,$dy) text:Competitive environment research color:PROCESS from:14/06/2020 till:$now
bar:process0303 width:10 textcolor:NAME at:01/01/2021 shift:(-60,$dy) text:DoD requirements research color:PROCESS from:08/07/2020 till:$now
bar:event0304 width:10 textcolor:NAME at:01/01/2021 shift:(-60,$dy) text:US DoD xTechSearch 6 color:EVENT from:26/08/2021 till:07/10/2021
bar:event0305 width:10 textcolor:NAME at:01/01/2021 shift:(-70,$dy) text:US DoD Defense Innovation Unit color:EVENT from:12/02/2022 till:23/03/2022
bar:event0306 width:10 textcolor:NAME at:01/01/2021 shift:(90,$dy) text:DARPA DSO color:EVENT from:14/03/2022 till:21/04/2022
bar:event0307 width:10 textcolor:NAME at:01/01/2021 shift:(-50,$dy) text:Lockheed Martin Co., VTC Systems color:EVENT from:17/05/2022 till:01/06/2022
bar:event0308 width:10 textcolor:NAME at:01/01/2021 shift:(-60,$dy) text:Planungsamt der Bundeswehr, Abt. I color:EVENT from:22/05/2022 till:06/07/2022
bar:event0309 width:10 textcolor:NAME at:01/01/2021 shift:(100,$dy) text:US DoD xTechSearch 7 color:EVENT from:20/11/2022 till:17/01/2023
bar:event0310 width:10 textcolor:NAME at:01/01/2021 shift:(70,$dy) text:Cyber Innovation Hub der Bw color:EVENT from:11/01/2023 till:16/02/2023
bar:process0311 width:10 textcolor:NAME at:01/01/2021 shift:(200,$dy) text:Mentorship program color:PROCESS from:01/07/2023 till:$now
- research & development
bar:milestone0401 width:10 textcolor:NAME at:01/01/2021 shift:(-110,$dy) text:Engineering Design color:TRL1 from:10/04/2021 till:29/08/2021 color:TRL2 from:29/08/2021 till:07/12/2021 color:TRL3 from:07/12/2021 till:27/01/2022 color:TRL4 from:27/01/2022 till:$now
bar:milestone0402 width:10 textcolor:NAME at:01/01/2021 shift:(-20,$dy) text:Software Architecture color:TRL1 from:04/02/2022 till:10/05/2022 color:TRL2 from:10/05/2022 till:07/04/2023 color:TRL3 from:07/04/2023 till:$now
bar:milestone0403 width:10 textcolor:NAME at:01/01/2021 shift:(180,$dy) text:Project Backlog color:TRL1 from:18/03/2023 till:10/08/2023 color:TRL2 from:10/08/2023 till:$now
bar:milestone0404 width:10 textcolor:NAME at:01/01/2021 shift:(240,$dy) text:User Interface color:TRL1 from:21/07/2023 till:19/08/2023 color:TRL2 from:19/08/2023 till:21/01/2024 color:TRL3 from:21/01/2024 till:14/06/2024 color:TRL4 from:14/06/2024 till:$now
bar:milestone0405 width:10 textcolor:NAME at:01/01/2021 shift:(220,$dy) text:Prototyping color:TRL5 from:14/04/2023 till:$now
bar:process0406 width:10 textcolor:NAME at:01/01/2021 shift:(-80,$dy) text:Human Augmentation color:PROCESS from:26/05/2021 till:$now
bar:process0407 width:10 textcolor:NAME at:01/01/2021 shift:(-130,$dy) text:Artificial Intelligence, Computer Vision color:PROCESS from:17/02/2022 till:$now
bar:process0408 width:10 textcolor:NAME at:01/01/2021 shift:(100,$dy) text:Detection color:PROCESS from:06/04/2022 till:$now
bar:process0409 width:10 textcolor:NAME at:01/01/2021 shift:(-95,$dy) text:Communication color:PROCESS from:09/01/2021 till:$now
bar:process0410 width:10 textcolor:NAME at:01/01/2021 shift:(-110,$dy) text:Navigation & Task Management color:PROCESS from:30/09/2021 till:$now
bar:process0411 width:10 textcolor:NAME at:01/01/2021 shift:(-10,$dy) text:Fire assistance and ballistic color:PROCESS from:02/07/2022 till:$now
bar:process0412 width:10 textcolor:NAME at:01/01/2021 shift:(110,$dy) text:Protection color:PROCESS from:27/06/2022 till:$now
bar:process0413 width:10 textcolor:NAME at:01/01/2021 shift:(10,$dy) text:Vitals Body Sensors and Care Under Fire color:PROCESS from:18/03/2023 till:$now
bar:process0414 width:10 textcolor:NAME at:01/01/2021 shift:(-20,$dy) text:Defense & Tactical color:PROCESS from:31/10/2020 till:$now
bar:process0415 width:10 textcolor:NAME at:01/01/2021 shift:(425,$dy) text:OptEng & EEE inventions color:INVENTION from:14/03/2021 till:12/05/2021 #optical scheme of the light guide and light flux division with a constant focal length concept color:INVENTION from:19/09/2021 till:30/09/2021 #power supply and battery management concept color:INVENTION from:24/10/2021 till:16/10/2021 #active cooling system inside the sealed enclosure concept color:INVENTION from:04/03/2023 till:16/04/2023 #three-sensor video camera (UHD, HDR, SWIR) concept color:INVENTION from:08/05/2023 till:29/05/2023 #fading pads of the screen based on a polymer composition of electrochromic material with transparent electrically conductive layer tracks color:INVENTION from:11/11/2023 till:16/12/2023 #DLP implementation concept
bar:process0416 width:10 textcolor:NAME at:01/01/2021 shift:(510,$dy) text:EEE & SWE inventions color:INVENTION from:26/08/2021 till:12/09/2021 #Instant Messaging System color:INVENTION from:11/11/2021 till:23/12/2021 #embedded Software Defined Radio concept color:INVENTION from:04/02/2022 till:19/02/2022 #maps, navigation, path tracking app algorithms color:INVENTION from:09/05/2022 till:28/05/2022 #Task Management app algorithms color:INVENTION from:10/07/2022 till:30/07/2022 #Identification Friend-or-Foe methods, appearance, transponder color:INVENTION from:12/08/2022 till:04/10/2022 #embedded SDR scanner concept color:INVENTION from:03/12/2022 till:09/01/2023 #Software Defined Antenna Rx / Tx, 2 MHz - 8 GHz, 64 patch antennas (highly‐directional RF digital beams, fixed & hopping frequencies) for Comms, RF scanner, Radio Direction Finding, Radar Detection, Passive Radar, Drone Detection, Remote Control color:INVENTION from:06/03/2023 till:20/03/2023 #Handheld metal re-radiation radar concept color:INVENTION from:17/04/2023 till:29/04/2023 #Radar warning receiver concept color:INVENTION from:10/07/2023 till:31/07/2023 #built-in drone & robot & unmanned vehicle remote control color:INVENTION from:03/08/2023 till:19/08/2023 #AI-based chat, mental clusterization, auto-reply algorithms color:INVENTION from:24/08/2023 till:16/09/2023 #Gunfire Locator concept color:INVENTION from:18/12/2023 till:21/01/2024 #Hardware Architecture concept color:INVENTION from:12/02/2024 till:05/05/2024 #CPU Intel Core i7 14-Gen, Chipset Intel 700 implementation concept color:INVENTION from:04/06/2024 till:25/06/2024 #Intel Gaudi 3 AI Accelerator, NPU Loihi 2 implementation concept
bar:process0417 width:10 textcolor:NAME at:01/01/2021 shift:(410,$dy) text:MechEng & EEE inventions color:INVENTION from:12/02/2021 till:28/02/2021 #built-in hands-free drinking system design color:INVENTION from:18/03/2021 till:03/05/2021 #HEPA-14/ULPA-15 membrane design of replaceable air filters with a low resistance to airflow color:INVENTION from:09/06/2021 till:20/06/2021 #headphones ear cups design (Audial Augmentation, ventilation, shock wave and sound overpressure protection) color:INVENTION from:10/02/2023 till:22/02/2023 #Continuous Wind Capture impellers color:INVENTION from:03/06/2023 till:25/06/2023 #four-sensor digital sight 24x (UHD, HDR, SWIR, LWIR) color:INVENTION from:04/07/2023 till:19/07/2023 #built-in 2 pneumatic pumps and NO micro solenoid check valve for pulmonary resuscitation color:INVENTION from:25/07/2023 till:16/08/2023 #wearable automatic tourniquets for emergency stoppage of acute bleeding in the limbs with built-in sensors for monitoring vital signs color:INVENTION from:26/08/2023 till:04/09/2023 #elastic belt with pockets, automatic infusion therapy (fluid resuscitation) system (NC micro solenoid check valve, pre-pressured container for plasma substitute and anticoagulant) with integrated ECG sensors and defibrillator electrodes, automatic defibrillator color:INVENTION from:09/09/2023 till:16/09/2023 #microphone array concept
- resources
bar:process0501 width:10 textcolor:NAME at:01/01/2021 shift:(170,$dy) text:Basic materials and suppliers identified color:PROCESS from:26/05/2021 till:28/01/2022
bar:process0502 width:10 textcolor:NAME at:01/01/2021 shift:(-40,$dy) text:Lab equipped color:PROCESS from:11/05/2021 till:24/03/2022
bar:process0503 width:10 textcolor:NAME at:01/01/2021 shift:(290,$dy) text:Materials and SMT components for prototyping color:PROCESS from:02/07/2021 till:14/12/2022
- bar:0 width:1
- textcolor:red at:06/04/2021 shift:(3,-4) text:WW-I
- textcolor:red at:08/12/2022 shift:(3,-4) text:WW-II
LineData=
at:$now color:TODAY width:0.2
- at:06/04/2021 color:red width:0.2 layer:back
- at:28/06/2021 color:blue width:0.2 layer:back
- at:06/09/2021 color:pink width:10 layer:back
- at:06/05/2022 color:pink width:10 layer:back
- at:06/12/2022 color:pink width:10 layer:back
- at:06/03/2023 color:pink width:10 layer:back
</timeline>
Timeline Old
<timeline> DateFormat = dd/mm/yyyy Define $width = 960 Define $warning = 300 Define $height = 1250 Define $dy = -5 # shift text to bottom side of bar Define $start = 2020 Define $end = 2026 Define $now = 25/04/2026
ImageSize = width:$width height:$height PlotArea = right:10 left:10 bottom:120 top:10 Period = from:$start till:$end TimeAxis = orientation:horizontal format:yyyy Legend = orientation:vertical position:bottom columns:4
Colors =
id:bg value:white
id:lightline value:gray(0.9)
id:lighttext value:gray(0.5)
id:section value:gray(0.9)
id:TRL1 value:yellow2 Legend: TRL-1
id:TRL2 value:orange Legend: TRL-2
id:TRL3 value:oceanblue Legend: TRL-3
id:TRL4 value:powderblue Legend: TRL-4
id:TRL5 value:red Legend: TRL-5
id:TRL6 value:lightpurple Legend: TRL-6
id:TRL7 value:lavender Legend: TRL-7
id:TRL8 value:claret Legend: TRL-8
id:TRL9 value:brightblue Legend: TRL-9
id:PILOT value:green Legend: Pilot
id:PROCESS value:skyblue Legend: Process
id:EVENT value:drabgreen Legend: Event
id:INVENTION value:redorange Legend: Invention
id:NAME value:darkblue
id:TODAY value:yellowgreen
BackgroundColors = canvas:bg ScaleMinor = gridcolor:lightline unit:month increment:1 start:$start ScaleMajor = gridcolor:lighttext unit:year increment:1 start:2021
BarData=
bar:title
- main milestones
bar:section1 bar:milestone0101
- startup & networking
bar:section2 bar:event0201 bar:process0202 bar:process0203 bar:process0204 bar:process0205 bar:process0206 bar:process0207 bar:process0208
- problem-solution_fit
bar:section3 bar:process0301 bar:process0302 bar:process0303 bar:event0304 bar:event0305 bar:event0306 bar:event0307 bar:event0308 bar:event0309 bar:event0310 bar:process0311
- research & development
bar:section4 bar:milestone0401 bar:milestone0402 bar:milestone0403 bar:milestone0404 bar:milestone0405 bar:process0406 bar:process0407 bar:process0408 bar:process0409 bar:process0410 bar:process0411 bar:process0412 bar:process0413 bar:process0414 bar:process0415 bar:process0416 bar:process0417
- resources
bar:section5 bar:process0501 bar:process0502 bar:process0503
- explanation: attribute 'barset' instead of 'bar' means consecutive data lines are automatically placed on new bar
- data lines are lines containing at: or from: & till: attributes
- 'barset:break' means 'reset barcounter' = next line will be placed at first bar in barset
- 'barset:skip' means 'increment barcounter' = skip one bar for next data line (to allow extra space
- for text containing line break = ~)
PlotData=
align:left anchor:from fontsize:M width:15 shift:(4,-6) textcolor:black color:section
bar:title from:start till:end text:"General Project Traction" fontsize:XL anchor:middle align:center width:35 color:bg mark:(line,bg)
bar:section1 from:start till:end text:"Milestones" bar:section2 from:start till:end text:"Startup & Networking" bar:section3 from:start till:end text:"Problem-Solution Fit" bar:section4 from:start till:end text:"Research & Development" bar:section5 from:start till:end text:"Resources"
- main milestones
bar:milestone0101 width:10 textcolor:NAME at:01/01/2021 shift:(-110,$dy) text:ARHUDFM Project color:TRL1 from:18/02/2021 till:29/08/2021 color:TRL2 from:29/08/2021 till:07/03/2022 color:TRL3 from:07/03/2022 till:27/11/2022 color:TRL4 from:27/11/2022 till:20/08/2023 color:TRL5 from:20/08/2023 till:$now
- startup & networking
bar:event0201 width:10 textcolor:NAME at:01/01/2021 shift:(-40,$dy) text:Incorporation color:EVENT from:26/06/2021 till:26/07/2021
bar:process0202 width:10 textcolor:NAME at:01/01/2021 shift:(-60,$dy) text:Business Model and Roadmap color:PROCESS from:26/12/2021 till:14/10/2022
bar:process0203 width:10 textcolor:NAME at:01/01/2021 shift:(-30,$dy) text:German Accelerator, Kickstart program color:PROCESS from:07/11/2022 till:17/01/2023
bar:process0204 width:10 textcolor:NAME at:01/01/2021 shift:(180,$dy) text:Financial model color:PROCESS from:11/04/2023 till:$now
bar:process0205 width:10 textcolor:NAME at:01/01/2021 shift:(180,$dy) text:Production scheme color:PROCESS from:04/05/2023 till:$now
bar:process0206 width:10 textcolor:NAME at:01/01/2021 shift:(140,$dy) text:Business processes flow color:PROCESS from:24/05/2023 till:08/10/2023
bar:process0207 width:10 textcolor:NAME at:01/01/2021 shift:(200,$dy) text:Pitch Deck & Demo color:PROCESS from:16/07/2023 till:28/06/2024
bar:process0208 width:10 textcolor:NAME at:01/01/2021 shift:(260,$dy) text:Fundraisong, Pre-Seed Round color:PROCESS from:08/07/2024 till:$now
- problem-solution_fit
bar:process0301 width:10 textcolor:NAME at:01/01/2021 shift:(-90,$dy) text:Problem and solution research color:PROCESS from:01/04/2020 till:$now
bar:process0302 width:10 textcolor:NAME at:01/01/2021 shift:(-70,$dy) text:Competitive environment research color:PROCESS from:14/06/2020 till:$now
bar:process0303 width:10 textcolor:NAME at:01/01/2021 shift:(-60,$dy) text:DoD requirements research color:PROCESS from:08/07/2020 till:$now
bar:event0304 width:10 textcolor:NAME at:01/01/2021 shift:(-60,$dy) text:US DoD xTechSearch 6 color:EVENT from:26/08/2021 till:07/10/2021
bar:event0305 width:10 textcolor:NAME at:01/01/2021 shift:(-70,$dy) text:US DoD Defense Innovation Unit color:EVENT from:12/02/2022 till:23/03/2022
bar:event0306 width:10 textcolor:NAME at:01/01/2021 shift:(90,$dy) text:DARPA DSO color:EVENT from:14/03/2022 till:21/04/2022
bar:event0307 width:10 textcolor:NAME at:01/01/2021 shift:(-50,$dy) text:Lockheed Martin Co., VTC Systems color:EVENT from:17/05/2022 till:01/06/2022
bar:event0308 width:10 textcolor:NAME at:01/01/2021 shift:(-60,$dy) text:Planungsamt der Bundeswehr, Abt. I color:EVENT from:22/05/2022 till:06/07/2022
bar:event0309 width:10 textcolor:NAME at:01/01/2021 shift:(100,$dy) text:US DoD xTechSearch 7 color:EVENT from:20/11/2022 till:17/01/2023
bar:event0310 width:10 textcolor:NAME at:01/01/2021 shift:(70,$dy) text:Cyber Innovation Hub der Bw color:EVENT from:11/01/2023 till:16/02/2023
bar:process0311 width:10 textcolor:NAME at:01/01/2021 shift:(200,$dy) text:Mentorship program color:PROCESS from:01/07/2023 till:$now
- research & development
bar:milestone0401 width:10 textcolor:NAME at:01/01/2021 shift:(-110,$dy) text:Engineering Design color:TRL1 from:10/04/2021 till:29/08/2021 color:TRL2 from:29/08/2021 till:07/12/2021 color:TRL3 from:07/12/2021 till:27/01/2022 color:TRL4 from:27/01/2022 till:$now
bar:milestone0402 width:10 textcolor:NAME at:01/01/2021 shift:(-20,$dy) text:Software Architecture color:TRL1 from:04/02/2022 till:10/05/2022 color:TRL2 from:10/05/2022 till:07/04/2023 color:TRL3 from:07/04/2023 till:$now
bar:milestone0403 width:10 textcolor:NAME at:01/01/2021 shift:(180,$dy) text:Project Backlog color:TRL1 from:18/03/2023 till:10/08/2023 color:TRL2 from:10/08/2023 till:$now
bar:milestone0404 width:10 textcolor:NAME at:01/01/2021 shift:(240,$dy) text:User Interface color:TRL1 from:21/07/2023 till:19/08/2023 color:TRL2 from:19/08/2023 till:21/01/2024 color:TRL3 from:21/01/2024 till:14/06/2024 color:TRL4 from:14/06/2024 till:$now
bar:milestone0405 width:10 textcolor:NAME at:01/01/2021 shift:(220,$dy) text:Prototyping color:TRL5 from:14/04/2023 till:$now
bar:process0406 width:10 textcolor:NAME at:01/01/2021 shift:(-80,$dy) text:Human Augmentation color:PROCESS from:26/05/2021 till:$now
bar:process0407 width:10 textcolor:NAME at:01/01/2021 shift:(-130,$dy) text:Artificial Intelligence, Computer Vision color:PROCESS from:17/02/2022 till:$now
bar:process0408 width:10 textcolor:NAME at:01/01/2021 shift:(100,$dy) text:Detection color:PROCESS from:06/04/2022 till:$now
bar:process0409 width:10 textcolor:NAME at:01/01/2021 shift:(-95,$dy) text:Communication color:PROCESS from:09/01/2021 till:$now
bar:process0410 width:10 textcolor:NAME at:01/01/2021 shift:(-110,$dy) text:Navigation & Task Management color:PROCESS from:30/09/2021 till:$now
bar:process0411 width:10 textcolor:NAME at:01/01/2021 shift:(-10,$dy) text:Fire assistance and ballistic color:PROCESS from:02/07/2022 till:$now
bar:process0412 width:10 textcolor:NAME at:01/01/2021 shift:(110,$dy) text:Protection color:PROCESS from:27/06/2022 till:$now
bar:process0413 width:10 textcolor:NAME at:01/01/2021 shift:(10,$dy) text:Vitals Body Sensors and Care Under Fire color:PROCESS from:18/03/2023 till:$now
bar:process0414 width:10 textcolor:NAME at:01/01/2021 shift:(-20,$dy) text:Defense & Tactical color:PROCESS from:31/10/2020 till:$now
bar:process0415 width:10 textcolor:NAME at:01/01/2021 shift:(425,$dy) text:OptEng & EEE inventions color:INVENTION from:14/03/2021 till:12/05/2021 #optical scheme of the light guide and light flux division with a constant focal length concept color:INVENTION from:19/09/2021 till:30/09/2021 #power supply and battery management concept color:INVENTION from:24/10/2021 till:16/10/2021 #active cooling system inside the sealed enclosure concept color:INVENTION from:04/03/2023 till:16/04/2023 #three-sensor video camera (UHD, HDR, SWIR) concept color:INVENTION from:08/05/2023 till:29/05/2023 #fading pads of the screen based on a polymer composition of electrochromic material with transparent electrically conductive layer tracks color:INVENTION from:11/11/2023 till:16/12/2023 #DLP implementation concept
bar:process0416 width:10 textcolor:NAME at:01/01/2021 shift:(510,$dy) text:EEE & SWE inventions color:INVENTION from:26/08/2021 till:12/09/2021 #Instant Messaging System color:INVENTION from:11/11/2021 till:23/12/2021 #embedded Software Defined Radio concept color:INVENTION from:04/02/2022 till:19/02/2022 #maps, navigation, path tracking app algorithms color:INVENTION from:09/05/2022 till:28/05/2022 #Task Management app algorithms color:INVENTION from:10/07/2022 till:30/07/2022 #Identification Friend-or-Foe methods, appearance, transponder color:INVENTION from:12/08/2022 till:04/10/2022 #embedded SDR scanner concept color:INVENTION from:03/12/2022 till:09/01/2023 #Software Defined Antenna Rx / Tx, 2 MHz - 8 GHz, 64 patch antennas (highly‐directional RF digital beams, fixed & hopping frequencies) for Comms, RF scanner, Radio Direction Finding, Radar Detection, Passive Radar, Drone Detection, Remote Control color:INVENTION from:06/03/2023 till:20/03/2023 #Handheld metal re-radiation radar concept color:INVENTION from:17/04/2023 till:29/04/2023 #Radar warning receiver concept color:INVENTION from:10/07/2023 till:31/07/2023 #built-in drone & robot & unmanned vehicle remote control color:INVENTION from:03/08/2023 till:19/08/2023 #AI-based chat, mental clusterization, auto-reply algorithms color:INVENTION from:24/08/2023 till:16/09/2023 #Gunfire Locator concept color:INVENTION from:18/12/2023 till:21/01/2024 #Hardware Architecture concept color:INVENTION from:12/02/2024 till:05/05/2024 #CPU Intel Core i7 14-Gen, Chipset Intel 700 implementation concept color:INVENTION from:04/06/2024 till:25/06/2024 #Intel Gaudi 3 AI Accelerator, NPU Loihi 2 implementation concept
bar:process0417 width:10 textcolor:NAME at:01/01/2021 shift:(410,$dy) text:MechEng & EEE inventions color:INVENTION from:12/02/2021 till:28/02/2021 #built-in hands-free drinking system design color:INVENTION from:18/03/2021 till:03/05/2021 #HEPA-14/ULPA-15 membrane design of replaceable air filters with a low resistance to airflow color:INVENTION from:09/06/2021 till:20/06/2021 #headphones ear cups design (Audial Augmentation, ventilation, shock wave and sound overpressure protection) color:INVENTION from:10/02/2023 till:22/02/2023 #Continuous Wind Capture impellers color:INVENTION from:03/06/2023 till:25/06/2023 #four-sensor digital sight 24x (UHD, HDR, SWIR, LWIR) color:INVENTION from:04/07/2023 till:19/07/2023 #built-in 2 pneumatic pumps and NO micro solenoid check valve for pulmonary resuscitation color:INVENTION from:25/07/2023 till:16/08/2023 #wearable automatic tourniquets for emergency stoppage of acute bleeding in the limbs with built-in sensors for monitoring vital signs color:INVENTION from:26/08/2023 till:04/09/2023 #elastic belt with pockets, automatic infusion therapy (fluid resuscitation) system (NC micro solenoid check valve, pre-pressured container for plasma substitute and anticoagulant) with integrated ECG sensors and defibrillator electrodes, automatic defibrillator color:INVENTION from:09/09/2023 till:16/09/2023 #microphone array concept
- resources
bar:process0501 width:10 textcolor:NAME at:01/01/2021 shift:(170,$dy) text:Basic materials and suppliers identified color:PROCESS from:26/05/2021 till:28/01/2022
bar:process0502 width:10 textcolor:NAME at:01/01/2021 shift:(-40,$dy) text:Lab equipped color:PROCESS from:11/05/2021 till:24/03/2022
bar:process0503 width:10 textcolor:NAME at:01/01/2021 shift:(290,$dy) text:Materials and SMT components for prototyping color:PROCESS from:02/07/2021 till:14/12/2022
- bar:0 width:1
- textcolor:red at:06/04/2021 shift:(3,-4) text:WW-I
- textcolor:red at:08/12/2022 shift:(3,-4) text:WW-II
LineData=
at:$now color:TODAY width:0.2
- at:06/04/2021 color:red width:0.2 layer:back
- at:28/06/2021 color:blue width:0.2 layer:back
- at:06/09/2021 color:pink width:10 layer:back
- at:06/05/2022 color:pink width:10 layer:back
- at:06/12/2022 color:pink width:10 layer:back
- at:06/03/2023 color:pink width:10 layer:back
</timeline>
| TRL | NASA usage | DoD usage[4][5][6] | European Union |
|---|---|---|---|
| 1 | Basic principles observed and reported | Scientific research begins to be translated into applied R&D | Basic principles observed |
| 2 | Technology concept and/or application formulated | Invention begins. Once basic principles are observed, practical applications can be invented | Technology concept formulated |
| 3 | Analytical and experimental critical function and/or characteristic proof-of concept | Active R&D is initiated. This includes analytical studies to produce code and laboratory studies to physically validate analytical predictions of separate technology HW/SW elements | Experimental proof of concept |
| 4 | Component and/or breadboard validation in laboratory environment | Basic technological components are integrated to establish that they will work together. System SW architecture development initiated to include interoperability, reliability, maintainability, extensibility, scalability and security issues | Technology validated in lab |
| 5 | Component and/or breadboard validation in relevant environment | The basic technological HW/SW components are integrated with reasonably realistic supporting elements so that they can be tested in a simulated environment | Technology validated in relevant environment (industrially relevant environment in the case of key enabling technologies) |
| 6 | System/subsystem model or prototype demonstration in a relevant environment (ground or space) | Examples include testing a prototype in a high-fidelity lab environment or a live/virtual experiment or in a simulated operational environment | Technology demonstrated in relevant environment (industrially relevant environment in the case of key enabling technologies) |
| 7 | System prototype demonstration in a space environment | Prototype near, or at, planned operational system. Algorithms run on processor of the operational environment integrated with actual external entities. SW support structure in place. SW releases are in distinct versions. Frequency and severity of SW deficiency reports do not significantly degrade functionality or performance. Verification, Validation and Accreditation (VV&A) completed | System prototype demonstration in operational environment |
| 8 | Actual system completed and "flight qualified" through test and demonstration (ground or space) | Technology and SW has been proven and demonstrated to work in its final form and under expected conditions. In almost all cases, TRL represents the end of true system development. Examples include developmental test and evaluation (T&E) of the system in its intended weapon system to determine if it meets design specifications | System complete and qualified |
| 9 | Actual system "flight proven" through successful mission operations | In almost all cases, this is the end of the last “bugfixing” aspects of system development. Examples include using the system under operational mission conditions. SW releases are production versions and configuration controlled. Frequency and severity of SW deficiencies are at a minimum | Actual system proven in operational environment (competitive manufacturing in the case of key enabling technologies; or in space) |
Roadmap
→redirect Main Article: Public:Business_Tables
<timeline> DateFormat = dd/mm/yyyy Define $width = 960 Define $warning = 300 Define $height = 2000 Define $dy = -5 # shift text to bottom side of bar Define $start = 2024 Define $end = 2028 Define $now = 25/04/2026
ImageSize = width:$width height:$height PlotArea = right:10 left:10 bottom:120 top:10 Period = from:$start till:$end TimeAxis = orientation:horizontal format:yyyy Legend = orientation:vertical position:bottom columns:4
Colors =
id:bg value:white
id:lightline value:gray(0.9)
id:lighttext value:gray(0.5)
id:section value:gray(0.9)
id:TRL1 value:yellow2 Legend: TRL-1
id:TRL2 value:orange Legend: TRL-2
id:TRL3 value:oceanblue Legend: TRL-3
id:TRL4 value:powderblue Legend: TRL-4
id:TRL5 value:red Legend: TRL-5
id:TRL6 value:lightpurple Legend: TRL-6
id:TRL7 value:lavender Legend: TRL-7
id:TRL8 value:claret Legend: TRL-8
id:TRL9 value:brightblue Legend: TRL-9
id:PILOT value:green Legend: Pilot
id:PROCESS value:skyblue Legend: Process
id:EVENT value:drabgreen Legend: Event
id:INVENTION value:redorange Legend: Invention
id:NAME value:darkblue
id:TODAY value:yellowgreen
BackgroundColors = canvas:bg ScaleMinor = gridcolor:lightline unit:month increment:1 start:$start ScaleMajor = gridcolor:lighttext unit:year increment:1 start:2024
BarData=
bar:title
- main milestones
bar:section1 bar:milestone0101
- Design Development & Algorithm Architecture: Ada Lovelace Team
bar:section2 bar:milestone0201 bar:milestone0202 bar:milestone0203 bar:milestone0204 bar:milestone0205
- Mechanical Engineering: Stephanie Kwolek Team
bar:section3 bar:milestone0301 bar:milestone0302 bar:milestone0303 bar:milestone0304 bar:milestone0305 bar:milestone0306
- Optical Engineering: Katharine Blodgett Team
bar:section4 bar:milestone0401 bar:milestone0402 bar:milestone0403
- Electronics Engineering: Ida Hyde Team
bar:section5 bar:milestone0501 bar:milestone0502 bar:milestone0503 bar:milestone0504 bar:milestone0505
- Software Development: Hedy Lamarr Team
bar:section6 bar:milestone0601 bar:milestone0602 bar:milestone0603 bar:milestone0604 bar:milestone0605 bar:milestone0606 bar:milestone0607 bar:milestone0608 bar:milestone0609 bar:milestone0610 bar:milestone0611 bar:milestone0612 bar:milestone0613 bar:milestone0614 bar:milestone0615 bar:milestone0616
- Software Development: Grace Hopper Team
bar:section7 bar:milestone0701 bar:milestone0702 bar:milestone0703 bar:milestone0704 bar:milestone0705 bar:milestone0706 bar:milestone0707 bar:milestone0708 bar:milestone0709 bar:milestone0710 bar:milestone0711 bar:milestone0712 bar:milestone0713 bar:milestone0714 bar:milestone0715 bar:milestone0716 bar:milestone0717 bar:milestone0718 bar:milestone0719 bar:milestone0720 bar:milestone0721 bar:milestone0722 bar:milestone0723 bar:milestone0724 bar:milestone0725 bar:milestone0726
- Software Development: Evelyn Berezin Team
bar:section8 bar:milestone0801 bar:milestone0802 bar:milestone0803 bar:milestone0804 bar:milestone0805 bar:milestone0806 bar:milestone0807 bar:milestone0808 bar:milestone0809 bar:milestone0810 bar:milestone0811
- Software Development: Barbara Askins Team
bar:section9 bar:milestone0901 bar:milestone0902 bar:milestone0903 bar:milestone0904 bar:milestone0905
- Networking: Margaret Hamilton Team
bar:section10 bar:milestone1001 bar:milestone1002 bar:milestone1003 bar:milestone1004 bar:milestone1005
- Customer & Business Development: Barbara Liskov Team
bar:section11 bar:milestone1101 bar:milestone1102 bar:milestone1103 bar:milestone1104 bar:milestone1105 bar:milestone1106 bar:milestone1107
bar:0 bar:99
- explanation: attribute 'barset' instead of 'bar' means consecutive data lines are automatically placed on new bar
- data lines are lines containing at: or from: & till: attributes
- 'barset:break' means 'reset barcounter' = next line will be placed at first bar in barset
- 'barset:skip' means 'increment barcounter' = skip one bar for next data line (to allow extra space
- for text containing line break = ~)
PlotData=
align:left anchor:from fontsize:M width:15 shift:(4,-6) textcolor:black color:section
bar:title from:start till:end text:"Project Development Roadmap" fontsize:XL anchor:middle align:center width:35 color:bg mark:(line,bg)
bar:section1 from:start till:end text:"Milestones" bar:section2 from:start till:end text:"Design Development & Algorithm Architecture: Ada Lovelace Team" bar:section3 from:start till:end text:"Mechanical Engineering: Stephanie Kwolek Team" bar:section4 from:start till:end text:"Optical Engineering: Katharine Blodgett Team" bar:section5 from:start till:end text:"Electronics Engineering: Ida Hyde Team" bar:section6 from:start till:end text:"Software Development: Hedy Lamarr Team" bar:section7 from:start till:end text:"Software Development: Grace Hopper Team" bar:section8 from:start till:end text:"Software Development: Evelyn Berezin Team" bar:section9 from:start till:end text:"Software Development: Barbara Askins Team" bar:section10 from:start till:end text:"Networking: Margaret Hamilton Team" bar:section11 from:start till:end text:"Customer & Business Development: Barbara Liskov Team"
- main milestones
bar:milestone0101 width:10 textcolor:NAME at:01/01/2024 shift:(10,$dy) text:ARHUDFM Project color:TRL5 from:20/08/2024 till:01/07/2025 color:TRL6 from:01/07/2025 till:01/10/2025 color:TRL7 from:01/10/2025 till:01/04/2026 color:TRL8 from:01/04/2026 till:01/07/2026 color:TRL9 from:01/07/2026 till:01/10/2026 color:PILOT from:01/10/2026 till:31/12/2028
- Design Development & Algorithm Architecture: Ada Lovelace Team
- CAD model update, GUI, VUI, Apps algorithms, Demos, Videos, Animations
- Prio #1: [TRL 1-2] Research and description of the principle of operation, description of the technology application, computer-added design
- Prio #2: [TRL 3-4] Technology functionality demo, specific functionality description, GUI demo, lab experimental setup
- Prio #3:
- Prio #4:
bar:milestone0201 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Engineering design color:TRL6 from:01/07/2025 till:01/10/2025 color:TRL7 from:01/10/2025 till:01/04/2026 color:TRL8 from:01/04/2026 till:01/07/2026 color:TRL9 from:01/07/2026 till:01/10/2026
bar:milestone0202 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:GUI color:TRL5 from:20/08/2024 till:01/07/2025 color:TRL6 from:01/07/2025 till:01/10/2025 color:TRL7 from:01/10/2025 till:01/04/2026 color:TRL8 from:01/04/2026 till:01/07/2026 color:TRL9 from:01/07/2026 till:01/10/2026
bar:milestone0203 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:VUI color:TRL5 from:20/08/2024 till:01/07/2025 color:TRL6 from:01/07/2025 till:01/10/2025 color:TRL7 from:01/10/2025 till:01/04/2026 color:TRL8 from:01/04/2026 till:01/07/2026 color:TRL9 from:01/07/2026 till:01/10/2026
bar:milestone0204 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:SW architecture color:TRL4 from:01/01/2025 till:20/04/2025 color:TRL5 from:20/04/2025 till:01/07/2025 color:TRL6 from:01/07/2025 till:01/10/2025 color:TRL7 from:01/10/2025 till:01/04/2026 color:TRL8 from:01/04/2026 till:01/07/2026 color:TRL9 from:01/07/2026 till:01/10/2026
bar:milestone0205 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Content creation color:PROCESS from:01/10/2024 till:31/12/2028
- Mechanical Engineering: Stephanie Kwolek Team
- Prio #1: [TRL 5-6] Prototype: based on 3D print, vacuum casting, vacuum unfusion
- Prio #2: [TRL 7] MVPα: vacuum casting, vacuum unfusion, injection moulding, manual assembly
- Prio #3: [TRL 8] MVPβ: vacuum casting, vacuum unfusion, injection moulding, manual assembly
- Prio #4: [TRL 9] MMPδ: manufacturing process automation, robotic assembly, add-ons (auto tourniquets, Care Under Fire set)
- Prio #5: MMPγ: manufacturing & assembly & logistic process upgrade
bar:milestone0301 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:3D print color:TRL5 from:20/08/2024 till:01/07/2025 color:TRL6 from:01/07/2025 till:01/10/2025 color:TRL7 from:01/10/2025 till:01/04/2026
bar:milestone0302 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Vacuum casting color:TRL7 from:01/10/2025 till:01/04/2026 color:TRL8 from:01/04/2026 till:01/07/2026 color:TRL9 from:01/07/2026 till:01/10/2026
bar:milestone0303 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Injection moulding color:TRL7 from:01/10/2025 till:01/04/2026 color:TRL8 from:01/04/2026 till:01/07/2026 color:TRL9 from:01/07/2026 till:01/10/2026
bar:milestone0304 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Surface finishing color:TRL7 from:01/10/2025 till:01/04/2026 color:TRL8 from:01/04/2026 till:01/07/2026 color:TRL9 from:01/07/2026 till:01/10/2026
bar:milestone0305 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Manual assembly color:TRL7 from:01/10/2025 till:01/04/2026 color:TRL8 from:01/04/2026 till:01/07/2026 color:TRL9 from:01/07/2026 till:01/10/2026
bar:milestone0306 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Test tooling color:TRL7 from:01/10/2025 till:01/04/2026 color:TRL8 from:01/04/2026 till:01/07/2026 color:TRL9 from:01/07/2026 till:01/10/2026
- Optical Engineering: Katharine Blodgett Team
- Light guide, Beam splitting prisms, Dichroic mirror, Optical coatings, Fading pads
- Prio #1: [TRL 5-6] Prototype: optical scheme, light guide, dichroic mirror, fading pads
- Prio #2: [TRL 7] MVPα: beam splitting prisms for 3 cam sensors, optical coatings
- Prio #3: [TRL 8] MVPβ:
- Prio #4: [TRL 9] MMPδ:
- Prio #5: MMPγ:
bar:milestone0401 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Lens system color:TRL5 from:20/08/2024 till:01/07/2025 color:TRL6 from:01/07/2025 till:01/10/2025 color:TRL7 from:01/10/2025 till:01/04/2026 color:TRL8 from:01/04/2026 till:01/07/2026 color:TRL9 from:01/07/2026 till:01/10/2026
bar:milestone0402 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Optical coatings color:TRL5 from:01/03/2025 till:01/07/2025 color:TRL6 from:01/07/2025 till:01/10/2025 color:TRL7 from:01/10/2025 till:01/04/2026 color:TRL8 from:01/04/2026 till:01/07/2026 color:TRL9 from:01/07/2026 till:01/10/2026
bar:milestone0403 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Fading pads color:TRL5 from:01/03/2025 till:01/07/2025 color:TRL6 from:01/07/2025 till:01/10/2025 color:TRL7 from:01/10/2025 till:01/04/2026 color:TRL8 from:01/04/2026 till:01/07/2026 color:TRL9 from:01/07/2026 till:01/10/2026
- Electronics Engineering: Ida Hyde Team
- Schematics and PCBs for motherboard, projector, IFF Transponder, SDR, SDRS, PCSR, Digital sight
- Prio #1: [TRL 5-6] Prototype: based on Raspberry Pi 4B, Texas Instruments DLPDLCR2000EVM
- Prio #2: [TRL 7] MVPα: motherboard chipset Intel Z790, CPU Intel Core i7-13850HX, DLP PCB, SDRS PCB, IFF PCB
- Prio #3: [TRL 8] MVPβ: SDR2 PCB, add-on (software defined antenna, optional battery, continuous wind capture impellers)
- Prio #4: [TRL 9] MMPδ: add-on (auto tourniquets, Care Under Fire set, handheld metal re-radiation radar)
- Prio #5: MMPγ: add-on (digital sight)
bar:milestone0501 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Prototype color:TRL5 from:20/08/2024 till:01/07/2025 color:TRL6 from:01/07/2025 till:01/10/2025
bar:milestone0502 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:MVP color:TRL6 from:01/07/2025 till:01/10/2025 color:TRL7 from:01/10/2025 till:01/04/2026
bar:milestone0503 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:MMP color:TRL8 from:01/04/2026 till:01/07/2026 color:TRL9 from:01/07/2026 till:01/10/2026
bar:milestone0504 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Add-on set 1 color:TRL5 from:09/03/2026 till:22/03/2026 color:TRL6 from:23/03/2026 till:05/04/2026 color:TRL7 from:06/04/2026 till:19/04/2026 color:TRL8 from:20/04/2026 till:03/05/2026 color:TRL9 from:29/06/2026 till:05/07/2026
bar:milestone0505 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Add-on set 2 color:TRL5 from:04/05/2026 till:17/05/2026 color:TRL6 from:18/05/2026 till:31/05/2026 color:TRL7 from:01/06/2026 till:14/06/2026 color:TRL8 from:15/06/2026 till:28/06/2026 color:TRL9 from:06/07/2026 till:12/07/2026
- Software Development: Hedy Lamarr Team
- SDR, SDR Scan, RDF, Radar Detection, IFF, Networks, Remote control
- Prio #1: IFF, NET, RDF, RFDD, RWRC, SDRS
- Prio #2: P2P, RPAC, SDR2
- Prio #3: ANTC, EODD, PCSR
- Prio #4: APAR, FTRC, RBRC, UVRC
- Prio #5:
bar:milestone0601 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:IFF color:TRL5 from:11/05/2025 till:24/05/2025 color:TRL6 from:25/05/2025 till:09/06/2025 color:TRL7 from:02/09/2025 till:15/09/2025 color:TRL8 from:09/06/2026 till:22/06/2026 color:TRL9 from:20/10/2026 till:26/10/2026
bar:milestone0602 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:NET color:TRL5 from:10/06/2025 till:23/06/2025 color:TRL6 from:24/06/2025 till:06/07/2025 color:TRL7 from:16/09/2025 till:29/09/2025 color:TRL8 from:23/06/2026 till:05/07/2026 color:TRL9 from:27/10/2026 till:02/11/2026
bar:milestone0603 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:RDF color:TRL5 from:07/07/2025 till:20/07/2025 color:TRL6 from:21/07/2025 till:04/08/2025 color:TRL7 from:30/09/2025 till:13/10/2025 color:TRL8 from:06/07/2026 till:19/07/2026 color:TRL9 from:03/11/2026 till:09/11/2026
bar:milestone0604 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:RFDD color:TRL5 from:05/08/2025 till:18/08/2025 color:TRL6 from:19/08/2025 till:01/09/2025 color:TRL7 from:14/10/2025 till:27/10/2025 color:TRL8 from:20/07/2026 till:03/08/2026 color:TRL9 from:10/11/2026 till:16/11/2026
bar:milestone0605 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:RWRC color:TRL5 from:28/10/2025 till:10/11/2025 color:TRL6 from:11/11/2025 till:24/11/2025 color:TRL7 from:01/03/2026 till:14/03/2026 color:TRL8 from:04/08/2026 till:17/08/2026 color:TRL9 from:17/11/2026 till:23/11/2026
bar:milestone0606 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:SDRS color:TRL5 from:25/11/2025 till:07/12/2025 color:TRL6 from:08/12/2025 till:21/12/2025 color:TRL7 from:15/03/2026 till:28/03/2026 color:TRL8 from:18/08/2026 till:31/08/2026 color:TRL9 from:24/11/2026 till:30/11/2026
bar:milestone0607 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:P2P color:TRL5 from:22/12/2025 till:05/01/2026 color:TRL6 from:06/01/2026 till:19/01/2026 color:TRL7 from:12/04/2026 till:25/04/2026 color:TRL8 from:01/09/2026 till:14/09/2026 color:TRL9 from:30/11/2026 till:06/12/2026
bar:milestone0608 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:RPAC color:TRL5 from:20/01/2026 till:02/02/2026 color:TRL6 from:03/02/2026 till:16/02/2026 color:TRL7 from:17/02/2026 till:28/02/2026 color:TRL8 from:15/09/2026 till:28/09/2026 color:TRL9 from:07/12/2026 till:13/12/2026
bar:milestone0609 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:SDR2 color:TRL5 from:26/04/2026 till:08/05/2026 color:TRL6 from:09/05/2026 till:22/05/2026 color:TRL7 from:23/05/2026 till:08/06/2026 color:TRL8 from:29/09/2026 till:12/10/2026 color:TRL9 from:14/12/2026 till:20/12/2026
bar:milestone0610 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:ANTC color:TRL5 from:21/12/2026 till:04/01/2027 color:TRL6 from:05/01/2027 till:18/01/2027 color:TRL7 from:19/01/2027 till:01/02/2027 color:TRL8 from:02/02/2027 till:15/02/2027 color:TRL9 from:25/04/2027 till:30/04/2027
bar:milestone0611 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:EODD color:TRL5 from:16/02/2027 till:28/02/2027 color:TRL6 from:28/02/2027 till:13/03/2027 color:TRL7 from:14/03/2027 till:27/03/2027 color:TRL8 from:11/04/2027 till:24/04/2027 color:TRL9 from:01/05/2027 till:07/05/2027
bar:milestone0612 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:PCSR color:TRL5 from:08/05/2027 till:21/05/2027 color:TRL6 from:22/05/2027 till:07/06/2027 color:TRL7 from:08/06/2027 till:21/06/2027 color:TRL8 from:22/06/2027 till:04/07/2027 color:TRL9 from:31/08/2027 till:06/09/2027
bar:milestone0613 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:APAR color:TRL5 from:05/07/2027 till:18/07/2027 color:TRL6 from:19/07/2027 till:02/08/2027 color:TRL7 from:03/08/2027 till:16/08/2027 color:TRL8 from:17/08/2027 till:30/08/2027 color:TRL9 from:07/09/2027 till:13/09/2027
bar:milestone0614 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:FTRC color:TRL5 from:14/09/2027 till:27/09/2027 color:TRL6 from:18/09/2027 till:11/10/2027 color:TRL7 from:12/10/2027 till:25/10/2027 color:TRL8 from:26/10/2027 till:08/11/2027 color:TRL9 from:04/01/2028 till:10/01/2028
bar:milestone0615 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:RBRC color:TRL5 from:09/11/2027 till:22/11/2027 color:TRL6 from:23/11/2027 till:05/12/2027 color:TRL7 from:06/12/2027 till:19/12/2027 color:TRL8 from:20/12/2027 till:03/01/2028 color:TRL9 from:11/01/2028 till:17/01/2028
bar:milestone0616 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:UVRC color:TRL5 from:18/01/2028 till:31/01/2028 color:TRL6 from:01/02/2028 till:14/02/2028 color:TRL7 from:15/02/2028 till:28/02/2028 color:TRL8 from:29/02/2028 till:12/03/2028 color:TRL9 from:13/03/2028 till:19/03/2028
- Software Development: Grace Hopper Team
- System Integration, DevOps, Maps, VBS, Sensors
- Prio #1: CAM, DISP, FPAD, GNSS, HT, INP, MMC, PTTH, SPOT, SRV, STT, SYS, VOVR
- Prio #2: ACC, ADM, FILE, DVC, MAP, NAV, PATH, REC, PLAY, SEC, STM
- Prio #3: TRSL
- Prio #4: VBS
- Prio #5:
bar:milestone0701 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:CAM color:TRL5 from:11/05/2025 till:24/05/2025 color:TRL6 from:25/05/2025 till:09/06/2025 color:TRL7 from:02/09/2025 till:15/09/2025 color:TRL8 from:09/06/2026 till:22/06/2026 color:TRL9 from:20/10/2026 till:26/10/2026
bar:milestone0702 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:DISP color:TRL5 from:11/05/2025 till:24/05/2025 color:TRL6 from:25/05/2025 till:09/06/2025 color:TRL7 from:02/09/2025 till:15/09/2025 color:TRL8 from:09/06/2026 till:22/06/2026 color:TRL9 from:20/10/2026 till:26/10/2026
bar:milestone0703 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:FPAD color:TRL5 from:10/06/2025 till:23/06/2025 color:TRL6 from:24/06/2025 till:06/07/2025 color:TRL7 from:16/09/2025 till:29/09/2025 color:TRL8 from:23/06/2026 till:05/07/2026 color:TRL9 from:27/10/2026 till:02/11/2026
bar:milestone0704 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:GNSS color:TRL5 from:10/06/2025 till:23/06/2025 color:TRL6 from:24/06/2025 till:06/07/2025 color:TRL7 from:16/09/2025 till:29/09/2025 color:TRL8 from:23/06/2026 till:05/07/2026 color:TRL9 from:27/10/2026 till:02/11/2026
bar:milestone0705 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:HT color:TRL5 from:07/07/2025 till:20/07/2025 color:TRL6 from:21/07/2025 till:04/08/2025 color:TRL7 from:30/09/2025 till:13/10/2025 color:TRL8 from:06/07/2026 till:19/07/2026 color:TRL9 from:03/11/2026 till:09/11/2026
bar:milestone0706 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:INP color:TRL5 from:07/07/2025 till:20/07/2025 color:TRL6 from:21/07/2025 till:04/08/2025 color:TRL7 from:30/09/2025 till:13/10/2025 color:TRL8 from:06/07/2026 till:19/07/2026 color:TRL9 from:03/11/2026 till:09/11/2026
bar:milestone0707 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:MMC color:TRL5 from:05/08/2025 till:18/08/2025 color:TRL6 from:19/08/2025 till:01/09/2025 color:TRL7 from:14/10/2025 till:27/10/2025 color:TRL8 from:20/07/2026 till:03/08/2026 color:TRL9 from:10/11/2026 till:16/11/2026
bar:milestone0708 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:PTTH color:TRL5 from:05/08/2025 till:18/08/2025 color:TRL6 from:19/08/2025 till:01/09/2025 color:TRL7 from:14/10/2025 till:27/10/2025 color:TRL8 from:20/07/2026 till:03/08/2026 color:TRL9 from:10/11/2026 till:16/11/2026
bar:milestone0709 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:SPOT color:TRL5 from:28/10/2025 till:10/11/2025 color:TRL6 from:11/11/2025 till:24/11/2025 color:TRL7 from:01/03/2026 till:14/03/2026 color:TRL8 from:04/08/2026 till:17/08/2026 color:TRL9 from:17/11/2026 till:23/11/2026
bar:milestone0710 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:SRV color:TRL5 from:28/10/2025 till:10/11/2025 color:TRL6 from:11/11/2025 till:24/11/2025 color:TRL7 from:01/03/2026 till:14/03/2026 color:TRL8 from:04/08/2026 till:17/08/2026 color:TRL9 from:17/11/2026 till:23/11/2026
bar:milestone0711 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:STT color:TRL5 from:25/11/2025 till:07/12/2025 color:TRL6 from:08/12/2025 till:21/12/2025 color:TRL7 from:15/03/2026 till:28/03/2026 color:TRL8 from:18/08/2026 till:31/08/2026 color:TRL9 from:24/11/2026 till:30/11/2026
bar:milestone0712 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:SYS color:TRL5 from:25/11/2025 till:07/12/2025 color:TRL6 from:08/12/2025 till:21/12/2025 color:TRL7 from:15/03/2026 till:28/03/2026 color:TRL8 from:18/08/2026 till:31/08/2026 color:TRL9 from:24/11/2026 till:30/11/2026
bar:milestone0713 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:VOVR color:TRL5 from:22/12/2025 till:05/01/2026 color:TRL6 from:06/01/2026 till:19/01/2026 color:TRL7 from:12/04/2026 till:25/04/2026 color:TRL8 from:01/09/2026 till:14/09/2026 color:TRL9 from:30/11/2026 till:06/12/2026
bar:milestone0714 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:ACC color:TRL5 from:22/12/2025 till:05/01/2026 color:TRL6 from:06/01/2026 till:19/01/2026 color:TRL7 from:12/04/2026 till:25/04/2026 color:TRL8 from:01/09/2026 till:14/09/2026 color:TRL9 from:30/11/2026 till:06/12/2026
bar:milestone0715 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:ADM color:TRL5 from:20/01/2026 till:02/02/2026 color:TRL6 from:03/02/2026 till:16/02/2026 color:TRL7 from:17/02/2026 till:28/02/2026 color:TRL8 from:15/09/2026 till:28/09/2026 color:TRL9 from:07/12/2026 till:13/12/2026
bar:milestone0716 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:FILE color:TRL5 from:20/01/2026 till:02/02/2026 color:TRL6 from:03/02/2026 till:16/02/2026 color:TRL7 from:17/02/2026 till:28/02/2026 color:TRL8 from:15/09/2026 till:28/09/2026 color:TRL9 from:07/12/2026 till:13/12/2026
bar:milestone0717 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:DVC color:TRL5 from:26/04/2026 till:08/05/2026 color:TRL6 from:09/05/2026 till:22/05/2026 color:TRL7 from:23/05/2026 till:08/06/2026 color:TRL8 from:29/09/2026 till:12/10/2026 color:TRL9 from:14/12/2026 till:20/12/2026
bar:milestone0718 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:MAP color:TRL5 from:26/04/2026 till:08/05/2026 color:TRL6 from:09/05/2026 till:22/05/2026 color:TRL7 from:23/05/2026 till:08/06/2026 color:TRL8 from:29/09/2026 till:12/10/2026 color:TRL9 from:14/12/2026 till:20/12/2026
bar:milestone0719 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:NAV color:TRL5 from:21/12/2026 till:04/01/2027 color:TRL6 from:05/01/2027 till:18/01/2027 color:TRL7 from:19/01/2027 till:01/02/2027 color:TRL8 from:02/02/2027 till:15/02/2027 color:TRL9 from:25/04/2027 till:30/04/2027
bar:milestone0720 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:PATH color:TRL5 from:21/12/2026 till:04/01/2027 color:TRL6 from:05/01/2027 till:18/01/2027 color:TRL7 from:19/01/2027 till:01/02/2027 color:TRL8 from:02/02/2027 till:15/02/2027 color:TRL9 from:25/04/2027 till:30/04/2027
bar:milestone0721 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:REC color:TRL5 from:16/02/2027 till:28/02/2027 color:TRL6 from:28/02/2027 till:13/03/2027 color:TRL7 from:14/03/2027 till:27/03/2027 color:TRL8 from:11/04/2027 till:24/04/2027 color:TRL9 from:01/05/2027 till:07/05/2027
bar:milestone0722 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:PLAY color:TRL5 from:16/02/2027 till:28/02/2027 color:TRL6 from:28/02/2027 till:13/03/2027 color:TRL7 from:14/03/2027 till:27/03/2027 color:TRL8 from:11/04/2027 till:24/04/2027 color:TRL9 from:01/05/2027 till:07/05/2027
bar:milestone0723 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:SEC color:TRL5 from:08/05/2027 till:21/05/2027 color:TRL6 from:22/05/2027 till:07/06/2027 color:TRL7 from:08/06/2027 till:21/06/2027 color:TRL8 from:22/06/2027 till:04/07/2027 color:TRL9 from:31/08/2027 till:06/09/2027
bar:milestone0724 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:STM color:TRL5 from:08/05/2027 till:21/05/2027 color:TRL6 from:22/05/2027 till:07/06/2027 color:TRL7 from:08/06/2027 till:21/06/2027 color:TRL8 from:22/06/2027 till:04/07/2027 color:TRL9 from:31/08/2027 till:06/09/2027
bar:milestone0725 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:TRSL color:TRL5 from:05/07/2027 till:18/07/2027 color:TRL6 from:19/07/2027 till:02/08/2027 color:TRL7 from:03/08/2027 till:16/08/2027 color:TRL8 from:17/08/2027 till:30/08/2027 color:TRL9 from:07/09/2027 till:13/09/2027
bar:milestone0726 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:VBS color:TRL5 from:05/07/2027 till:18/07/2027 color:TRL6 from:19/07/2027 till:02/08/2027 color:TRL7 from:03/08/2027 till:16/08/2027 color:TRL8 from:17/08/2027 till:30/08/2027 color:TRL9 from:07/09/2027 till:13/09/2027
- Software Development: Evelyn Berezin Team
- IMS, Chat, Workgroups, Tasks, Mission planning
- Prio #1: CHAT, IMSG,
- Prio #2: CRPT, MSG, TSK, WGR
- Prio #3: ANLS, CAL, MAIL, PLAN
- Prio #4: WIKI
- Prio #5:
bar:milestone0801 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:CHAT color:TRL5 from:11/05/2025 till:24/05/2025 color:TRL6 from:25/05/2025 till:09/06/2025 color:TRL7 from:02/09/2025 till:15/09/2025 color:TRL8 from:09/06/2026 till:22/06/2026 color:TRL9 from:20/10/2026 till:26/10/2026
bar:milestone0802 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:IMSG color:TRL5 from:10/06/2025 till:23/06/2025 color:TRL6 from:24/06/2025 till:06/07/2025 color:TRL7 from:16/09/2025 till:29/09/2025 color:TRL8 from:23/06/2026 till:05/07/2026 color:TRL9 from:27/10/2026 till:02/11/2026
bar:milestone0803 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:CRPT color:TRL5 from:07/07/2025 till:20/07/2025 color:TRL6 from:21/07/2025 till:04/08/2025 color:TRL7 from:30/09/2025 till:13/10/2025 color:TRL8 from:06/07/2026 till:19/07/2026 color:TRL9 from:03/11/2026 till:09/11/2026
bar:milestone0804 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:MSG color:TRL5 from:05/08/2025 till:18/08/2025 color:TRL6 from:19/08/2025 till:01/09/2025 color:TRL7 from:14/10/2025 till:27/10/2025 color:TRL8 from:20/07/2026 till:03/08/2026 color:TRL9 from:10/11/2026 till:16/11/2026
bar:milestone0805 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:TSK color:TRL5 from:28/10/2025 till:10/11/2025 color:TRL6 from:11/11/2025 till:24/11/2025 color:TRL7 from:01/03/2026 till:14/03/2026 color:TRL8 from:04/08/2026 till:17/08/2026 color:TRL9 from:17/11/2026 till:23/11/2026
bar:milestone0806 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:WGR color:TRL5 from:25/11/2025 till:07/12/2025 color:TRL6 from:08/12/2025 till:21/12/2025 color:TRL7 from:15/03/2026 till:28/03/2026 color:TRL8 from:18/08/2026 till:31/08/2026 color:TRL9 from:24/11/2026 till:30/11/2026
bar:milestone0807 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:ANLS color:TRL5 from:22/12/2025 till:05/01/2026 color:TRL6 from:06/01/2026 till:19/01/2026 color:TRL7 from:12/04/2026 till:25/04/2026 color:TRL8 from:01/09/2026 till:14/09/2026 color:TRL9 from:30/11/2026 till:06/12/2026
bar:milestone0808 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:CAL color:TRL5 from:20/01/2026 till:02/02/2026 color:TRL6 from:03/02/2026 till:16/02/2026 color:TRL7 from:17/02/2026 till:28/02/2026 color:TRL8 from:15/09/2026 till:28/09/2026 color:TRL9 from:07/12/2026 till:13/12/2026
bar:milestone0809 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:MAIL color:TRL5 from:26/04/2026 till:08/05/2026 color:TRL6 from:09/05/2026 till:22/05/2026 color:TRL7 from:23/05/2026 till:08/06/2026 color:TRL8 from:29/09/2026 till:12/10/2026 color:TRL9 from:14/12/2026 till:20/12/2026
bar:milestone0810 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:PLAN color:TRL5 from:21/12/2026 till:04/01/2027 color:TRL6 from:05/01/2027 till:18/01/2027 color:TRL7 from:19/01/2027 till:01/02/2027 color:TRL8 from:02/02/2027 till:15/02/2027 color:TRL9 from:25/04/2027 till:30/04/2027
bar:milestone0811 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:WIKI color:TRL5 from:16/02/2027 till:28/02/2027 color:TRL6 from:28/02/2027 till:13/03/2027 color:TRL7 from:14/03/2027 till:27/03/2027 color:TRL8 from:11/04/2027 till:24/04/2027 color:TRL9 from:01/05/2027 till:07/05/2027
- Software Development: Barbara Askins Team
- Computer Vision, Computer Audition, AI/ML, AI/DL, AI/NLP, AI/ANN
- Prio #1: TESS
- Prio #2: CVC, FA
- Prio #3: CAC
- Prio #4: VM
- Prio #5:
bar:milestone0901 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:TESS color:TRL5 from:11/05/2025 till:24/05/2025 color:TRL6 from:25/05/2025 till:09/06/2025 color:TRL7 from:02/09/2025 till:15/09/2025 color:TRL8 from:09/06/2026 till:22/06/2026 color:TRL9 from:20/10/2026 till:26/10/2026
bar:milestone0902 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:CVC color:TRL5 from:10/06/2025 till:23/06/2025 color:TRL6 from:24/06/2025 till:06/07/2025 color:TRL7 from:16/09/2025 till:29/09/2025 color:TRL8 from:23/06/2026 till:05/07/2026 color:TRL9 from:27/10/2026 till:02/11/2026
bar:milestone0903 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:FA color:TRL5 from:07/07/2025 till:20/07/2025 color:TRL6 from:21/07/2025 till:04/08/2025 color:TRL7 from:30/09/2025 till:13/10/2025 color:TRL8 from:06/07/2026 till:19/07/2026 color:TRL9 from:03/11/2026 till:09/11/2026
bar:milestone0904 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:CAC color:TRL5 from:05/08/2025 till:18/08/2025 color:TRL6 from:19/08/2025 till:01/09/2025 color:TRL7 from:14/10/2025 till:27/10/2025 color:TRL8 from:20/07/2026 till:03/08/2026 color:TRL9 from:10/11/2026 till:16/11/2026
bar:milestone0905 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:VM color:TRL5 from:28/10/2025 till:10/11/2025 color:TRL6 from:11/11/2025 till:24/11/2025 color:TRL7 from:01/03/2026 till:14/03/2026 color:TRL8 from:04/08/2026 till:17/08/2026 color:TRL9 from:17/11/2026 till:23/11/2026
- Networking: Margaret Hamilton Team
- Mentor Relations, Pitches, Updates
- Prio #1: Mentor Relations, Updates
- Prio #2: Business angels (pre-seed round)
- Prio #3: Business angels & Venture capital (seed round)
- Prio #4: Venture capital (round A)
- Prio #5:
bar:milestone1001 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Mentorship color:PROCESS from:20/07/2024 till:01/07/2027
bar:milestone1002 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Updates, PR color:PROCESS from:01/10/2024 till:31/12/2028
bar:milestone1003 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Investors color:PROCESS from:01/11/2024 till:01/04/2025 color:PROCESS from:01/05/2025 till:01/10/2025 color:PROCESS from:01/11/2025 till:01/04/2026 color:PROCESS from:01/07/2027 till:01/01/2028
bar:milestone1004 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Cofounders in Germany color:PROCESS from:01/01/2025 till:01/04/2025 color:PROCESS from:01/09/2025 till:01/01/2026 color:PROCESS from:01/07/2026 till:01/01/2027
bar:milestone1005 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Cofounders in the U.S. color:PROCESS from:01/04/2025 till:01/09/2025 color:PROCESS from:01/01/2026 till:01/07/2026 color:PROCESS from:01/01/2027 till:31/12/2028
- Customer & Business Development: Barbara Liskov Team
- Requests, eMails, PR, Meetings
- Prio #1: Innovation programs research, requests, eMails, meetings
- Prio #2: Collaboration research, PR
- Prio #3: Proving ground testing
- Prio #4: Pilot programs
bar:milestone1101 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:DoD programs research color:PROCESS from:01/01/2025 till:31/12/2028
bar:milestone1102 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Collaboration research color:PROCESS from:01/01/2025 till:31/12/2028
bar:milestone1103 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Proving ground testing color:PROCESS from:01/04/2026 till:01/01/2028
bar:milestone1104 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Pilot programs color:PROCESS from:01/10/2026 till:31/12/2028
bar:milestone1105 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Experimental manufacturing color:PROCESS from:01/10/2025 till:31/12/2028
bar:milestone1106 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Serial mfg in Germany color:PROCESS from:01/07/2026 till:31/12/2028
bar:milestone1107 width:10 textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Serial mfg in the U.S. color:PROCESS from:01/10/2028 till:31/12/2028
bar:0 width:1 textcolor:red at:15/03/2025 shift:(-15,-4) text:Pre-Seed textcolor:red at:15/09/2025 shift:(-10,-4) text:Seed textcolor:red at:15/03/2026 shift:(-15,-4) text:round A textcolor:red at:15/12/2027 shift:(-15,-4) text:round B
bar:99 width:1 textcolor:oceanblue at:01/07/2025 shift:(-25,-4) text:MVP Alpha > textcolor:oceanblue at:01/01/2026 shift:(-25,-4) text:MVP Beta > textcolor:oceanblue at:01/10/2026 shift:(-25,-4) text:MMP Gamma > textcolor:oceanblue at:01/01/2027 shift:(25,-4) text:MMP Delta >
LineData=
at:$now color:TODAY width:0.2
at:01/07/2025 color:powderblue width:0.2 layer:back #deadline of end TRL-6 (MVPα) at:01/01/2026 color:powderblue width:0.2 layer:back #deadline of end TRL-7 (MVPβ) at:01/10/2026 color:powderblue width:0.2 layer:back #deadline of end TRL-8 (MMPδ) at:01/04/2027 color:powderblue width:0.2 layer:back #deadline of end TRL-9 (MMPγ)
at:25/03/2025 color:pink width:10 layer:back at:25/09/2025 color:pink width:10 layer:back at:25/03/2026 color:pink width:10 layer:back at:25/12/2027 color:pink width:10 layer:back
</timeline>
Investment Rounds Goals
| Time Period | Round | Amount | Goals |
|---|---|---|---|
| Q1 2025 | Pre-Seed | $1,750,000 |
|
| Q3 2025 | Seed | $6,700,000 |
|
| Q1 2026 | Round A | $16,000,000 |
|
| Q4 2027 | Round B | $85,000,000 |
|
Development Teams
Design Development & Algorithm Architecture: Ada Lovelace[7] Team
Device design, GUI, VUI, Apps algorithms, Demos, Videos, Animations
- Prio #1: Research and description of the principle of operation, description of the technology application, computer-added design, event-driven software architecture[8]
- Prio #2: Technology functionality demo, specific functionality description, GUI demo, lab experimental setup
Mechanical Engineering: Stephanie Kwolek[9] Team
- Prio #1: [TRL 5-6] Prototype: based on 3D print, vacuum casting, vacuum unfusion
- Prio #2: [TRL 7] MVPα: vacuum casting, vacuum unfusion, injection moulding, manual assembly
- Prio #3: [TRL 8] MVPβ: vacuum casting, vacuum unfusion, injection moulding, manual assembly
- Prio #4: [TRL 9] MMPδ: manufacturing process automation, robotic assembly, add-ons (auto tourniquets, Care Under Fire set, SCBA integration, external aramid cover, continuous wind сapture impellers, software defined antenna, handheld metal re-radiation radar, optional battery, digital sight)
- Prio #5: MMPγ: manufacturing & assembly & logistic process upgrade
Optical Engineering: Katharine Blodgett[10] Team
Light guide, Beam splitting prisms, Dichroic mirror, Optical coatings, Fading pads
- Prio #1: [TRL 5-6] Prototype: optical scheme, light guide, dichroic mirror, fading pads
- Prio #2: [TRL 7] MVPα: beam splitting prisms for 3 cam sensors, optical coatings
- Prio #3: [TRL 8] MVPβ:
- Prio #4: [TRL 9] MMPδ:
- Prio #5: MMPγ:
Electronics Engineering: Ida Hyde[11] Team
Schematics and PCBs for motherboard, projector, IFF Transponder, SDR, SDRS, PCSR, Digital sight
- Prio #1: [TRL 5-6] Prototype: based on Raspberry Pi 5B, Texas Instruments DLPDLCR2000EVM
- Prio #2: [TRL 7] MVPα: motherboard chipset Intel 700, Z790[12] or HM770[13], CPU Intel Core i7-14700HX[14][15], DLP PCB, SDRS PCB, IFF PCB
- Prio #3: [TRL 8] MVPβ: SDR2 PCB, add-on (software defined antenna, optional battery, continuous wind capture impellers)
- Prio #4: [TRL 9] MMPδ: add-on (auto tourniquets, Care Under Fire set, handheld metal re-radiation radar)
- Prio #5: MMPγ: add-on (digital sight)
Software Development: Hedy Lamarr[16] Team
SDR, SDR Scan, RDF, Radar Detection, IFF, Networks, Remote control
- Prio #1: IFF, NET, RDF, RFDD, RWRC, SDRS
- Prio #2: P2P, RPAC, SDR2
- Prio #3: ANTC, EODD, PCSR
- Prio #4: APAR, FTRC, RBRC, UVRC
- Prio #5:
Software Development: Grace Hopper[17] Team
System Integration, DevOps, Maps, VBS, Sensors
- Prio #1: CAM, DISP, FPAD, GNSS, HT, INP, MMC, PTTH, SPOT, SRV, STT, SYS, VOVR
- Prio #2: ACC, ADM, FILE, DVC, MAP, NAV, PATH, REC, PLAY, SEC, STM
- Prio #3: TRSL
- Prio #4: VBS
- Prio #5:
Software Development: Evelyn Berezin[18] Team
IMS, Chat, Workgroups, Tasks, Mission planning
- Prio #1: CHAT, IMSG,
- Prio #2: CRPT, MSG, TSK, WGR
- Prio #3: ANLS, CAL, MAIL, PLAN
- Prio #4: WIKI
- Prio #5:
Software Development: Barbara Askins[19] Team
Computer Vision, Computer Audition, AI/ML, AI/DL, AI/NLP, AI/ANN
Networking: Margaret Hamilton[20] Team
Mentor Relations, Pitches, Updates
- Prio #1: Mentor Relations, Updates
- Prio #2: Business angels (pre-seed round)
- Prio #3: Business angels & Venture capital (seed round)
- Prio #4: Venture capital (round A)
- Prio #5:
Customer & Business Development: Barbara Liskov[21] Team
Requests, eMails, PR, Meetings
- Prio #1: Innovation programs research, requests, eMails, meetings
- Prio #2: Collaboration research, PR
- Prio #3: Proving ground testing
- Prio #4: Pilot programms
Future ideas
Further reading
FAQ
- Problems and strategic capabilities
- Target audience
- Market
- Product characteristics and features
- Major product milestones
- Stages of product evolution
- Lifetime value
- Comparison with nearest competitors
- Competitive advantages
- Hardware unit economy
- Estimated budget for the first year after R&D
- Team
- Road Map
- Financial Ask and Use of Funds
- Experience investing in defense startups
See also
| Public External Sections: | Public Wiki Sections: | Public Wiki Sections: | Not-Public Wiki Sections: |
|---|---|---|---|
Note: Unless otherwise stated, whenever the masculine gender is used, both men and women are included.
See also product details
| Hardware Details: | Functional Apps Details: | Executive Apps Details: | Service Apps Details: |
|---|---|---|---|
References
- ↑ Dr. John Niemela and Dr. Matthew Fisher, The Use of Technology Readiness Levels for Software Development
- ↑ TRL-IRL-SRL Definitions
- ↑ OUSD(R&E), Technology Readiness Assessment Guidebook, 2023
- ↑ Dr. John Niemela and Dr. Matthew Fisher, The Use of Technology Readiness Levels for Software Development
- ↑ TRL-IRL-SRL Definitions
- ↑ OUSD(R&E), Technology Readiness Assessment Guidebook, 2023
- ↑ Wikipedia, Ada Lovelace
- ↑ Wikipedia, Event-driven software architecture (EDA)
- ↑ Wikipedia, Stephanie Kwolek
- ↑ Wikipedia, Katharine Burr Blodgett
- ↑ Wikipedia, Ida Henrietta Hyde
- ↑ Intel Z790 Chipset
- ↑ Intel HM770 Chipset
- ↑ Intel, 14th Gen Core i7
- ↑ Intel Core i7 13th Gen HX (for mobile devices) Series, i7-13850HX Processor
- ↑ Wikipedia, Hedy Lamarr
- ↑ Wikipedia, Grace Hopper
- ↑ Wikipedia, Evelyn Berezin
- ↑ Wikipedia, Barbara Askins
- ↑ Wikipedia, Margaret Hamilton
- ↑ Wikipedia, Barbara Liskov