redirect Further information: Public:ARHUDFM Manifesto, Public:Graphical User Interface, Public:Applications, Public:DoD Pains, Public:ARHUDFM Features Summary, Public:Business Tables, Deck "Tactical Situational Awareness Mobility Platform (Headset)", Deck "Unmanned Airship Drone Platform" (aerospace & wildfire expert edition), Deck "24/7 Airborne C-UAS Long-Range AI-driven Defense Platform" (military edition)

Traction

Milestones

Annotation

Technology Readiness Level (TRL)
TRL NASA usage DoD usage[1][2][3] European Union Description
1 Basic principles observed and reported Scientific research begins to be translated into applied R&D Basic principles observed Lowest level of technology readiness. Scientific research begins to be translated into applied research & development (R&D). Examples might include paper studies of a technology’s basic properties.
2 Technology concept and/or application formulated Invention begins. Once basic principles are observed, practical applications can be invented Technology concept formulated Invention begins. Once basic principles are observed, practical applications can be invented. Applications are speculative, & there may be no proof or detailed analysis to support the assumptions. Examples are limited to analytic studies.
3 Analytical and experimental critical function and/or characteristic proof-of concept Active R&D is initiated. This includes analytical studies to produce code and laboratory studies to physically validate analytical predictions of separate technology HW/SW elements Experimental proof of concept Active R&D is initiated. This includes analytical studies & laboratory studies to physically validate the analytical predictions of separate elements of the technology. Examples include components that are not yet integrated or representative.
4 Component and/or breadboard validation in laboratory environment Basic technological components are integrated to establish that they will work together. System SW architecture development initiated to include interoperability, reliability, maintainability, extensibility, scalability and security issues Technology validated in lab Basic technological components are integrated to establish that they will work together. System concepts have been considered and results gathered from testing laboratory scale breadboards.This is relatively “low fidelity” compared with the eventual system. Examples include integration of “ad hoc” hardware in the laboratory.
5 Component and/or breadboard validation in relevant environment The basic technological HW/SW components are integrated with reasonably realistic supporting elements so that they can be tested in a simulated environment Technology validated in relevant environment (industrially relevant environment in the case of key enabling technologies) Fidelity of breadboard technology increases significantly. The basic technological components are integrated with reasonably realistic supporting elements so they can be tested in a simulated environment representative of specific stressing conditions or the relevant environment. Examples include “high-fidelity” laboratory integration of components.
6 System/subsystem model or prototype demonstration in a relevant environment (ground or space) Examples include testing a prototype in a high-fidelity lab environment or a live/virtual experiment or in a simulated operational environment Technology demonstrated in relevant environment (industrially relevant environment in the case of key enabling technologies) Representative model or prototype system, which is well beyond that of TRL 5, is tested in a relevant environment. Represents a major step up in a technology’s demonstrated readiness. Examples include testing a prototype in a high-fidelity laboratory environment or in a simulated operational environment.
7 System prototype demonstration in a space environment Prototype near, or at, planned operational system. Algorithms run on processor of the operational environment integrated with actual external entities. SW support structure in place. SW releases are in distinct versions. Frequency and severity of SW deficiency reports do not significantly degrade functionality or performance. Verification, Validation and Accreditation (VV&A) completed System prototype demonstration in operational environment Prototype near or at planned operational system. Represents a major step up from TRL 6 by requiring demonstration of an actual system prototype in an operational environment (e.g., in an air-craft, in a vehicle, or in space).System definition, operational environment definition, test plan, test data, design analysis and evaluationTest plan, test reports, test data.Testing setup in surrogate vehicle, test plan, test data, test results, M&S results, model vs. actual component or environmental differences, key modeling characteristics.
8 Actual system completed and "flight qualified" through test and demonstration (ground or space) Technology and SW has been proven and demonstrated to work in its final form and under expected conditions. In almost all cases, TRL represents the end of true system development. Examples include developmental test and evaluation (T&E) of the system in its intended weapon system to determine if it meets design specifications System complete and qualified Technology has been proven to work in its final form & under expected conditions. In almost all cases, this TRL represents the end of true system development. Examples include developmental test & evaluation (DT&E) of the system in its intended weapon system to determine if it meets design specifications.Final assembly first article inspection results.Key functions and design characteristics, test plan, test data, test results.System qualification results, test data, test results.
9 Actual system "flight proven" through successful mission operations In almost all cases, this is the end of the last “bugfixing” aspects of system development. Examples include using the system under operational mission conditions. SW releases are production versions and configuration controlled. Frequency and severity of SW deficiencies are at a minimum Actual system proven in operational environment (competitive manufacturing in the case of key enabling technologies; or in space) Actual application of the technology in its final form & under mission conditions, such as those encountered in operational test & evaluation (OT&E). Examples include using the system under operational mission conditions.Operational evaluation report.System level test results.OT&E report.
Integration Readness Level (IRL)
IRL Definition Description Questions to Consider Suggested Evidence / Activities
1 Primary interfaces identified. High-level functions and interfaces with potential integration items (systems, subsystems, components) defined and understood. Are interfaces with potential integration items (systems, subsystems, components) and their functions defined/understood? A list and/or diagram of primary interfacing integration items (systems, subsystems, components) and their functions, Functional/physical architecture diagram
2 Basic characterization of primary interfaces performed. Interfaces qualitatively characterized with sufficient detail (inputs/outputs) to assess the feasibility of the proposed integration based on a high level CONOPs. Interface requirements and/or specifications defined/drafted. Are inputs/outputs of primary interfaces characterized and documented? Documented summary of inputs and outputs of primary interfaces or P-diagrams
Are primary interface requirements defined/drafted? Interface requirements document (e.g., Interoperability Profile [IOP], SAE J1939)
Is the high level CONOPS known/understood? High-level CONOPS
Have interface constraints (functional, physical, environmental, regulations, etc.) been defined? Defined constraints referencing ESOH, regulatory documentation, etc.
3 Text Text Text Text
4 Text Text Text Text
5 Text Text Text Text
6 Text Text Text Text
7 Text Text Text Text
8 Text Text Text Text
9 Text Text Text Text
Commercial Customer Readiness Level (CCRL)

Table

Mission Customer Readiness Level (MCRL)

Table

Manufacturing Readness Level (MRL)

Table

Commercial Funding Readiness Level (CFRL)

Table

Mission Funding Readiness Level (MFRL)

Table

Product-Market Fit

Positive Feedback

Challenges

Research & Development

???

???

Roadmap

redirect Main Article: Public:Business_Tables

<timeline> DateFormat = dd/mm/yyyy Define $width = 960 Define $warning = 300 Define $height = 2000 Define $dy = -5 # shift text to bottom side of bar Define $start = 2024 Define $end = 2028 Define $now = 25/04/2026

ImageSize = width:$width height:$height PlotArea = right:10 left:10 bottom:120 top:10 Period = from:$start till:$end TimeAxis = orientation:horizontal format:yyyy Legend = orientation:vertical position:bottom columns:4

Colors =

    id:bg              value:white
    id:lightline       value:gray(0.9)
    id:lighttext       value:gray(0.5)
    id:section         value:gray(0.9)
    id:TRL1            value:yellow2 Legend: TRL-1
    id:TRL2            value:orange Legend: TRL-2
    id:TRL3            value:oceanblue Legend: TRL-3
    id:TRL4            value:powderblue Legend: TRL-4
    id:TRL5            value:red Legend: TRL-5
    id:TRL6            value:lightpurple Legend: TRL-6
    id:TRL7            value:lavender Legend: TRL-7
    id:TRL8            value:claret Legend: TRL-8
    id:TRL9            value:brightblue Legend: TRL-9
    id:PILOT           value:green Legend: Pilot
    id:PROCESS         value:skyblue Legend: Process
    id:EVENT           value:drabgreen Legend: Event
    id:INVENTION       value:redorange Legend: Invention
    id:NAME            value:darkblue
    id:TODAY           value:yellowgreen

BackgroundColors = canvas:bg ScaleMinor = gridcolor:lightline unit:month increment:1 start:$start ScaleMajor = gridcolor:lighttext unit:year increment:1 start:2024

BarData=

 bar:title
  1. main milestones
 bar:section1
 bar:milestone0101
  1. Design Development & Algorithm Architecture: Ada Lovelace Team
 bar:section2
 bar:milestone0201
 bar:milestone0202
 bar:milestone0203
 bar:milestone0204
 bar:milestone0205
  1. Mechanical Engineering: Stephanie Kwolek Team
 bar:section3
 bar:milestone0301
 bar:milestone0302
 bar:milestone0303
 bar:milestone0304
 bar:milestone0305
 bar:milestone0306
  1. Optical Engineering: Katharine Blodgett Team
 bar:section4
 bar:milestone0401
 bar:milestone0402
 bar:milestone0403
  1. Electronics Engineering: Ida Hyde Team
 bar:section5
 bar:milestone0501
 bar:milestone0502
 bar:milestone0503
 bar:milestone0504
 bar:milestone0505
  1. Software Development: Hedy Lamarr Team
 bar:section6
 bar:milestone0601
 bar:milestone0602
 bar:milestone0603
 bar:milestone0604
 bar:milestone0605
 bar:milestone0606
 bar:milestone0607
 bar:milestone0608
 bar:milestone0609
 bar:milestone0610
 bar:milestone0611
 bar:milestone0612
 bar:milestone0613
 bar:milestone0614
 bar:milestone0615
 bar:milestone0616
  1. Software Development: Grace Hopper Team
 bar:section7
 bar:milestone0701
 bar:milestone0702
 bar:milestone0703
 bar:milestone0704
 bar:milestone0705
 bar:milestone0706
 bar:milestone0707
 bar:milestone0708
 bar:milestone0709
 bar:milestone0710
 bar:milestone0711
 bar:milestone0712
 bar:milestone0713
 bar:milestone0714
 bar:milestone0715
 bar:milestone0716
 bar:milestone0717
 bar:milestone0718
 bar:milestone0719
 bar:milestone0720
 bar:milestone0721
 bar:milestone0722
 bar:milestone0723
 bar:milestone0724
 bar:milestone0725
 bar:milestone0726
  1. Software Development: Evelyn Berezin Team
 bar:section8
 bar:milestone0801
 bar:milestone0802
 bar:milestone0803
 bar:milestone0804
 bar:milestone0805
 bar:milestone0806
 bar:milestone0807
 bar:milestone0808
 bar:milestone0809
 bar:milestone0810
 bar:milestone0811
  1. Software Development: Barbara Askins Team
 bar:section9
 bar:milestone0901
 bar:milestone0902
 bar:milestone0903
 bar:milestone0904
 bar:milestone0905
  1. Networking: Margaret Hamilton Team
 bar:section10
 bar:milestone1001
 bar:milestone1002
 bar:milestone1003
 bar:milestone1004
 bar:milestone1005
  1. Customer & Business Development: Barbara Liskov Team
 bar:section11
 bar:milestone1101
 bar:milestone1102
 bar:milestone1103
 bar:milestone1104
 bar:milestone1105
 bar:milestone1106
 bar:milestone1107


 bar:0
 bar:99
  1. explanation: attribute 'barset' instead of 'bar' means consecutive data lines are automatically placed on new bar
  2. data lines are lines containing at: or from: & till: attributes
  3. 'barset:break' means 'reset barcounter' = next line will be placed at first bar in barset
  4. 'barset:skip' means 'increment barcounter' = skip one bar for next data line (to allow extra space
  5. for text containing line break = ~)

PlotData=

 align:left 
 anchor:from 
 fontsize:M 
 width:15 
 shift:(4,-6) 
 textcolor:black
 color:section
 bar:title    from:start till:end text:"Project Development Roadmap" fontsize:XL anchor:middle align:center width:35 color:bg mark:(line,bg)
 bar:section1 from:start till:end text:"Milestones"
 bar:section2 from:start till:end text:"Design Development & Algorithm Architecture: Ada Lovelace Team"
 bar:section3 from:start till:end text:"Mechanical Engineering: Stephanie Kwolek Team"
 bar:section4 from:start till:end text:"Optical Engineering: Katharine Blodgett Team"
 bar:section5 from:start till:end text:"Electronics Engineering: Ida Hyde Team"
 bar:section6 from:start till:end text:"Software Development: Hedy Lamarr Team"
 bar:section7 from:start till:end text:"Software Development: Grace Hopper Team"
 bar:section8 from:start till:end text:"Software Development: Evelyn Berezin Team"
 bar:section9 from:start till:end text:"Software Development: Barbara Askins Team"
 bar:section10 from:start till:end text:"Networking: Margaret Hamilton Team"
 bar:section11 from:start till:end text:"Customer & Business Development: Barbara Liskov Team"
  1. main milestones
 bar:milestone0101 width:10
   textcolor:NAME at:01/01/2024 shift:(10,$dy) text:ARHUDFM Project
   color:TRL5 from:20/08/2024 till:01/07/2025
   color:TRL6 from:01/07/2025 till:01/10/2025
   color:TRL7 from:01/10/2025 till:01/04/2026
   color:TRL8 from:01/04/2026 till:01/07/2026
   color:TRL9 from:01/07/2026 till:01/10/2026
   color:PILOT from:01/10/2026 till:31/12/2028
  1. Design Development & Algorithm Architecture: Ada Lovelace Team
  1. CAD model update, GUI, VUI, Apps algorithms, Demos, Videos, Animations
  2. Prio #1: [TRL 1-2] Research and description of the principle of operation, description of the technology application, computer-added design
  3. Prio #2: [TRL 3-4] Technology functionality demo, specific functionality description, GUI demo, lab experimental setup
  4. Prio #3:
  5. Prio #4:
 bar:milestone0201 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Engineering design
   color:TRL6 from:01/07/2025 till:01/10/2025
   color:TRL7 from:01/10/2025 till:01/04/2026
   color:TRL8 from:01/04/2026 till:01/07/2026
   color:TRL9 from:01/07/2026 till:01/10/2026
 bar:milestone0202 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:GUI
   color:TRL5 from:20/08/2024 till:01/07/2025
   color:TRL6 from:01/07/2025 till:01/10/2025
   color:TRL7 from:01/10/2025 till:01/04/2026
   color:TRL8 from:01/04/2026 till:01/07/2026
   color:TRL9 from:01/07/2026 till:01/10/2026
 bar:milestone0203 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:VUI
   color:TRL5 from:20/08/2024 till:01/07/2025
   color:TRL6 from:01/07/2025 till:01/10/2025
   color:TRL7 from:01/10/2025 till:01/04/2026
   color:TRL8 from:01/04/2026 till:01/07/2026
   color:TRL9 from:01/07/2026 till:01/10/2026
 bar:milestone0204 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:SW architecture
   color:TRL4 from:01/01/2025 till:20/04/2025
   color:TRL5 from:20/04/2025 till:01/07/2025
   color:TRL6 from:01/07/2025 till:01/10/2025
   color:TRL7 from:01/10/2025 till:01/04/2026
   color:TRL8 from:01/04/2026 till:01/07/2026
   color:TRL9 from:01/07/2026 till:01/10/2026
 bar:milestone0205 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Content creation
   color:PROCESS from:01/10/2024 till:31/12/2028
  1. Mechanical Engineering: Stephanie Kwolek Team
  1. Prio #1: [TRL 5-6] Prototype: based on 3D print, vacuum casting, vacuum unfusion
  2. Prio #2: [TRL 7] MVPα: vacuum casting, vacuum unfusion, injection moulding, manual assembly
  3. Prio #3: [TRL 8] MVPβ: vacuum casting, vacuum unfusion, injection moulding, manual assembly
  4. Prio #4: [TRL 9] MMPδ: manufacturing process automation, robotic assembly, add-ons (auto tourniquets, Care Under Fire set)
  5. Prio #5: MMPγ: manufacturing & assembly & logistic process upgrade
 bar:milestone0301 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:3D print
   color:TRL5 from:20/08/2024 till:01/07/2025
   color:TRL6 from:01/07/2025 till:01/10/2025
   color:TRL7 from:01/10/2025 till:01/04/2026
 bar:milestone0302 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Vacuum casting
   color:TRL7 from:01/10/2025 till:01/04/2026
   color:TRL8 from:01/04/2026 till:01/07/2026
   color:TRL9 from:01/07/2026 till:01/10/2026
 bar:milestone0303 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Injection moulding
   color:TRL7 from:01/10/2025 till:01/04/2026
   color:TRL8 from:01/04/2026 till:01/07/2026
   color:TRL9 from:01/07/2026 till:01/10/2026
 bar:milestone0304 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Surface finishing
   color:TRL7 from:01/10/2025 till:01/04/2026
   color:TRL8 from:01/04/2026 till:01/07/2026
   color:TRL9 from:01/07/2026 till:01/10/2026
 bar:milestone0305 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Manual assembly
   color:TRL7 from:01/10/2025 till:01/04/2026
   color:TRL8 from:01/04/2026 till:01/07/2026
   color:TRL9 from:01/07/2026 till:01/10/2026
 bar:milestone0306 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Test tooling
   color:TRL7 from:01/10/2025 till:01/04/2026
   color:TRL8 from:01/04/2026 till:01/07/2026
   color:TRL9 from:01/07/2026 till:01/10/2026
  1. Optical Engineering: Katharine Blodgett Team
  1. Light guide, Beam splitting prisms, Dichroic mirror, Optical coatings, Fading pads
  2. Prio #1: [TRL 5-6] Prototype: optical scheme, light guide, dichroic mirror, fading pads
  3. Prio #2: [TRL 7] MVPα: beam splitting prisms for 3 cam sensors, optical coatings
  4. Prio #3: [TRL 8] MVPβ:
  5. Prio #4: [TRL 9] MMPδ:
  6. Prio #5: MMPγ:
 bar:milestone0401 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Lens system
   color:TRL5 from:20/08/2024 till:01/07/2025
   color:TRL6 from:01/07/2025 till:01/10/2025
   color:TRL7 from:01/10/2025 till:01/04/2026
   color:TRL8 from:01/04/2026 till:01/07/2026
   color:TRL9 from:01/07/2026 till:01/10/2026
 bar:milestone0402 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Optical coatings
   color:TRL5 from:01/03/2025 till:01/07/2025
   color:TRL6 from:01/07/2025 till:01/10/2025
   color:TRL7 from:01/10/2025 till:01/04/2026
   color:TRL8 from:01/04/2026 till:01/07/2026
   color:TRL9 from:01/07/2026 till:01/10/2026
 bar:milestone0403 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Fading pads
   color:TRL5 from:01/03/2025 till:01/07/2025
   color:TRL6 from:01/07/2025 till:01/10/2025
   color:TRL7 from:01/10/2025 till:01/04/2026
   color:TRL8 from:01/04/2026 till:01/07/2026
   color:TRL9 from:01/07/2026 till:01/10/2026
  1. Electronics Engineering: Ida Hyde Team
  1. Schematics and PCBs for motherboard, projector, IFF Transponder, SDR, SDRS, PCSR, Digital sight
  2. Prio #1: [TRL 5-6] Prototype: based on Raspberry Pi 4B, Texas Instruments DLPDLCR2000EVM
  3. Prio #2: [TRL 7] MVPα: motherboard chipset Intel Z790, CPU Intel Core i7-13850HX, DLP PCB, SDRS PCB, IFF PCB
  4. Prio #3: [TRL 8] MVPβ: SDR2 PCB, add-on (software defined antenna, optional battery, continuous wind capture impellers)
  5. Prio #4: [TRL 9] MMPδ: add-on (auto tourniquets, Care Under Fire set, handheld metal re-radiation radar)
  6. Prio #5: MMPγ: add-on (digital sight)
 bar:milestone0501 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Prototype
   color:TRL5 from:20/08/2024 till:01/07/2025
   color:TRL6 from:01/07/2025 till:01/10/2025
 bar:milestone0502 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:MVP
   color:TRL6 from:01/07/2025 till:01/10/2025
   color:TRL7 from:01/10/2025 till:01/04/2026
 bar:milestone0503 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:MMP
   color:TRL8 from:01/04/2026 till:01/07/2026
   color:TRL9 from:01/07/2026 till:01/10/2026
 bar:milestone0504 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Add-on set 1
   color:TRL5 from:09/03/2026 till:22/03/2026
   color:TRL6 from:23/03/2026 till:05/04/2026
   color:TRL7 from:06/04/2026 till:19/04/2026
   color:TRL8 from:20/04/2026 till:03/05/2026
   color:TRL9 from:29/06/2026 till:05/07/2026
 bar:milestone0505 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Add-on set 2
   color:TRL5 from:04/05/2026 till:17/05/2026
   color:TRL6 from:18/05/2026 till:31/05/2026
   color:TRL7 from:01/06/2026 till:14/06/2026
   color:TRL8 from:15/06/2026 till:28/06/2026
   color:TRL9 from:06/07/2026 till:12/07/2026
  1. Software Development: Hedy Lamarr Team
  1. SDR, SDR Scan, RDF, Radar Detection, IFF, Networks, Remote control
  2. Prio #1: IFF, NET, RDF, RFDD, RWRC, SDRS
  3. Prio #2: P2P, RPAC, SDR2
  4. Prio #3: ANTC, EODD, PCSR
  5. Prio #4: APAR, FTRC, RBRC, UVRC
  6. Prio #5:
 bar:milestone0601 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:IFF
   color:TRL5 from:11/05/2025 till:24/05/2025
   color:TRL6 from:25/05/2025 till:09/06/2025
   color:TRL7 from:02/09/2025 till:15/09/2025
   color:TRL8 from:09/06/2026 till:22/06/2026
   color:TRL9 from:20/10/2026 till:26/10/2026
 bar:milestone0602 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:NET
   color:TRL5 from:10/06/2025 till:23/06/2025
   color:TRL6 from:24/06/2025 till:06/07/2025
   color:TRL7 from:16/09/2025 till:29/09/2025
   color:TRL8 from:23/06/2026 till:05/07/2026
   color:TRL9 from:27/10/2026 till:02/11/2026
 bar:milestone0603 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:RDF
   color:TRL5 from:07/07/2025 till:20/07/2025
   color:TRL6 from:21/07/2025 till:04/08/2025
   color:TRL7 from:30/09/2025 till:13/10/2025
   color:TRL8 from:06/07/2026 till:19/07/2026
   color:TRL9 from:03/11/2026 till:09/11/2026
 bar:milestone0604 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:RFDD
   color:TRL5 from:05/08/2025 till:18/08/2025
   color:TRL6 from:19/08/2025 till:01/09/2025
   color:TRL7 from:14/10/2025 till:27/10/2025
   color:TRL8 from:20/07/2026 till:03/08/2026
   color:TRL9 from:10/11/2026 till:16/11/2026
 bar:milestone0605 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:RWRC
   color:TRL5 from:28/10/2025 till:10/11/2025
   color:TRL6 from:11/11/2025 till:24/11/2025
   color:TRL7 from:01/03/2026 till:14/03/2026
   color:TRL8 from:04/08/2026 till:17/08/2026
   color:TRL9 from:17/11/2026 till:23/11/2026
 bar:milestone0606 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:SDRS
   color:TRL5 from:25/11/2025 till:07/12/2025
   color:TRL6 from:08/12/2025 till:21/12/2025
   color:TRL7 from:15/03/2026 till:28/03/2026
   color:TRL8 from:18/08/2026 till:31/08/2026
   color:TRL9 from:24/11/2026 till:30/11/2026
 bar:milestone0607 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:P2P
   color:TRL5 from:22/12/2025 till:05/01/2026
   color:TRL6 from:06/01/2026 till:19/01/2026
   color:TRL7 from:12/04/2026 till:25/04/2026
   color:TRL8 from:01/09/2026 till:14/09/2026
   color:TRL9 from:30/11/2026 till:06/12/2026
 bar:milestone0608 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:RPAC
   color:TRL5 from:20/01/2026 till:02/02/2026
   color:TRL6 from:03/02/2026 till:16/02/2026
   color:TRL7 from:17/02/2026 till:28/02/2026
   color:TRL8 from:15/09/2026 till:28/09/2026
   color:TRL9 from:07/12/2026 till:13/12/2026
 bar:milestone0609 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:SDR2
   color:TRL5 from:26/04/2026 till:08/05/2026
   color:TRL6 from:09/05/2026 till:22/05/2026
   color:TRL7 from:23/05/2026 till:08/06/2026
   color:TRL8 from:29/09/2026 till:12/10/2026
   color:TRL9 from:14/12/2026 till:20/12/2026
 bar:milestone0610 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:ANTC
   color:TRL5 from:21/12/2026 till:04/01/2027
   color:TRL6 from:05/01/2027 till:18/01/2027
   color:TRL7 from:19/01/2027 till:01/02/2027
   color:TRL8 from:02/02/2027 till:15/02/2027
   color:TRL9 from:25/04/2027 till:30/04/2027
 bar:milestone0611 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:EODD
   color:TRL5 from:16/02/2027 till:28/02/2027
   color:TRL6 from:28/02/2027 till:13/03/2027
   color:TRL7 from:14/03/2027 till:27/03/2027
   color:TRL8 from:11/04/2027 till:24/04/2027
   color:TRL9 from:01/05/2027 till:07/05/2027
 bar:milestone0612 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:PCSR
   color:TRL5 from:08/05/2027 till:21/05/2027
   color:TRL6 from:22/05/2027 till:07/06/2027
   color:TRL7 from:08/06/2027 till:21/06/2027
   color:TRL8 from:22/06/2027 till:04/07/2027
   color:TRL9 from:31/08/2027 till:06/09/2027
 bar:milestone0613 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:APAR
   color:TRL5 from:05/07/2027 till:18/07/2027
   color:TRL6 from:19/07/2027 till:02/08/2027
   color:TRL7 from:03/08/2027 till:16/08/2027
   color:TRL8 from:17/08/2027 till:30/08/2027
   color:TRL9 from:07/09/2027 till:13/09/2027
 bar:milestone0614 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:FTRC
   color:TRL5 from:14/09/2027 till:27/09/2027
   color:TRL6 from:18/09/2027 till:11/10/2027
   color:TRL7 from:12/10/2027 till:25/10/2027
   color:TRL8 from:26/10/2027 till:08/11/2027
   color:TRL9 from:04/01/2028 till:10/01/2028
 bar:milestone0615 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:RBRC
   color:TRL5 from:09/11/2027 till:22/11/2027
   color:TRL6 from:23/11/2027 till:05/12/2027
   color:TRL7 from:06/12/2027 till:19/12/2027
   color:TRL8 from:20/12/2027 till:03/01/2028
   color:TRL9 from:11/01/2028 till:17/01/2028
 bar:milestone0616 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:UVRC
   color:TRL5 from:18/01/2028 till:31/01/2028
   color:TRL6 from:01/02/2028 till:14/02/2028
   color:TRL7 from:15/02/2028 till:28/02/2028
   color:TRL8 from:29/02/2028 till:12/03/2028
   color:TRL9 from:13/03/2028 till:19/03/2028
  1. Software Development: Grace Hopper Team
  1. System Integration, DevOps, Maps, VBS, Sensors
  2. Prio #1: CAM, DISP, FPAD, GNSS, HT, INP, MMC, PTTH, SPOT, SRV, STT, SYS, VOVR
  3. Prio #2: ACC, ADM, FILE, DVC, MAP, NAV, PATH, REC, PLAY, SEC, STM
  4. Prio #3: TRSL
  5. Prio #4: VBS
  6. Prio #5:
 bar:milestone0701 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:CAM
   color:TRL5 from:11/05/2025 till:24/05/2025
   color:TRL6 from:25/05/2025 till:09/06/2025
   color:TRL7 from:02/09/2025 till:15/09/2025
   color:TRL8 from:09/06/2026 till:22/06/2026
   color:TRL9 from:20/10/2026 till:26/10/2026
 bar:milestone0702 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:DISP
   color:TRL5 from:11/05/2025 till:24/05/2025
   color:TRL6 from:25/05/2025 till:09/06/2025
   color:TRL7 from:02/09/2025 till:15/09/2025
   color:TRL8 from:09/06/2026 till:22/06/2026
   color:TRL9 from:20/10/2026 till:26/10/2026
 bar:milestone0703 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:FPAD
   color:TRL5 from:10/06/2025 till:23/06/2025
   color:TRL6 from:24/06/2025 till:06/07/2025
   color:TRL7 from:16/09/2025 till:29/09/2025
   color:TRL8 from:23/06/2026 till:05/07/2026
   color:TRL9 from:27/10/2026 till:02/11/2026
 bar:milestone0704 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:GNSS
   color:TRL5 from:10/06/2025 till:23/06/2025
   color:TRL6 from:24/06/2025 till:06/07/2025
   color:TRL7 from:16/09/2025 till:29/09/2025
   color:TRL8 from:23/06/2026 till:05/07/2026
   color:TRL9 from:27/10/2026 till:02/11/2026
 bar:milestone0705 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:HT
   color:TRL5 from:07/07/2025 till:20/07/2025
   color:TRL6 from:21/07/2025 till:04/08/2025
   color:TRL7 from:30/09/2025 till:13/10/2025
   color:TRL8 from:06/07/2026 till:19/07/2026
   color:TRL9 from:03/11/2026 till:09/11/2026
 bar:milestone0706 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:INP
   color:TRL5 from:07/07/2025 till:20/07/2025
   color:TRL6 from:21/07/2025 till:04/08/2025
   color:TRL7 from:30/09/2025 till:13/10/2025
   color:TRL8 from:06/07/2026 till:19/07/2026
   color:TRL9 from:03/11/2026 till:09/11/2026
 bar:milestone0707 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:MMC
   color:TRL5 from:05/08/2025 till:18/08/2025
   color:TRL6 from:19/08/2025 till:01/09/2025
   color:TRL7 from:14/10/2025 till:27/10/2025
   color:TRL8 from:20/07/2026 till:03/08/2026
   color:TRL9 from:10/11/2026 till:16/11/2026
 bar:milestone0708 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:PTTH
   color:TRL5 from:05/08/2025 till:18/08/2025
   color:TRL6 from:19/08/2025 till:01/09/2025
   color:TRL7 from:14/10/2025 till:27/10/2025
   color:TRL8 from:20/07/2026 till:03/08/2026
   color:TRL9 from:10/11/2026 till:16/11/2026
 bar:milestone0709 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:SPOT
   color:TRL5 from:28/10/2025 till:10/11/2025
   color:TRL6 from:11/11/2025 till:24/11/2025
   color:TRL7 from:01/03/2026 till:14/03/2026
   color:TRL8 from:04/08/2026 till:17/08/2026
   color:TRL9 from:17/11/2026 till:23/11/2026
 bar:milestone0710 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:SRV
   color:TRL5 from:28/10/2025 till:10/11/2025
   color:TRL6 from:11/11/2025 till:24/11/2025
   color:TRL7 from:01/03/2026 till:14/03/2026
   color:TRL8 from:04/08/2026 till:17/08/2026
   color:TRL9 from:17/11/2026 till:23/11/2026
 bar:milestone0711 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:STT
   color:TRL5 from:25/11/2025 till:07/12/2025
   color:TRL6 from:08/12/2025 till:21/12/2025
   color:TRL7 from:15/03/2026 till:28/03/2026
   color:TRL8 from:18/08/2026 till:31/08/2026
   color:TRL9 from:24/11/2026 till:30/11/2026
 bar:milestone0712 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:SYS
   color:TRL5 from:25/11/2025 till:07/12/2025
   color:TRL6 from:08/12/2025 till:21/12/2025
   color:TRL7 from:15/03/2026 till:28/03/2026
   color:TRL8 from:18/08/2026 till:31/08/2026
   color:TRL9 from:24/11/2026 till:30/11/2026
 bar:milestone0713 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:VOVR
   color:TRL5 from:22/12/2025 till:05/01/2026
   color:TRL6 from:06/01/2026 till:19/01/2026
   color:TRL7 from:12/04/2026 till:25/04/2026
   color:TRL8 from:01/09/2026 till:14/09/2026
   color:TRL9 from:30/11/2026 till:06/12/2026
 bar:milestone0714 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:ACC
   color:TRL5 from:22/12/2025 till:05/01/2026
   color:TRL6 from:06/01/2026 till:19/01/2026
   color:TRL7 from:12/04/2026 till:25/04/2026
   color:TRL8 from:01/09/2026 till:14/09/2026
   color:TRL9 from:30/11/2026 till:06/12/2026
 bar:milestone0715 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:ADM
   color:TRL5 from:20/01/2026 till:02/02/2026
   color:TRL6 from:03/02/2026 till:16/02/2026
   color:TRL7 from:17/02/2026 till:28/02/2026
   color:TRL8 from:15/09/2026 till:28/09/2026
   color:TRL9 from:07/12/2026 till:13/12/2026
 bar:milestone0716 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:FILE
   color:TRL5 from:20/01/2026 till:02/02/2026
   color:TRL6 from:03/02/2026 till:16/02/2026
   color:TRL7 from:17/02/2026 till:28/02/2026
   color:TRL8 from:15/09/2026 till:28/09/2026
   color:TRL9 from:07/12/2026 till:13/12/2026
 bar:milestone0717 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:DVC
   color:TRL5 from:26/04/2026 till:08/05/2026
   color:TRL6 from:09/05/2026 till:22/05/2026
   color:TRL7 from:23/05/2026 till:08/06/2026
   color:TRL8 from:29/09/2026 till:12/10/2026
   color:TRL9 from:14/12/2026 till:20/12/2026
 bar:milestone0718 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:MAP
   color:TRL5 from:26/04/2026 till:08/05/2026
   color:TRL6 from:09/05/2026 till:22/05/2026
   color:TRL7 from:23/05/2026 till:08/06/2026
   color:TRL8 from:29/09/2026 till:12/10/2026
   color:TRL9 from:14/12/2026 till:20/12/2026
 bar:milestone0719 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:NAV
   color:TRL5 from:21/12/2026 till:04/01/2027
   color:TRL6 from:05/01/2027 till:18/01/2027
   color:TRL7 from:19/01/2027 till:01/02/2027
   color:TRL8 from:02/02/2027 till:15/02/2027
   color:TRL9 from:25/04/2027 till:30/04/2027
 bar:milestone0720 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:PATH
   color:TRL5 from:21/12/2026 till:04/01/2027
   color:TRL6 from:05/01/2027 till:18/01/2027
   color:TRL7 from:19/01/2027 till:01/02/2027
   color:TRL8 from:02/02/2027 till:15/02/2027
   color:TRL9 from:25/04/2027 till:30/04/2027
 bar:milestone0721 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:REC
   color:TRL5 from:16/02/2027 till:28/02/2027
   color:TRL6 from:28/02/2027 till:13/03/2027
   color:TRL7 from:14/03/2027 till:27/03/2027
   color:TRL8 from:11/04/2027 till:24/04/2027
   color:TRL9 from:01/05/2027 till:07/05/2027
 bar:milestone0722 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:PLAY
   color:TRL5 from:16/02/2027 till:28/02/2027
   color:TRL6 from:28/02/2027 till:13/03/2027
   color:TRL7 from:14/03/2027 till:27/03/2027
   color:TRL8 from:11/04/2027 till:24/04/2027
   color:TRL9 from:01/05/2027 till:07/05/2027
 bar:milestone0723 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:SEC
   color:TRL5 from:08/05/2027 till:21/05/2027
   color:TRL6 from:22/05/2027 till:07/06/2027
   color:TRL7 from:08/06/2027 till:21/06/2027
   color:TRL8 from:22/06/2027 till:04/07/2027
   color:TRL9 from:31/08/2027 till:06/09/2027
 bar:milestone0724 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:STM
   color:TRL5 from:08/05/2027 till:21/05/2027
   color:TRL6 from:22/05/2027 till:07/06/2027
   color:TRL7 from:08/06/2027 till:21/06/2027
   color:TRL8 from:22/06/2027 till:04/07/2027
   color:TRL9 from:31/08/2027 till:06/09/2027
 bar:milestone0725 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:TRSL
   color:TRL5 from:05/07/2027 till:18/07/2027
   color:TRL6 from:19/07/2027 till:02/08/2027
   color:TRL7 from:03/08/2027 till:16/08/2027
   color:TRL8 from:17/08/2027 till:30/08/2027
   color:TRL9 from:07/09/2027 till:13/09/2027
 bar:milestone0726 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:VBS
   color:TRL5 from:05/07/2027 till:18/07/2027
   color:TRL6 from:19/07/2027 till:02/08/2027
   color:TRL7 from:03/08/2027 till:16/08/2027
   color:TRL8 from:17/08/2027 till:30/08/2027
   color:TRL9 from:07/09/2027 till:13/09/2027
  1. Software Development: Evelyn Berezin Team
  1. IMS, Chat, Workgroups, Tasks, Mission planning
  2. Prio #1: CHAT, IMSG,
  3. Prio #2: CRPT, MSG, TSK, WGR
  4. Prio #3: ANLS, CAL, MAIL, PLAN
  5. Prio #4: WIKI
  6. Prio #5:
 bar:milestone0801 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:CHAT
   color:TRL5 from:11/05/2025 till:24/05/2025
   color:TRL6 from:25/05/2025 till:09/06/2025
   color:TRL7 from:02/09/2025 till:15/09/2025
   color:TRL8 from:09/06/2026 till:22/06/2026
   color:TRL9 from:20/10/2026 till:26/10/2026
 bar:milestone0802 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:IMSG
   color:TRL5 from:10/06/2025 till:23/06/2025
   color:TRL6 from:24/06/2025 till:06/07/2025
   color:TRL7 from:16/09/2025 till:29/09/2025
   color:TRL8 from:23/06/2026 till:05/07/2026
   color:TRL9 from:27/10/2026 till:02/11/2026
 bar:milestone0803 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:CRPT
   color:TRL5 from:07/07/2025 till:20/07/2025
   color:TRL6 from:21/07/2025 till:04/08/2025
   color:TRL7 from:30/09/2025 till:13/10/2025
   color:TRL8 from:06/07/2026 till:19/07/2026
   color:TRL9 from:03/11/2026 till:09/11/2026
 bar:milestone0804 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:MSG
   color:TRL5 from:05/08/2025 till:18/08/2025
   color:TRL6 from:19/08/2025 till:01/09/2025
   color:TRL7 from:14/10/2025 till:27/10/2025
   color:TRL8 from:20/07/2026 till:03/08/2026
   color:TRL9 from:10/11/2026 till:16/11/2026
 bar:milestone0805 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:TSK
   color:TRL5 from:28/10/2025 till:10/11/2025
   color:TRL6 from:11/11/2025 till:24/11/2025
   color:TRL7 from:01/03/2026 till:14/03/2026
   color:TRL8 from:04/08/2026 till:17/08/2026
   color:TRL9 from:17/11/2026 till:23/11/2026
 bar:milestone0806 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:WGR
   color:TRL5 from:25/11/2025 till:07/12/2025
   color:TRL6 from:08/12/2025 till:21/12/2025
   color:TRL7 from:15/03/2026 till:28/03/2026
   color:TRL8 from:18/08/2026 till:31/08/2026
   color:TRL9 from:24/11/2026 till:30/11/2026
 bar:milestone0807 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:ANLS
   color:TRL5 from:22/12/2025 till:05/01/2026
   color:TRL6 from:06/01/2026 till:19/01/2026
   color:TRL7 from:12/04/2026 till:25/04/2026
   color:TRL8 from:01/09/2026 till:14/09/2026
   color:TRL9 from:30/11/2026 till:06/12/2026
 bar:milestone0808 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:CAL
   color:TRL5 from:20/01/2026 till:02/02/2026
   color:TRL6 from:03/02/2026 till:16/02/2026
   color:TRL7 from:17/02/2026 till:28/02/2026
   color:TRL8 from:15/09/2026 till:28/09/2026
   color:TRL9 from:07/12/2026 till:13/12/2026
 bar:milestone0809 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:MAIL
   color:TRL5 from:26/04/2026 till:08/05/2026
   color:TRL6 from:09/05/2026 till:22/05/2026
   color:TRL7 from:23/05/2026 till:08/06/2026
   color:TRL8 from:29/09/2026 till:12/10/2026
   color:TRL9 from:14/12/2026 till:20/12/2026
 bar:milestone0810 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:PLAN
   color:TRL5 from:21/12/2026 till:04/01/2027
   color:TRL6 from:05/01/2027 till:18/01/2027
   color:TRL7 from:19/01/2027 till:01/02/2027
   color:TRL8 from:02/02/2027 till:15/02/2027
   color:TRL9 from:25/04/2027 till:30/04/2027
 bar:milestone0811 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:WIKI
   color:TRL5 from:16/02/2027 till:28/02/2027
   color:TRL6 from:28/02/2027 till:13/03/2027
   color:TRL7 from:14/03/2027 till:27/03/2027
   color:TRL8 from:11/04/2027 till:24/04/2027
   color:TRL9 from:01/05/2027 till:07/05/2027
  1. Software Development: Barbara Askins Team
  1. Computer Vision, Computer Audition, AI/ML, AI/DL, AI/NLP, AI/ANN
  2. Prio #1: TESS
  3. Prio #2: CVC, FA
  4. Prio #3: CAC
  5. Prio #4: VM
  6. Prio #5:
 bar:milestone0901 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:TESS
   color:TRL5 from:11/05/2025 till:24/05/2025
   color:TRL6 from:25/05/2025 till:09/06/2025
   color:TRL7 from:02/09/2025 till:15/09/2025
   color:TRL8 from:09/06/2026 till:22/06/2026
   color:TRL9 from:20/10/2026 till:26/10/2026
 bar:milestone0902 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:CVC
   color:TRL5 from:10/06/2025 till:23/06/2025
   color:TRL6 from:24/06/2025 till:06/07/2025
   color:TRL7 from:16/09/2025 till:29/09/2025
   color:TRL8 from:23/06/2026 till:05/07/2026
   color:TRL9 from:27/10/2026 till:02/11/2026
 bar:milestone0903 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:FA
   color:TRL5 from:07/07/2025 till:20/07/2025
   color:TRL6 from:21/07/2025 till:04/08/2025
   color:TRL7 from:30/09/2025 till:13/10/2025
   color:TRL8 from:06/07/2026 till:19/07/2026
   color:TRL9 from:03/11/2026 till:09/11/2026
 bar:milestone0904 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:CAC
   color:TRL5 from:05/08/2025 till:18/08/2025
   color:TRL6 from:19/08/2025 till:01/09/2025
   color:TRL7 from:14/10/2025 till:27/10/2025
   color:TRL8 from:20/07/2026 till:03/08/2026
   color:TRL9 from:10/11/2026 till:16/11/2026
 bar:milestone0905 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:VM
   color:TRL5 from:28/10/2025 till:10/11/2025
   color:TRL6 from:11/11/2025 till:24/11/2025
   color:TRL7 from:01/03/2026 till:14/03/2026
   color:TRL8 from:04/08/2026 till:17/08/2026
   color:TRL9 from:17/11/2026 till:23/11/2026
  1. Networking: Margaret Hamilton Team
  1. Mentor Relations, Pitches, Updates
  2. Prio #1: Mentor Relations, Updates
  3. Prio #2: Business angels (pre-seed round)
  4. Prio #3: Business angels & Venture capital (seed round)
  5. Prio #4: Venture capital (round A)
  6. Prio #5:
 bar:milestone1001 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Mentorship
   color:PROCESS from:20/07/2024 till:01/07/2027
 bar:milestone1002 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Updates, PR
   color:PROCESS from:01/10/2024 till:31/12/2028
 bar:milestone1003 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Investors
   color:PROCESS from:01/11/2024 till:01/04/2025
   color:PROCESS from:01/05/2025 till:01/10/2025
   color:PROCESS from:01/11/2025 till:01/04/2026
   color:PROCESS from:01/07/2027 till:01/01/2028
 bar:milestone1004 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Cofounders in Germany
   color:PROCESS from:01/01/2025 till:01/04/2025
   color:PROCESS from:01/09/2025 till:01/01/2026
   color:PROCESS from:01/07/2026 till:01/01/2027
 bar:milestone1005 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Cofounders in the U.S.
   color:PROCESS from:01/04/2025 till:01/09/2025
   color:PROCESS from:01/01/2026 till:01/07/2026
   color:PROCESS from:01/01/2027 till:31/12/2028
  1. Customer & Business Development: Barbara Liskov Team
  1. Requests, eMails, PR, Meetings
  2. Prio #1: Innovation programs research, requests, eMails, meetings
  3. Prio #2: Collaboration research, PR
  4. Prio #3: Proving ground testing
  5. Prio #4: Pilot programs
 bar:milestone1101 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:DoD programs research
   color:PROCESS from:01/01/2025 till:31/12/2028
 bar:milestone1102 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Collaboration research
   color:PROCESS from:01/01/2025 till:31/12/2028
 bar:milestone1103 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Proving ground testing
   color:PROCESS from:01/04/2026 till:01/01/2028
 bar:milestone1104 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Pilot programs
   color:PROCESS from:01/10/2026 till:31/12/2028
 bar:milestone1105 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Experimental manufacturing
   color:PROCESS from:01/10/2025 till:31/12/2028
 bar:milestone1106 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Serial mfg in Germany
   color:PROCESS from:01/07/2026 till:31/12/2028
 bar:milestone1107 width:10
   textcolor:NAME at:01/01/2024 shift:(25,$dy) text:Serial mfg in the U.S.
   color:PROCESS from:01/10/2028 till:31/12/2028
 bar:0 width:1
   textcolor:red at:15/03/2025 shift:(-15,-4) text:Pre-Seed
   textcolor:red at:15/09/2025 shift:(-10,-4) text:Seed
   textcolor:red at:15/03/2026 shift:(-15,-4) text:round A
   textcolor:red at:15/12/2027 shift:(-15,-4) text:round B
 bar:99 width:1
   textcolor:oceanblue at:01/07/2025 shift:(-25,-4) text:MVP Alpha >
   textcolor:oceanblue at:01/01/2026 shift:(-25,-4) text:MVP Beta >
   textcolor:oceanblue at:01/10/2026 shift:(-25,-4) text:MMP Gamma >
   textcolor:oceanblue at:01/01/2027 shift:(25,-4) text:MMP Delta >

LineData=

  at:$now color:TODAY width:0.2
  at:01/07/2025 color:powderblue width:0.2 layer:back #deadline of end TRL-6 (MVPα)
  at:01/01/2026 color:powderblue width:0.2 layer:back #deadline of end TRL-7 (MVPβ)
  at:01/10/2026 color:powderblue width:0.2 layer:back #deadline of end TRL-8 (MMPδ)
  at:01/04/2027 color:powderblue width:0.2 layer:back #deadline of end TRL-9 (MMPγ)
  at:25/03/2025 color:pink width:10 layer:back
  at:25/09/2025 color:pink width:10 layer:back
  at:25/03/2026 color:pink width:10 layer:back
  at:25/12/2027 color:pink width:10 layer:back

</timeline>

Investment Rounds Goals

Time Period Round Amount Goals
Q1 2025 Pre-Seed $1,750,000
  • [TRL 7] MVPα:
  • [TRL 8] MVPβ:
Q3 2025 Seed $6,700,000
  • [TRL 9, SRL 3] MMPδ:
  • [IRL 6, SRL 4] MMPγ:
  • Experimental manufacturing
  • Proving ground testing
Q1 2026 Round A $16,000,000
  • Serial manufacturing in Germany (manual assembly)
  • Proving ground testing
  • [IRL 7] Pilot programs, V&V product, PMF
Q4 2027 Round B $85,000,000
  • Full robotic lines implementation
  • Serial robotized manufacturing in the U.S.
  • [SRL 5] Scaling and operational support

Development Teams

Design Development & Algorithm Architecture: Ada Lovelace[4] Team

Device design, GUI, VUI, Apps algorithms, Demos, Videos, Animations

  • Prio #1: Research and description of the principle of operation, description of the technology application, computer-added design, event-driven software architecture[5]
  • Prio #2: Technology functionality demo, specific functionality description, GUI demo, lab experimental setup

Mechanical Engineering: Stephanie Kwolek[6] Team

  • Prio #1: [TRL 5-6] Prototype: based on 3D print, vacuum casting, vacuum unfusion
  • Prio #2: [TRL 7] MVPα: vacuum casting, vacuum unfusion, injection moulding, manual assembly
  • Prio #3: [TRL 8] MVPβ: vacuum casting, vacuum unfusion, injection moulding, manual assembly
  • Prio #4: [TRL 9] MMPδ: manufacturing process automation, robotic assembly, add-ons (auto tourniquets, Care Under Fire set, SCBA integration, external aramid cover, continuous wind сapture impellers, software defined antenna, handheld metal re-radiation radar, optional battery, digital sight)
  • Prio #5: MMPγ: manufacturing & assembly & logistic process upgrade

Optical Engineering: Katharine Blodgett[7] Team

Light guide, Beam splitting prisms, Dichroic mirror, Optical coatings, Fading pads

  • Prio #1: [TRL 5-6] Prototype: optical scheme, light guide, dichroic mirror, fading pads
  • Prio #2: [TRL 7] MVPα: beam splitting prisms for 3 cam sensors, optical coatings
  • Prio #3: [TRL 8] MVPβ:
  • Prio #4: [TRL 9] MMPδ:
  • Prio #5: MMPγ:

Electronics Engineering: Ida Hyde[8] Team

Schematics and PCBs for motherboard, projector, IFF Transponder, SDR, SDRS, PCSR, Digital sight

  • Prio #1: [TRL 5-6] Prototype: based on Raspberry Pi 5B, Texas Instruments DLPDLCR2000EVM
  • Prio #2: [TRL 7] MVPα: motherboard chipset Intel 700, Z790[9] or HM770[10], CPU Intel Core i7-14700HX[11][12], DLP PCB, SDRS PCB, IFF PCB
  • Prio #3: [TRL 8] MVPβ: SDR2 PCB, add-on (software defined antenna, optional battery, continuous wind capture impellers)
  • Prio #4: [TRL 9] MMPδ: add-on (auto tourniquets, Care Under Fire set, handheld metal re-radiation radar)
  • Prio #5: MMPγ: add-on (digital sight)

Software Development: Hedy Lamarr[13] Team

SDR, SDR Scan, RDF, Radar Detection, IFF, Networks, Remote control

Software Development: Grace Hopper[14] Team

System Integration, DevOps, Maps, VBS, Sensors

Software Development: Evelyn Berezin[15] Team

IMS, Chat, Workgroups, Tasks, Mission planning

Software Development: Barbara Askins[16] Team

Computer Vision, Computer Audition, AI/ML, AI/DL, AI/NLP, AI/ANN

Networking: Margaret Hamilton[17] Team

Mentor Relations, Pitches, Updates

  • Prio #1: Mentor Relations, Updates
  • Prio #2: Business angels (pre-seed round)
  • Prio #3: Business angels & Venture capital (seed round)
  • Prio #4: Venture capital (round A)
  • Prio #5:

Customer & Business Development: Barbara Liskov[18] Team

Requests, eMails, PR, Meetings

  • Prio #1: Innovation programs research, requests, eMails, meetings
  • Prio #2: Collaboration research, PR
  • Prio #3: Proving ground testing
  • Prio #4: Pilot programms

Future ideas

Further reading

FAQ

See also

Public External Sections: Public Wiki Sections: Public Wiki Sections: Not-Public Wiki Sections:

Note: Unless otherwise stated, whenever the masculine gender is used, both men and women are included.

See also product details

Hardware Details: Functional Apps Details: Executive Apps Details: Service Apps Details:


References